Alta Mesa Road Culvert Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Sacramento County Department of Transportation is undertaking the in-kind replacement of a collapsed culvert on Alta Mesa Road in unincorporated Sacramento County, California, as part of a publicly funded infrastructure project classified as a forecast under CEQA guidelines. The work involves removing the existing asphalt concrete, aggregate base, damaged culvert, and surrounding fill material, followed by installing a new 40-foot-long, 36-inch corrugated metal pipe culvert at a maximum depth of 10 feet, designed to restore the original hydraulic capacity without expansion. To manage water flow during construction, temporary upstream and downstream cofferdams will be installed and subsequently removed upon completion. The project remains confined to existing county right-of-way with no anticipated vegetation removal; however, if construction occurs during nesting bird season, preconstruction bird surveys will be conducted to ensure compliance with environmental protections. The project qualifies for a categorical exemption under CEQA Sections 15301 and 15302, affirming no significant environmental impact due to its limited scope and lack of expansion. No federal contract clauses, pricing data, delivery schedules, evaluation factors, or contractor selection criteria are included, as this is a state-level administrative action rather than a competitive federal procurement. The Sacramento County Department of Transportation retains full responsibility for inspection, acceptance, and oversight, with Julie Newton serving as the Environmental Coordinator and Tim Stephens as the project applicant and primary point of contact. No formal contract value is disclosed, nor are there provisions for payment offices, invoicing systems, contracting officers, or contractor certifications, reflecting its nature as a direct public works initiative under local authority with reliance on environmental compliance rather than solicitation-based award procedures.

General Info

Sacramento County replaces collapsed 40-ft culvert on Alta Mesa Road with no expansion, ensuring environmental compliance.

Agency

California → Sacramento County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

(1)

PLER2023-00108 Alta Mesa Road Culvert Replacement Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sacramento County
Office AddressN/A
Contacts
Julie NewtonEnvironmental Coordinator

Full Description

Show more
Sacramento County Department of Transportation (SacDOT) will replace in-kind an existing collapsed culvert on Alta Mesa Road. Implementation of the project will include the removal of the existing asphalt concrete aggregate base, the damaged culvert, and fill material. Once the existing materials have been removed a new 40-foot 36-inch corrugated metal pipe culvert will be installed to a max depth of 10 feet. Water may be present during construction; therefore, a temporary water diversion comprised of two cofferdams (one upstream and one downstream of the culvert) will be installed to divert water from the project area. Following construction, the water diversion will be removed. No vegetation is anticipated to be removed as part of the project; however, if construction is conducted during the nesting bird season, SacDOT will conduct preconstruction bird nesting surveys to avoid disturbing nesting birds.