Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Alta Vista Alley Storm Drain Improvements Project

Closed
20260807017State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Alta Vista Alley Storm Drain Improvements Project is a public works initiative by the Town of Woodside, California, aimed at enhancing stormwater management through regrading the existing base rock surface, resurfacing two short alley segments with asphalt, and installing a comprehensive drainage system including 333 feet of 12-inch HDPE pipe, 33 feet of 4-inch HDPE pipe, two catch basins, one junction box, and 30 linear feet of ACO S200K trench drains. The scope further encompasses demolition of existing structures, removal and disposal of concrete and old infrastructure, excavation, backfilling, compaction, and off-hauling of spoils, with all work required to comply with ASTM, ANSI, and applicable local, state, and federal codes. The project is located at Alta Vista Alley Way, Woodside, CA 94062, and is subject to strict performance standards including ADA compliance, prevailing wage requirements under California’s Public Works Labor Code, and adherence to worker safety protocols. The contractor must obtain all necessary permits, coordinate with jurisdictional agencies, and ensure material and workmanship quality through inspection and testing protocols conducted by the Owner or third parties at the site or point of supply. Bids are evaluated on responsiveness, responsibility, and compliance, with award likely based on the lowest technically acceptable bid price, though no formal LPTA designation is stated. The contract specifies a two-envelope submission process, requires bonding and insurance filings, and mandates the identification and qualification of key personnel, including a project manager and superintendent, whose absence could trigger liquidated damages. All work must be completed within an undefined period to be set by a Notice to Proceed, with substantial and final completion milestones to be determined, and all changes to scope must be formally executed via change orders or construction change directives. The contractor is also responsible for maintaining a site office staffed by a resident project representative, ensuring English language proficiency for unescorted personnel, and providing detailed documentation on litigation history, licensing, and compliance with non-discrimination and immigration laws. No contract value is disclosed as pricing fields remain blank in the bid schedule, suggesting the document is an incomplete solicitation form awaiting bidder responses.

General Info

Storm drain upgrades in Woodside, CA, with new HDPE pipes, trench drains, asphalt paving, and tree protection.

Place of Performance

Woodside, CA, 94062, USA

Set-Aside

NONE

Documents

2

Alta Vista Alley Storm Drain Improvements Bid Set Plans 8-5-26

PDF, High priority: read this firstspecifications
High

Alta Vista Alley Storm Drain Improvements Project Specifications 8-5-26

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → TOWN OF WOODSIDE
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → TOWN OF WOODSIDE
Office AddressN/A

Full Description

Show more
Project includes regrading the base rock surface, resurfacing two short segments of the alley with asphalt, and installing trench drains, catch basins, 333’ of 12” storm drain pipe, 33’ of 4” pipe, and other miscellaneous work. The work comprises the construction of the Alta Vista Alley Storm Drain Improvements Project, including demolition of existing structures, tree protection, removal and disposal of concrete, catch basins, trench drains, and pipes. It involves installing 12” and 4” HDPE pipes by open trench method, connecting them to catch basins and junction boxes, including excavation, backfilling, compacting, and off-haul spoils. The project also requires the installation of ACO S200K Trench Drains, AC Paving, and Class II Paving, complete with aggregate base, formwork, and wood header board. All necessary permits and coordination with jurisdictional agencies are the contractor's responsibility.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS