This Solicitation opportunity from Georgia was posted on July 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Albany State University RFQ/P - CEP Cooling Tower Replacement

Closed
52100-eRFP-001828-2027State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
CRAg01 - Hawk Highwalls
Solicitation # CR-Ag-01
The Hawk Highwalls Reclamation Project (CR-Ag-01) is an abandoned mine land reclamation effort located in Augusta Township, Carroll County, Ohio. The project aims to eliminate safety hazards at a pre-law coal mine site by backfilling three dangerous highwalls, ranging from 30 to 58 feet in height, and addressing four hazardous water bodies with insufficient discharge structures. The scope of work includes clearing and grubbing, impoundment dewatering, earthwork to establish safe side slopes and positive drainage, and the installation of engineered catch basin risers, plunge pools, and sediment control structures. Following construction, the contractor must perform standard revegetation and a subsequent maintenance period involving the removal of temporary structures and final grading. The project is estimated at $2,029,473.00, with a construction completion date of September 25, 2027. The procurement process requires a mandatory pre-bid meeting on October 22, 2026, with bids due by November 5, 2026, via Bid Express. Award will be granted to the lowest responsive and responsible bidder based on experience, financial condition, and execution capability. Key compliance requirements include adherence to Davis-Bacon prevailing wage rates, a 5% EDGE business enterprise participation goal, and the provision of a performance bond in the amount of $26,622.50. The project follows ODOT Construction and Material Specifications (January 1, 2023) and requires compliance with the Ohio EPA Construction Site Stormwater General Permit. Payment is processed monthly through the Division's electronic system, with an 8% retainage on labor until the work is 50% complete.
ODNR-Division of Mineral Resources Management

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
Federal
Belle Fountain Ditch Cleanout Phase 2
Solicitation # W912EQ26BA002
Solicitation W912EQ26BA002 is a firm-fixed-price contract issued by the US Army Corps of Engineers, Memphis District, for the Belle Fountain Ditch Cleanout Phase 2 project in Pemiscot County, Missouri. The scope of work requires the provision of all plant, labor, and materials for channel cleanout of the Belle Fountain Ditch region, specifically covering the Bypass of Steele and Main Ditch. The project limits begin at the confluence of New Franklin Ditch and Bypass of Steele, extending north through Main Ditch and ending approximately 100 feet before the intersection of Main Ditch and County Rd. 442, roughly 2.5 miles south of Braggadocio. The estimated construction magnitude is between 1 million and 5 million dollars. This procurement is a set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 237990. Bidders must enter a National Institute of Standards and Technology score in the Supplier Performance Risk System to be considered responsive. Key requirements include the submission of pre- and post-construction surveys in Autodesk compatible files and the provision of a certified Construction Quality Management for Contractors manager. Awarded contractors must submit performance and payment bonds, a certificate of insurance, and approved accident prevention, environmental protection, and quality control plans within specified post-award timeframes. Progress payments will be made monthly via RMS based on work accomplished.
W07V Endist Memphis

POSTED

about 19 hours ago

DEADLINE

in 13 days
NAICS: 237990
New
Federal
KC-46A ADAL Apron and Hydrant Fueling Pits
Solicitation # W9127825RA068
Solicitation W9127825RA068 is a design-bid-build construction project for the KC-46A ADAL Apron and Hydrant Fueling Pits at MacDill Air Force Base, Florida. The scope of work includes replacing the north apron and taxilane pavement, upgrading the stormwater drainage system, and enhancing the fuel hydrant system to support the simultaneous fueling of four aircraft at 600 GPM each. Additional requirements include increasing the Motor Control Center capacity from 800 to 1000 amps and installing new airfield lighting, including apron edge lights and additional fixtures on existing and new poles. The estimated project cost ranges from 60 million to 120 million dollars. The contract will be awarded based on a best value source selection where non-priced evaluation factors are significantly more important than price. The primary evaluation factors are the prime contractor's past performance and the technical approach, while the small business approach is rated as acceptable or unacceptable. Price is evaluated using the Price Includes Variation Over Time method. Other than small business offerors must provide a subcontracting plan per FAR 52.219-9, Alternate II, to be eligible for award. Performance must begin within eight calendar days of award, and performance and payment bonds are required within ten calendar days. Proposals must be submitted electronically via the PIEE portal by October 23, 2026.
W074 Endist Mobile

POSTED

about 19 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is an Invitation for Bid issued by the National Park Service Denver Service Center for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. This Small Business Set-Aside project is a Firm-Fixed-Price contract with an estimated magnitude between $1 million and $5 million. The scope of work involves repairing and extending a seawall damaged by Hurricane Ian, specifically requiring selective demolition, the installation of weatherable rigid vinyl and FRP composite sheet pile walls, and comprehensive site restoration including soil backfilling, sodding, and the installation of limestone riprap. All work must be completed within a mandatory performance period of 259 calendar days, starting within 10 days of award. The government will utilize the Best Value Continuum Tradeoff Process for award, where non-price factors—including technical approach, schedule, and management approach—are significantly more important than price. Bids are due by November 6, 2026, and must be submitted via email. Contractors are required to provide a Job Site Safety Manager, a written Quality Control plan, and must adhere to the Archaeological Resources Protection Act of 1979 to protect soil deposits. Compliance with the Davis-Bacon Act and specific environmental standards, such as the use of biodegradable packaging and recycled materials, is mandatory. Payment requests must be processed electronically through the Invoice Processing Platform System following a seven-day draft review by the Contracting Officer's Representative.
Dsc Contracting Services Division

POSTED

about 19 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

Albany State University, acting on behalf of the Board of Regents of The University System of Georgia, is seeking qualified Construction Manager at Risk firms to handle the replacement of the aging cooling tower at the East Campus Central Energy Plant in Albany, Georgia. The existing cooling tower, installed in 1997, has exceeded its service life and requires full removal and replacement with modern factory-fabricated steel units mounted on the existing concrete basin. The scope includes removing outdated wood-framed components and vertical turbine pumps, installing new pumps in the existing sump, upgrading the building automation system to accommodate the new equipment, adding variable frequency drives for energy efficiency, performing electrical modifications, and conducting system testing and balancing. The project aims to ensure reliable chilled water production for critical campus HVAC systems while modernizing outdated infrastructure. The procurement follows a two-stage qualification-based selection process. Stage I involves submitting qualifications, after which a limited number of firms will be selected as finalists to proceed to Stage II, where detailed proposals will be requested. Finalists must attend a mandatory pre-proposal site visit before submitting their proposals. The solicitation, identified as 52100-eRFP-001828-2027, was posted on July 15, 2026, with responses due by August 7, 2026. All submissions must be directed to Jared Peden, the primary point of contact, and further information is available through the official state procurement portal. This project is being handled under the State of Georgia’s public agency procurement procedures and is open to qualified firms with demonstrable experience in similar energy plant upgrades.

General Info

Albany State University seeks qualified CM at Risk to replace aging cooling tower at East Campus Energy Plant with modern equipment and system upgrades.

Documents

1

52100-eRFP-001828-2027 Albany State University Cooling Tower Replacement RFP

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Albany State University
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Albany State University (Using Agency) on behalf of the Board of Regents of The University System of Georgia (Owner) is soliciting responses from Construction Manager at Risk Firms interested in and capable of providing construction services for the Replacement of the Cooling Tower at the East Campus Central Energy Plant on the campus of Albany State University in Albany, Georgia.  A project description is provided below:   Project Background The Central Energy Plant at Albany State University's East Campus was constructed in 1997 and provides chilled water and heating water for HVAC systems in several high profile buildings on campus. The existing field erected cooling tower serving the chillers in the Central Energy Plant is vintage to the original construction. The tower assembly is beyond its expected service life and is in need of replacement.  Project  Description  The project involves removal of the existing wood framed field erected cooling tower assembly and associated vertical turbine tower pumps, installation of new factory fabricated steel cooling towers on the existing concrete basin, and modifying existing basin to receive the footprint of the new cooling towers. The project also includes installation of new vertical turbine tower pumps in the existing concrete sump.  Additional scope includes installation of new VFD's to serve the cooling towers, upgrades to the existing building automation system to accomodate the new towers, test and balance of the completed condenser water system, and electrical work to support removal and installation of mechanical sysetms.    This Qualification Based Selection will be completed in two Stages (also referred as "steps" in this event and in attached documents); Stage I: Request for Qualifications and Stage II: Request for Proposals (From Qualified Finalists). The University will evaluate and select several qualified firms from the response submittals in Stage I and notify the finalist firms to proceed to Stage II. The University will then post Stage II documents, conduct a mandatory pre-proposal site visit, evaluate/review the submitted request for proposals and interview

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS