Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Campus Utility Infrastructure

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Campus Utility Infrastructure involves the installation of comprehensive campus-wide utilities for prime contractors on Air Force Civil Engineer Center projects located at Nellis AFB. The scope of work includes the deployment of water mains, sewage lines, electrical grids, and fiber optic communications cabling, utilizing industrial piping and high-voltage cabling to ensure a fully functional network connecting all campus facilities. The project is managed under the Department of Defense and requires strict adherence to Unified Facilities Guide Specifications and CMMC Level 1 compliance. Classified under NAICS code 237990, the contract was posted on October 30, 2026, with a response deadline of November 18, 2026.

General Info

Subcontract for installing water, sewage, electrical, and fiber utilities at Nellis Air Force Base.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

0, NV, 89191, USA

Set-Aside

NONE

Documents

This scope was carved out of FA890327M1006.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8903 772 Ess Pk
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs campus-wide utilities for prime contractors on Air Force Civil Engineer Center (AFCEC) projects at Nellis AFB. Performs installation of water mains, sewage lines, electrical grids, and fiber optic communications cabling using industrial piping and high-voltage cabling. Adheres to UFGS and CMMC Level 1. Delivers a fully functional utility network connecting all campus facilities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
Construction of Big White Pickleball Courts
Solicitation # RDKB-26-PBCBW
The Regional District of Kootenay Boundary (RDKB) is soliciting bids for the construction of two pickleball courts at the Big White Ski Resort, specifically located at the Happy Valley Skating Rink in British Columbia. This unit price contract encompasses a comprehensive scope of work including earthworks, site grading, drainage, the removal of oversized boulders, pavement construction, concrete curbing, asphalt paving, and court surfacing. Key deliverables include the installation of cast-in-place net pole bases and the provision of survey layout and project record documents. The project is scheduled for substantial completion by June 7, 2027, with final completion required by June 15, 2027. Prospective bidders must submit their proposals in PDF format via email to Mark Daines by the December 11, 2026, deadline. Submissions must include detailed company information, a designated Project Manager as the single point of contact, at least two relevant references, and a comprehensive fee structure including a total maximum upset fee and a schedule of hourly rates. Bidders must also provide a work plan, methodology, and a list of all proposed subconsultants. Mandatory requirements include the ability to maintain Comprehensive General Liability Insurance of at least 5,000,000.00 CAD, compliance with the British Columbia Workers Compensation Act, and the submission of a Health and Safety Manual and Occupational Health and Safety Plan prior to commencing onsite work. Award decisions are based on a ranking process, and the successful proponent must provide performance security within 10 days of being deemed the highest ranked.
Regional District of Kootenay-Boundary

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → FA8903 772 Ess Pk

Same awarding agency

NAICS: 236220
New
Federal
MACH1_AOI_FA890327M1006_F-47 Future Campus at Nellis AFB
Solicitation # FA890327M1006
The 772d Enterprise Sourcing Squadron, in coordination with the Air Force Civil Engineer Center, is seeking highly qualified Design-Build teams for the F-47 Future Campus at Nellis Air Force Base, Nevada. This initiative is a programmed military construction project totaling approximately 1.057 billion dollars, aimed at providing the infrastructure necessary for the F-47 mission. The current acquisition focuses on Rapid Delivery Projects, including a combined operations and maintenance hangar, a reprogramming laboratory, a simulator facility, an aircraft apron with sunshades, and supporting utilities. The government intends to utilize a Progressive Design-Build model, collaborating with a selected partner to advance designs and evaluate technical solutions before negotiating firm-fixed-price construction agreements, targeted for approximately 65 percent design completion. This procurement is executed as an Other Transaction Agreement under the authority of 10 U.S.C. section 2808a and the Modernized Agile Construction Horizons (MACH1) Umbrella Program, meaning the FAR does not apply and there is no small-business set-aside. The selection process consists of three phases: a Phase 1 Solution Brief, Phase 2 Oral Presentations, and Phase 3 Negotiations, with a target initial award date of February 5, 2027. Evaluation is holistic, focusing on relevance to the area of interest, the merit of the constructability concept, and company viability. Key requirements include CMMC Level 2 certification for design teams and CMMC Level 1 for construction teams. The project timeline extends from initial award in early 2027 through the completion of rapid delivery projects by March 2031, with potential future work for the remainder of the campus extending into 2032.
Commercial and Institutional Building Construction

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS