This Solicitation opportunity from California was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Alta Vista Alley Storm Drain Improvements Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Alta Vista Alley Storm Drain Improvements Project is a public works initiative by the Town of Woodside, California, aimed at enhancing stormwater management through regrading the existing base rock surface, resurfacing two short alley segments with asphalt, and installing a comprehensive drainage system including 333 feet of 12-inch HDPE pipe, 33 feet of 4-inch HDPE pipe, two catch basins, one junction box, and 30 linear feet of ACO S200K trench drains. The scope further encompasses demolition of existing structures, removal and disposal of concrete and old infrastructure, excavation, backfilling, compaction, and off-hauling of spoils, with all work required to comply with ASTM, ANSI, and applicable local, state, and federal codes. The project is located at Alta Vista Alley Way, Woodside, CA 94062, and is subject to strict performance standards including ADA compliance, prevailing wage requirements under California’s Public Works Labor Code, and adherence to worker safety protocols. The contractor must obtain all necessary permits, coordinate with jurisdictional agencies, and ensure material and workmanship quality through inspection and testing protocols conducted by the Owner or third parties at the site or point of supply. Bids are evaluated on responsiveness, responsibility, and compliance, with award likely based on the lowest technically acceptable bid price, though no formal LPTA designation is stated. The contract specifies a two-envelope submission process, requires bonding and insurance filings, and mandates the identification and qualification of key personnel, including a project manager and superintendent, whose absence could trigger liquidated damages. All work must be completed within an undefined period to be set by a Notice to Proceed, with substantial and final completion milestones to be determined, and all changes to scope must be formally executed via change orders or construction change directives. The contractor is also responsible for maintaining a site office staffed by a resident project representative, ensuring English language proficiency for unescorted personnel, and providing detailed documentation on litigation history, licensing, and compliance with non-discrimination and immigration laws. No contract value is disclosed as pricing fields remain blank in the bid schedule, suggesting the document is an incomplete solicitation form awaiting bidder responses.
General Info
Place of Performance
Woodside, CA, 94062, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
