Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Altadena Main Library Renovation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Altadena Main Library Renovation Project, led by the Los Angeles County Department of Regional Planning, involves a comprehensive upgrade of the facility located at 600 E Mariposa St, Altadena, California. The scope of work includes expanding the building footprint by approximately 700 square feet, performing a seismic retrofit, and reconfiguring interior spaces. Key infrastructure improvements focus on replacing aged mechanical, electrical, and plumbing systems, including the elevator and HVAC systems, and adding accessible restrooms. The project also incorporates modernized audio-visual spaces, updated communications infrastructure, and structured cabling. Exterior enhancements include a new entry lobby, community room deck, outdoor reading court, delivery loading zone, and updated signage, along with parking lot resurfacing and landscaping upgrades. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Environmental Impact Report addressing air quality, noise, and cultural resources. Construction is scheduled to occur in phases from May 2025 through March 2026, beginning with demolition and grading, followed by interior and exterior construction and final architectural coating. Performance goals emphasize universal design to exceed ADA requirements and the preservation of the building's mid-century modern design. Strict compliance is required for the handling of asbestos-containing materials and lead-based paint, and all work must adhere to the California Building Code and Standard Specifications for Public Works Construction.

General Info

Altadena Library renovation includes expansion, seismic retrofit, infrastructure replacement, ADA compliance, and construction from May 2025 to March 2026 at 600 E. Mariposa Street.

Agency

California → Los Angeles County Regional Planning

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

East Mariposa Street, Santa Rosa Avenue, CA, 91001

Set-Aside

NONE

Documents

(5)

SCH Summary Form for Altadena Main Library Renovation Project

PDFenvironmental-summary

Altadena Main Library Renovation Project NOP and Initial Study

PDFnop

Altadena Main Library Renovation Project Notice of Completion

PDFnotice-of-completion

Altadena Main Library Renovation Draft Environmental Impact Report

PDFenvironmental-impact-report

Altadena Main Library Renovation Project Draft EIR Notice of Availability

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Regional Planning
Contacts3 people available
OfficeN/A
Organization / Agency
California → Los Angeles County Regional Planning
Office AddressN/A
Contacts
Jolee HuiPrincipal Planner
Thomas StrandEnvironmental Planning Manager
Jennifer PearsonProject Executive

Interested Companies (1)

Show more
Chambers Group
Costa Mesa, CA

Full Description

Show more
The planned improvements at the Altadena Main Library include an expansion of the building footprint by approximately 700 square feet, interior space reconfigurations, access improvements, seismic retrofit, and replacement of aged building infrastructure to address mechanical (elevator and heating, ventilation, and air conditioning [HVAC]), plumbing (including additional and accessible restrooms), and electrical and structural elements of the facility. Infrastructure improvements are expected to include some modernized Audio Visual (AV) spaces with newer technology, updated communications infrastructure, and structured cabling. Upgrades to plantings and irrigation and adding outdoor functional spaces are also planned.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Both structures will feature shallow foundations, structural steel framing, standing-seam roofs, and a combination of masonry and metal panel exterior walls. The scope of work is extensive, covering everything from demolition of an existing engineering facility to comprehensive site improvements, including stormwater retention, utilities, landscaping, and parking. Bids are requested across numerous trades, including concrete, masonry, electrical, mechanical, plumbing, and structural steel. The project adheres to Davis Bacon Wage Rates and is exempt from sales tax. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and project documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project involves a comprehensive scope of work over 1828 calendar days, including the construction of six Containerized Long Weapons Storage units and three earth-covered high-explosive magazines equipped with overhead cranes. Additional structures include a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. The project also requires the demolition of 18 existing magazines and two specific buildings, along with extensive site preparation involving rock excavation, grading, and wetland mitigation. Technical requirements include specialized foundation features such as rigid inclusions and load transfer mats, as well as the installation of grounding, lightning protection, and intrusion detection systems. The scope covers a wide array of trades, including structural steel, electrical utilities, plumbing, mechanical systems, and paving for access roads and loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and documentation.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS