This Solicitation opportunity from Tennessee was posted on October 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Alton Park Riverwalk Connector
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Alton Park Riverwalk Connector project in Chattanooga, Tennessee, involves constructing approximately 500 linear feet of a 12-foot-wide concrete multi-modal path, along with about 1,160 feet of 5-foot-wide sidewalk, on West 33rd Street extending from a nearby existing pathway to Delong Street. The scope encompasses a broad range of construction activities, including concrete pathway installation, ornamental roadway work, landscaping, stormwater infrastructure modifications, LED pedestrian lighting installation, electrical conduit and wiring setup, meter installation, ADA-compliant crossing ramps, and pavement markings. The project also involves addressing environmental considerations, such as contaminated soils identified through geotechnical reports, and ensuring proper utility and drainage work, with detailed clarifications provided in multiple addenda to assist bidders and contractors in understanding scope specifics, technical requirements, and project timelines. The contract, managed by the City of Chattanooga under the Tennessee Department of Economic and Community Development, is valued between $500,000 and $1.5 million, with a solicitation posted on October 10, 2025, and a bid response deadline set for October 23, 2025. The project emphasizes compliance with environmental safety standards, utility coordination, and ADA accessibility, with updates and clarifications issued through several addenda to refine scope details, address questions, and adjust bidding procedures. The primary point of contact for the project is Debbie J. Talley, and the project aims to enhance multimodal transportation infrastructure, improve pedestrian safety, and integrate landscaping and lighting features to support community connectivity and urban development goals.
General Info
Place of Performance
TN, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
This project will consist of approximately 500 linear feet of a concrete multi-modal path 12 feet wide with a varying foot grass strip and approximately 1160 feet of 5-foot-wide sidewalk. The project is located on West 33rd Street running from the existing pathway near St. Elmo Avenue to Delong Street. The project will include but is not limited to concrete pathway installation, ornamental concrete roadway, landscaping, storm water structure installation and modification, L.E.D. pedestrian lighting installation, electrical conduit installation, wiring, meter installation, installation of ADA compliant crossing ramps, and pavement markings.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
