Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AK ANG BASE SUPPLY COMPLEX, JBER, ALASKA

Closed
W911KB26RA016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical system upgrades encompass HVAC, exhaust extraction, compressed air, and a full NFPA-compliant fire suppression system, alongside updated electrical distribution, lighting, low-voltage systems, and building automation controls. Site improvements involve paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, as well as hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are evaluated based on the lowest price for two primary line items: building renovation and paving work. Bidders must adhere to Davis-Bacon Act wage determinations and Buy American requirements. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The contract mandates strict quality control through a three-phase inspection process and requires a 20-year no dollar limit warranty on specific roofing components. All invoicing must be processed through Wide Area WorkFlow using specific NAVFAC forms.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This solicitation issued by J&J Contractors, Inc. seeks pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The scope of work is extensive, covering demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevators, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside project subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore dormitory, administrative, medical, and dental areas across the first, second, and third floors following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, flooring replacement with a required 20-year warranty for Luxury Vinyl Plank, rubber wall base installation, electrical repairs, and vanity or cabinet replacement. All work must comply with ADA, OSHA, EPA, and NFPA-101 life safety codes, as well as local Massachusetts building ordinances. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must have attended a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract mandates Net 30 payment terms and requires subcontractors to adhere to Davis-Bacon Act labor standards, including specific minimum wage and paid sick leave requirements.
Grafton Job Corps

POSTED

about 9 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance, equipment clearances, and sealed penetrations are maintained. This solicitation is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive description of proposed work methods including project phasing and occupied-building protection, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100. Awardees must provide payment and performance bonding for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD requires the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 9 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Alaska Air National Guard Supply Complex at Joint Base Elmendorf-Richardson, Alaska, is a critical infrastructure project involving the design and construction of a 52,000-square-foot high-bay supply warehouse and a 5,600-square-foot administrative support facility to meet training, logistical, and operational needs. The total project scope includes loading docks, classified and weapons storage vaults, mechanical mezzanines, secure outdoor storage, parking, utilities, drainage, and integration with the Builder Sustainment Management System, along with provisions for a portable backup generator connection to ensure mission continuity. The contract has a strict cost ceiling of $40,000,000 and is being managed by the U.S. Army Corps of Engineers, Alaska District, under solicitation number W911KB26RA016, issued with an amendment dated March 31, 2026. Proposals must be submitted electronically through the PIEE Solicitation Module by April 10, 2026, following detailed formatting requirements including searchable PDFs for the full proposal and Excel files for pricing, with strict page limits and restart numbering per volume section. The solicitation is restricted to three pre-selected contractors: Bethel Contracting, LLC, Bristol Design Building Services, LLC, and GHEMM Solutions, LLC, who are invited to participate in Phase 2 of the acquisition. The contract will be awarded on a best value basis using evaluation factors not fully detailed in the documentation, but the process incorporates risk assessments and cost realism analysis. All offerors must comply with stringent cybersecurity requirements, including NIST SP 800-171 Rev 1 controls, CMMC Level 1 certification verified in the Supplier Performance Risk System, and DFARS clauses for safeguarding covered defense information. Compliance with the Buy American Act is mandatory for construction materials, and offerors must self-certify their size status, UEI, and CAGE code in SAM. The work site is located exclusively at JBER, Alaska, with acceptance authority resting with the Contracting Officer, and key administrative oversight provided by George Nasif and Valeria Fisher. No specific contract type, payment details, COR/COTR names, or FOB terms are stated, and while packaging, preservation, and marking requirements are not addressed, the contract includes clauses governing site visits, proposal preparation, protest service, and priority rating for national defense.

General Info

U.S. Army Corps seeks input on Project Labor Agreement feasibility for $25-$100M Alaska construction.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

AK

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

special-notice

Notice updated

Notice type changed from Special Notice to Presolicitation. Response deadline changed from Jan 6, 2026 to Mar 11, 2026. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed. The point of contact changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
Contacts2 people available
OfficeANCHORAGE, AK, 99506-0898, USA

Full Description

Show more

PROJECT TITLE: AK ANG BASE SUPPLY COMPLEX, JBER, ALASKAPROJECT LOCATION: JOINT BASE ELMENDORF RICHARDSON (JBER)ALASKA AIR NATIONAL GUARD SUPPLY COMPLEX, A 52,000 SF HIGH-BAY SUPPLY COMPLEX AND ASSOCIATED 5,600 SF MANAGEMENT SUPPORT ADMINISTRATIVEFACILITY THAT SUPPORTS TRAINING, ADMINISTRATIVE, AND LOGISTICAL REQUIREMENTS FOR THE AKARNG.



***********************************************************************


THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE THREE CONTRACTORS ARE AS FOLLOWS:


Bethel Contracting, LLC


Bristol Design Building Services, LLC


GHEMM Solutions, LLC



AM-0002 to release Phase 2 of this Solicitation is available ONLY to the Offerors selected to participate in Phase 2.


***********************************************************************

More opportunities from Department Of Defense → W2SN Endist Alaska

Same awarding agency

NAICS: 236220
New
Federal
ACC003 Weapons Generation Complex and Northern Flightline
Solicitation # W911KB27RWP01
The U.S. Army Corps of Engineers, Alaska District, is soliciting a Design-Build Team for the ACC003 Weapons Generation Complex (WGC) and Northern Flightline project at Joint Base Elmendorf-Richardson, Alaska. This initiative is part of the broader Fighter Town Recapitalization (FTR) Program, which aims to modernize and expand infrastructure while maintaining active airfield operations. The scope involves the construction of approximately sixteen new facilities, including hangars, operations buildings, and munitions storage magazines, as well as the demolition of legacy WGC facilities. A critical requirement is that the new WGC must be operational before the existing facility is decommissioned to ensure zero operational downtime. The project will be executed on pre-excavated sites with preconstructed utilities and is expected to be completed by the end of Fiscal Year 2032. This procurement is conducted as an Other Transaction (OT) Agreement under Title 10 U.S.C. 2808a, meaning it is not subject to the Federal Acquisition Regulation (FAR) unless expressly incorporated. The project utilizes a Progressive Design-Build (PDB) delivery model divided into two phases: Phase 1 focuses on design and preconstruction services, while Phase 2 covers final design, procurement, and construction. Selection is based on a qualifications-based approach involving a two-step process: a White Paper evaluation focusing on scale, complexity, cold-weather experience, and personnel qualifications, followed by Pitch Presentations evaluating conceptual execution, risk mitigation, and resource capability. Award may be a single whole-scope contract or split between two offerors.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Federal
(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities
Solicitation # W911KB27RWP12
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for the site-wide repair and replacement of fire alarm systems at Eareckson Air Station on Shemya Island, Alaska. The project involves upgrading approximately 45 buildings by replacing antiquated, non-compliant systems with a standardized wireless or hybrid addressable architecture, specifically utilizing Monaco systems. This initiative aims to meet UFC 3-600-01 and NFPA 72 requirements while reducing reliance on buried fiber optic infrastructure. Key technical challenges include ensuring the system can withstand sub-arctic maritime conditions, such as hurricane-force winds and high salt-spray corrosion, and operating without interference from high-power military radar and telemetric systems. The estimated acquisition magnitude is between 27 million and 33 million dollars, with an anticipated performance period spanning fiscal years 2027 through 2030. The government intends to utilize a Progressive Design-Build delivery method via Other Transaction Authority under 10 U.S.C. section 2808a. The project will be executed in two phases: an initial design and pre-construction phase to refine requirements and develop a Guaranteed Maximum Price, followed by a construction phase authorized in staggered packages to minimize operational impact on the remote installation. This Request for Information is for market research purposes only and does not constitute a formal solicitation.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS