Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Alta Mesa Road Culvert Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sacramento County Department of Transportation (SacDOT) is planning the in-kind replacement of a collapsed culvert on Alta Mesa Road in unincorporated Sacramento County, California. The project scope involves the removal of existing asphalt concrete aggregate base, fill material, and the damaged culvert, followed by the installation of a new 40-foot, 36-inch corrugated metal pipe culvert at a maximum depth of 10 feet. To manage water during construction, two temporary cofferdams will be installed upstream and downstream to divert water before being removed upon project completion. This project is classified as a forecast and is categorically exempt from further environmental review under CEQA Guidelines Section 15302 and Public Resources Code Section 21084, as it is a replacement of existing infrastructure within the current right-of-way without expanding capacity. While no vegetation removal is planned, SacDOT will conduct preconstruction bird nesting surveys if work occurs during nesting season. The project is managed by Environmental Coordinator Julie Newton and Applicant Tim Stephens, with performance located approximately 0.23 miles south of the Boessow Road intersection. No specific contract value, performance schedule, or formal evaluation criteria have been established at this stage.

General Info

Sacramento County replaces collapsed 40-ft culvert on Alta Mesa Road with no expansion, ensuring environmental compliance.

Agency

California → Sacramento County

Place of Performance

Sacramento, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Sacramento County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sacramento County
Office AddressN/A
Contacts
Julie NewtonEnvironmental Coordinator

Full Description

Show more
Sacramento County Department of Transportation (SacDOT) will replace in-kind an existing collapsed culvert on Alta Mesa Road. Implementation of the project will include the removal of the existing asphalt concrete aggregate base, the damaged culvert, and fill material. Once the existing materials have been removed a new 40-foot 36-inch corrugated metal pipe culvert will be installed to a max depth of 10 feet. Water may be present during construction; therefore, a temporary water diversion comprised of two cofferdams (one upstream and one downstream of the culvert) will be installed to divert water from the project area. Following construction, the water diversion will be removed. No vegetation is anticipated to be removed as part of the project; however, if construction is conducted during the nesting bird season, SacDOT will conduct preconstruction bird nesting surveys to avoid disturbing nesting birds.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 4 hours ago

DEADLINE

in about 10 hours
View Details
NAICS: 237310
New
SLED
CN-0938-23BR BRIDGE 67
Solicitation # CN-0938-23BR
The Cherokee Nation Department of Transportation and Infrastructure is soliciting bids for Project CN-0938-23BR, which involves the replacement and reconstruction of Bridge 67 over Pecan Creek in Cherokee County, Oklahoma. The scope of work includes the removal of the existing bridge and the installation of a 13x40x20/40/20 Fast Cast Bridge with associated approaches. Additional project requirements include the construction of asphalt pavement, placement of sod, installation of fencing and mailboxes, and the application of traffic stripes and signage. This is a Fixed Completion Date Contract that adheres to the 2019 ODOT Standard Specifications as amended by the Cherokee Nation. Prospective bidders must attend a mandatory pre-bid conference on October 20, 2026, at 10:00 a.m. at the CNDOT building in Tahlequah, Oklahoma, as failure to attend will result in the rejection of the bid. All inquiries must be submitted in writing via Bid Express by October 27, 2026. Sealed bids must be submitted through the Bid Express website no later than 10:00 a.m. on November 10, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with a strong emphasis on Indian preference requirements and TERO certifications. Contractors are required to provide a written Quality Control Plan one week prior to the pre-work conference and must utilize a certified independent testing firm. Mandatory submissions include a bid bond, and the successful awardee must provide performance, payment, and maintenance bonds, as well as proof of comprehensive insurance. Labor must comply with Davis-Bacon Wage Determinations, and all work must meet OSHA safety standards. The project is managed by the Cherokee Nation Director and Resident Engineer, who are responsible for inspection and final acceptance.
Cherokee Nation Department of Transportation & Infrastructure

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
Notice is hereby given that the Board of Supervisors of Lee County, Mississippi, will at the Board of Supervisors Center located at 300 West Main Street, Tupelo, Mississippi, at 11:00 oclock a.m., on the 22nd day of October 2026, accept sealed bids fro
Solicitation # 3170036803
The Board of Supervisors of Lee County, Mississippi, is soliciting sealed bids under solicitation number 3170036803 for the procurement of commodities and services related to road maintenance. The contract period runs from November 1, 2026, through September 30, 2027. The scope of work primarily focuses on asphalt overlay and leveling using a 9.5mm mix with RAP at a minimum compacted thickness of 1.5 inches, as well as both minor and major base repairs. Awarded contractors are responsible for providing all necessary materials and labor, including asphalt, tack, crushed limestone, traffic control, signage, compaction, haul costs, and Type V geotextile fabric for base repairs. Bids must be submitted separately for each item using forms approved by the Mississippi Commission of Budget and Accounting. Sealed bids are due by 11:00 a.m. on October 22, 2026, and can be delivered to the Board of Supervisors Center in Tupelo, mailed to the designated P.O. Box, or submitted electronically via Central Bidding. Bidders must comply with Section 19-13-71 of the Mississippi Code of 1972, Annotated. The Board of Supervisors reserves the right to reject any or all bids and to waive informalities. For inquiries, the point of contact is Elizabeth Johnson.
MPTAP

POSTED

about 16 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237310
New
SLED
Notice is hereby given that the Warren County Board of Supervisors will receive sealed bids from qualified bidders for the following project: 2026 Warren County Paving Project 75(355), which consists of base repairs, milling, leveling, asphalt overlay
Solicitation # 3170036795
The 2026 Warren County Paving Project 75(355) is a solicitation by the Warren County Board of Supervisors for paving and resurfacing work on approximately 25 miles of various county paved roads in Warren County, Mississippi. The scope of work includes base repairs, milling, leveling, asphalt overlay, and striping. The project is expected to exceed 50,000 dollars and has a performance period of 150 working days starting from the written Notice to Proceed. Failure to meet the stipulated completion date will result in liquidated damages of 350 dollars per working day. Qualified bidders must possess a Certificate of Responsibility from the Mississippi State Board of Public Contractors in a relevant classification, such as Highway, Street and Bridge Construction, Municipal and Public Works Construction, or Excavation, Grading and Drainage. Sealed bids or electronic submissions via Central Bidding are due by 10:00 a.m. local time on October 21, 2026. Required submission materials include a bid bond or certified check for 5% of the total bid, and non-resident bidders must provide their home state's laws regarding the treatment of non-resident contractors. The successful bidder will be required to furnish performance and payment bonds each totaling 100% of the awarded contract amount. Project management is handled by Neel-Schaffer, Inc., with Brian Robbins serving as the Project Manager.
MPTAP

POSTED

about 16 hours ago

DEADLINE

in about 8 hours
View Details
NAICS: 237310
New
SLED
Sealed bids or electronic bids will be received by the Board of Supervisors of Monroe County, Mississippi until 9:00 AM on the 23rd day of October, 2026 and shortly thereafter publicly opened for the construction of 0.189 miles of PRESTRESSED CONCRETE B
Solicitation # 3170036790
The Board of Supervisors of Monroe County, Mississippi, and the Office of State Aid Road Construction (OSARC) are soliciting sealed or electronic bids for Project No. SABP-48(01). The scope of work involves the construction of 0.189 miles of prestressed concrete bridge and approaches on Liberty Road in Monroe County. All work must be performed in accordance with the 2024 edition of the Mississippi Standard Specifications for State Aid Road and Bridge Construction, with a total contract time of 150 working days. Principal items of work include mobilization, clearing and grubbing, removal of an existing bridge at Sta. 241+54, removal of 5,209 square yards of pavement, 1,612 cubic yards of unclassified excavation, and 2,180 cubic yards of borrow excavation. Bids are due by 9:00 AM on October 23, 2026, and may be submitted physically at the Monroe County Chancery Building in Aberdeen or electronically in PDF format. To be considered valid, each proposal must be accompanied by a certified check or bid bond for five percent of the total bid made payable to Monroe County and the State of Mississippi. The contract will be awarded to the lowest qualified bidder based on published quantities, provided the bidder is on the official list of Planholders. Bids that include qualifying letters regarding the conditions of the proposal will be deemed irregular and disqualified. Coordination for the project is managed by County Engineer Kyle Strong and Melissa Plunkett.
MPTAP

POSTED

about 16 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS