Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ALD System Operator and Maintenance Training

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract opportunity, issued by the Naval Research Laboratory under the Department of Defense, focuses on providing specialized technical training for ALD System Operation and Maintenance. The primary objective is to instruct prime contractor personnel on complex technical processes, including Windows-11 GUI process control, precursor loading, gas line management, and the use of residual gas analyzers. Training also encompasses critical safety interlock emergency procedures to ensure personnel can safely and effectively manage the systems. The successful contractor will be responsible for delivering trained staff capable of operating systems to achieve specific film growth requirements for materials such as Al2O3, HfO2, and TiN. This is a Small Business Set-Aside contract with a performance location in Washington. Interested parties must note the posting date of September 1, 2026, with a response deadline of September 14, 2026.

General Info

Small business subcontract for technical ALD system operation and maintenance training in Washington.

NAICS

611430 - Professional and Management Development Training

Place of Performance

Washington, DC, USA

Set-Aside

SBA

Documents

This scope was carved out of N00173-26-Q-TB02.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Atomic Layer Deposition (ALD) Reactor System

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Naval Research Laboratory
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical training for prime contractors on Naval Research Laboratory (NRL) projects. Instructs personnel on Windows-11 GUI process control, precursor loading, gas line management, residual gas analyzer use, and safety interlock emergency procedures. Delivers trained NRL staff capable of operating the system to achieve specified film growth including Al2O3, HfO2, and TiN.

More opportunities from Department Of Defense → Naval Research Laboratory

Same awarding agency

NAICS: 238210
New
Federal
Air Compressor Relocation
Solicitation # N0017326Q1905
Solicitation N0017326Q1905 is a firm-fixed-price requirement for the Naval Research Laboratory to relocate two SULAIR Model 3709B AC air compressors from the interior of Building 65 to a new external location in Washington, DC. The scope of work includes the construction of an approximately 10 by 21 foot metal shed on a 4000 PSI concrete slab, equipped with insulation, lighting, a space heater, and a 13,300 CFM exhaust fan. The contractor is responsible for extending 3 inch copper compressed air piping, Siemens BAS wiring, and 480V power connections, as well as installing a new 208V-120V panel board. All work must comply with UFC, NFPA, NEC, and ADA standards, and adhere to EM 385-1-1 safety regulations. A critical requirement is the submission of a construction-phasing plan to ensure at least one compressor remains operational at all times, with outages restricted to weekends. The procurement is conducted under Full and Open Competition using the Lowest Price Technically Acceptable (LPTA) source selection process. Technical quotes are rated on a pass/fail basis, with a mandatory site visit required for a passing rating. The period of performance is intended to begin upon contract award, with an initial window ending December 4, 2026. Award is based on the lowest evaluated price from responsible offerors who meet the minimum technical and past performance standards. Invoicing and payments will be processed electronically via Wide Area WorkFlow (WAWF), and the contract is subject to Davis-Bacon Act wage determination WD #DC20260002.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS