Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Commerce was posted on September 24, 2014. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Aluminum Welding Repairs to the PIFSC 19 Safe Boat - Steel Toe

Awarded
WE-133F-14-RQ-1180Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration on a 30 foot Munson Packman landing craft. The project involves a six-phase process including the decommissioning and removal of two existing Honda BF250A outboard engines, a structural assessment of the transom, and the installation of two new Honda BF250D Drive-by-Wire outboards. Key technical requirements include the installation of Honda iST electronic control heads at primary and secondary helm stations, integration with the existing NMEA 2000 backbone and SeaStar PA1315-2 Power Assist Steering system, and a full fuel system upgrade using USCG Type A1-15 lines. The project concludes with static diagnostics and a minimum two hour sea trial to validate performance and safety protocols. The selected contractor must be a Honda Marine Authorized Dealer or Service Center and provide a secure facility for vessel storage. Proposals are due by November 13, 2026, and will be evaluated based on a 100 point scale with significant preference given to Colville and other Indian Business Enterprises. Award criteria prioritize reliability and effectiveness over the lowest cost. Contractual requirements include a performance bond for awards exceeding 100,000 dollars or a 25 percent retainage, comprehensive liability and workers compensation insurance, and consent to the jurisdiction of the Colville Tribal Court. Payments are subject to the tribal appropriation process and the availability of funds in the tribal treasury.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in 9 days
NAICS: 336611
New
Federal
Maintenance, Repair, and Preservation of Edgecumbe Barge
Solicitation # N4523A26Q1006
The Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a stand-alone Firm-Fixed-Price contract for the maintenance, repair, and preservation of one Edgecumbe RCD Barge. The scope of work includes docking and undocking the vessel, performing hull and structural repairs, replacing zinc anodes, and conducting tank and void cleaning and air tests to support ABS and USCG inspections. The contractor is responsible for transporting the vessel from the government facility in Bremerton, Washington, to their own facility and returning it upon completion. To ensure proper oversight, the contractor's facility must be located within the Puget Sound region, defined as the West Coast of the continental US from Olympia to Bellingham, Washington. The period of performance is scheduled from 15 December 2026 to 19 February 2027, with a quote submission deadline of 13 November 2026. Technical requirements mandate that all welders be certified by the American Weld Society and American Bureau of Shipping, and the contractor must maintain a documented Heavy Weather Plan. Quality standards require adherence to commercial marine practices, including specific surface preparation and coating standards such as SSPC-SP-1. Offerors must be registered in the System for Award Management and provide a detailed cost proposal that includes a five-way breakdown of waste management and disposal costs.
Puget Sound Naval Shipyard IMF

POSTED

about 13 hours ago

DEADLINE

in 9 days
NAICS: 336611
New
Federal
TSV4 NARR MESSING AND MODERNIZATION
Solicitation # N0018927QL008
Solicitation N0018927QL008 is a firm-fixed-price effort issued by NAVSUP FLT LOG CTR Norfolk for the development of a drawing package and Bill of Materials (BOM) to support habitability upgrades aboard the TSV4 Narragansett. The scope of work focuses on the assessment and documentation of messing, berthing, stateroom, and sanitary spaces at Joint Expeditionary Base Little Creek-Fort Story, Virginia. This is a professional services contract limited to engineering and planning; it specifically excludes the procurement, fabrication, or installation of any shipboard components. The project is 100 percent set aside for Small Business and Service-Disabled Veteran-Owned Small Businesses under NAICS code 336611. Key deliverables include an electronic draft drawing package and BOM due 40 calendar days after award, with final electronic files and two full-size paper copies due within 61 calendar days. The contractor must adhere to several technical standards, including MIL-STD-2003 for electrical installations, MIL-STD-777 for piping components, and NAVSEA General Specifications for Overhaul of Surface Ships. Award is based on best value, requiring a pass on a mandatory ship check at Colonna's Shipyard in Norfolk, VA, and an acceptable technical approach. Failure to attend the mandatory site visit results in disqualification. Payment will be processed electronically via the Wide Area WorkFlow system.
Navsup Flt Logistics Ctr Norfolk

POSTED

about 13 hours ago

DEADLINE

in 8 days
NAICS: 336611
New
Federal
Multi Mission Surface Combatant (MMSC) Post Delivery Execution Yard (PDEY)
Solicitation # N6117727R0003
Solicitation N61177-27-R-0003 is for the Multi Mission Surface Combatant (MMSC) Post Delivery Execution Yard (PDEY) contract, managed by Navsea HQ. The objective is to execute post-delivery availabilities for four MMSC ships, with each vessel undergoing a 14-month post-delivery period. The scope of work includes the management and execution of three primary availabilities per ship: the Post Shakedown Availability (PSA), the Industrial Post Delivery Availability (IPDA), and the Continuous Maintenance Availability (CMAV), as well as any concurrent Planned Maintenance Availabilities (PMAVs). Key contractor responsibilities include providing a NAVSEA-certified drydock for PSAs, performing emergent work, and conducting Post Repair Trials (PRT) to ensure system operability. The contract is structured using Cost Plus Award Fee (CPAF) task orders, with a total performance period not to exceed five years. Work for PSAs and IPDAs will be performed at the contractor's facilities, while CMAVs will be executed at Naval Station Mayport. Award evaluation is based on non-cost factors including management capability, facility and production capabilities, and the proposed approach for PSA, IPDA, and CMAV execution. Performance will be measured against weighted objectives for schedule (35%), management (30%), technical (20%), and cost (30%) performance. The solicitation requires strict adherence to quality standards such as ISO 9001:2015 and specific military marking and packaging standards including MIL-STD-130 and MIL-STD-129.
Navsea Hq

POSTED

about 13 hours ago

DEADLINE

in 2 months
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

about 13 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Solicitation WE-133F-14-RQ-1180 is a total small business set-aside under NAICS code 336611 for aluminum welding repairs to the PIFSC 19 foot Safe Boat Steel Toe, operated by the NOAA Pacific Islands Fisheries Science Center. The scope of work involves addressing pitting and corrosion in the fuel tank and lower aft void, which requires cutting the transom deck for access, performing necessary welding repairs, and installing a new access hatch. All work must be completed by February 1, 2015, with delivery and acceptance occurring at the NOAA/NMFS/PIFSC facility in Honolulu, Hawaii. The government will award the contract based on best value, evaluating offerors on their technical approach and capabilities, past performance, and price, with the first two factors carrying substantially more weight than cost. The contract includes specific requirements for ship repair, including a percentage-of-completion payment structure and provisions for Additional Item Requirements for emergent growth work. Contractors must adhere to strict maritime standards, including U.S. Coast Guard and American Bureau of Shipping regulations, and are required to provide detailed production schedules and manning curves upon the vessel's arrival at their facility.

General Info

Contract Value

$16,600

NAICS

336611 - Ship Building and Repairing

Place of Performance

WA

Set-Aside

NONE

Award Issued Date

Documents

3
PDF, High priority: read this firstamendment
High
DOCX, High priority: read this first3 pages · sow
High
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Noaa
Contacts1 person available
OfficeSEATTLE, WA, 98115, USA
Organization / AgencyDepartment Of Commerce Noaa
Office AddressSEATTLE, WA, 98115, USA
Contacts

Full Description

Show more
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number for this procurement is WE-133F-14-RQ-1180 and is hereby issued as a request for quotation (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-76 dated July 25, 2014. (iv) This procurement is 100% set-aside for small business concerns. The associated NAICS code is 336611 with a corresponding small business size standard of 1,000 employees. (v) Contract Line Item Numbers See Attached Standard Form 18 included as a separate attachment on FBO. (vi) Description of Requirements See the Statement of Work which is included as a separate attachment on FBO. (vii) Date(s) and Place(s) of Delivery and Acceptance/FOB Point. Place of Delivery: NOAA/NMFS/PIFSC 1845 Wasp Boulevard, Building 176 Honolulu, HI 96818 All deliveries shall be FOB Destination. All Federal Acquisition Regulation (FAR) clauses listed below are available for download at https://acquisition.gov/far/. (viii) 52.212-1, Instructions to Offerors-Commercial Items (APR 2014) applies to this acquisition. (ix) 52.212-2, Evaluation-Commercial Items (JAN 1999) applies to this acquisition as follows: (a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Factor A - APPROACH AND CAPABILITIES - Corporate and individual qualifications for the work; adequacy of equipment, materials, and facilities proposed; experience with the types of operations identified in the Solicitation. Factor B - PAST PERFORMANCE - Performance by the offerer and its subcontractor(s) as it relates to all solicitation requirements, including the quality of services and products, timeliness of performance, and customer satisfaction; and indication of ability to improve performance through proactive management. Evaluation of this factor will be based on the information contained in the proposal and information provided by references and/or other sources. The Project may evaluate past performance by contacting references and/or other sources. Factor C - PRICE - Although price is the least important evaluation factor, it will not be ignored. The degree of importance of the proposed price will increase with the degree of equality of the proposals in relation to the other factors on which selection is to be based. Factors A and B are considered to be substantially more important than price in this evaluation process. (b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). (c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. The government reserves the right to make an award to other than the lowest priced offer or if the contracting officer determines that to do so would result in the best value to the government. Note that any and all costs associated with proposal preparation, are the responsibility of the quoter and will not be reimbursed by the government. (x) The quoter must submit a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications - Commercial Items (MAY 2014), with its quote. (xi) The clause at FAR 52.212-4, Contract Terms and Conditions - Commercial Items (MAY 2014), applies to this acquisition. (xii) The clause at FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items (JUL 2014) applies to this acquisition. The following clauses under subparagraph (b) apply: (10), (14), (25), (28), (30), (31), (33), (42), (46) and (52). The following clauses under subparagraph (c) apply: (1), (2) (xiii) The following additional clauses are also applicable to this acquisition: Department of Commerce Clauses: 1352.201-70 CONTRACTING OFFICER'S AUTHORITY The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price. 1352.209-73 COMPLIANCE WITH THE LAWS (APR 2010) The contractor shall comply with all applicable laws, rules and regulations which deal with or relate to performance in accord with the terms of the contract. 1352.209-74 ORGANIZATIONAL CONFLICT OF INTEREST (APR 2010) (a) Purpose. The purpose of this clause is to ensure that the contractor and its subcontractors: (1) Are not biased because of their financial, contractual, organizational, or other interests which relate to the work under this contract, and (2) Do not obtain any unfair competitive advantage over other parties by virtue of their performance of this contract. (b) Scope. The restrictions described herein shall apply to performance or participation by the contractor, its parents, affiliates, divisions and subsidiaries, and successors in interest (hereinafter collectively referred to as "contractor") in the activities covered by this clause as a prime contractor, subcontractor, co-sponsor, joint venturer, consultant, or in any similar capacity. For the purpose of this clause, affiliation occurs when a business concern is controlled by or has the power to control another or when a third party has the power to control both. (c) Warrant and Disclosure. The warrant and disclosure requirements of this paragraph apply with full force to both the contractor and all subcontractors. The contractor warrants that, to the best of the contractor's knowledge and belief, there are no relevant facts or circumstances which would give rise to an organizational conflict of interest, as defined in FAR Subpart 9.5, and that the contractor has disclosed all relevant information regarding any actual or potential conflict. The contractor agrees it shall make an immediate and full disclosure, in writing, to the Contracting Officer of any potential or actual organizational conflict of interest or the existence of any facts that may cause a reasonably prudent person to question the contractor's impartiality because of the appearance or existence of bias or an unfair competitive advantage. Such disclosure shall include a description of the actions the contractor has taken or proposes to take in order to avoid, neutralize, or mitigate any resulting conflict of interest. (d) Remedies. The Contracting Officer may terminate this contract for convenience, in whole or in part, if the Contracting Officer deems such termination necessary to avoid, neutralize or mitigate an actual or apparent organizational conflict of interest. If the contractor fails to disclose facts pertaining to the existence of a potential or actual organizational conflict of interest or misrepresents relevant information to the Contracting Officer, the Government may terminate the contract for default, suspend or debar the contractor from Government contracting, or pursue such other remedies as may be permitted by law or this contract. (e) Subcontracts. The contractor shall include a clause substantially similar to this clause, including paragraphs (f) and (g), in any subcontract or consultant agreement at any tier expected to exceed the simplified acquisition threshold. The terms "contract," "contractor," and "Contracting Officer" shall be appropriately modified to preserve the Government's rights. (f) Prime Contractor Responsibilities. The contractor shall obtain from its subcontractors or consultants the disclosure required in FAR Part 9.507-1, and shall determine in writing whether the interests disclosed present an actual, or significant potential for, an organizational conflict of interest. The contractor shall identify and avoid, neutralize, or mitigate any subcontractor organizational conflict prior to award of the contract to the satisfaction of the Contracting Officer. If the subcontractor's organizational conflict cannot be avoided, neutralized, or mitigated, the contractor must obtain the written approval of the Contracting Officer prior to entering into the subcontract. If the contractor becomes aware of a subcontractor's potential or actual organizational conflict of interest after contract award, the contractor agrees that the Contractor may be required to eliminate the subcontractor from its team, at the contractor's own risk. (g) Waiver. The parties recognize that this clause has potential effects which will survive the performance of this contract and that it is impossible to foresee each circumstance to which it might be applied in the future. Accordingly, the contractor may at any time seek a waiver from the Head of the Contracting Activity by submitting such waiver. 1352.271-70 INSPECTION AND MANNER OF DOING WORK (APR 2010) (a) All work and material shall be subject to the approval of the Contracting Officer or duly authorized representative. Work shall be performed in accordance with the plans and specifications of this contract as modified by any contract modification. (b) Unless otherwise specifically provided for in the contract, all operational practices of the contractor and all workmanship and material, equipment and articles used in the performance of work shall be in accordance with American Bureau of Shipping "Rules for Building and Classing Steel Vessels", U.S. Coast Guard Marine Engineering Regulations and Material Specifications (46 CFR Subchapter F), U.S. Coast Guard Electrical Engineering Regulations (46 CFR Subchapter J), and U.S. Public Health Service "Handbook on Sanitation of Vessel Construction", in effect at the time of the contract award; and the best commercial maritime practices, except where military specifications are specified, in which case such standards of material and workmanship shall be followed. (c) All material and workmanship shall be subject to inspection and test at all times during the contractor's performance of the work to determine their quality and suitability for the purpose intended and compliance with the contract. In case any material or workmanship furnished by the contractor is found to be defective prior to redelivery of the vessel, or not in accordance with the requirements of the contract, the Government shall have the right prior to redelivery of the vessel to reject such material or workmanship, and to require its correction or replacement by the contractor at the contractor's cost and expense. This Government right is in addition to its rights under any Guarantee clause in this contract. If the contractor fails to proceed promptly with the replacement or correction of such material or workmanship, as required by the Contracting Officer, the Government may, by contract or otherwise, replace or correct such material or workmanship and charge to the contractor the excess cost to the Government. The contractor shall provide and maintain an inspection system acceptable to the Government covering the work specified in the contract. Records of all inspection work by the contractor shall be kept complete and available to the Government during the performance of the contract and for a period of two (2) years after delivery of the vessel to the Government. (d) No welding, including tack welding and brazing, shall be permitted in connection with repairs, completions, alterations, or addition to hulls, machinery or components of vessels unless the welder is, at the time, qualified to the standards established by the U.S. Coast Guard, the American Bureau of Shipping, or the Department of the Navy. The welder's qualifications shall be appropriate for the particular service application, filler material type, position of welding, and welding process involved in the work being undertaken. A welder may be required to re-qualify if the Contracting Officer believes there is a reasonable doubt concerning the welder's ability. Welders' qualifications for this purpose shall be governed by the U.S. Coast Guard Marine Engineering Regulations and Material Specifications (46 CFR Subchapter F). When a welding process other than manual shielded arc is proposed or required, the contractor or fabricator shall submit procedure qualification tests for approval prior to production welding. Procedure qualification tests shall be conducted in accordance with the United States Coast Guard Marine Engineering Regulations and Material Specifications (46 CFR Subchapter F). (e) The contractor shall exercise reasonable care to protect the vessel from fire, and the contractor shall maintain a reasonable system of inspection over the activities of welders, burners, riveters, painters, plumbers and similar workers, particularly where such activities are undertaken in the vicinity of the vessel's fuel oil tanks, magazines or storerooms containing flammable material. A reasonable number of hose lines shall be maintained by the contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the contractor's pier or in dry dock or on a marine railway. All tanks or bilge areas under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe by the contractor if and to the extent necessary as required by good marine practice or by current Occupational Safety and Health Administration regulations. The Contracting Officer's Representative (COR) shall be furnished with a "gas free" or "safe for hot work" or "safe for workers" certificate before any hot work or entry is done. Unless otherwise provided in this contract, the contractor shall at all times maintain a reasonable fire watch about the vessel, including a fire watch on the vessel while work is being performed thereon. (f) The contractor shall place proper safeguards and/or effect such safety precautions as necessary, including suitable and sufficient lighting, for the prevention of accidents or injury to persons or property during the prosecution of work under this contract and/or from time of receipt of the vessel until acceptance by the Government of the work performed. (g) Except as otherwise provided in this contract, when the vessel is in the custody of the contractor or in dry dock or on a marine railway and the temperature becomes as low as 35 degrees Fahrenheit, the contractor shall keep all pipelines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected from frost damage by applied heat through the use of a salamander or other proper means, as approved by the COR. (h) Whenever practicable, the work shall be performed in a manner which does not interfere with the berthing and messing of personnel attached to the vessel. The contractor shall ensure that assigned personnel have access to the vessel at all times. It is understood that such personnel will not interfere with the work or the contractor's workers. (i) The Government does not guarantee the correctness of the dimensions, sizes, and shapes shown in any sketches, drawings, plans or specifications prepared or furnished by the Government. Prior to submitting an offer, it is the responsibility of the bidder/offeror to verify the dimensions, sizes, and shapes in materials provided by the Government. Where practical, the Government will make the vessel available for inspection prior to bid opening or the date for receipt of proposals. If the contractor, as a result of inspection or otherwise, discovers any error in the sketches, drawings, plans or specifications, it shall immediately inform the Contracting Officer of the error and proceed in accord with instructions received from the Contracting Officer. The Government is not liable for any claims or charges resulting from additional work performed by the contractor as a result of a patent ambiguity in the sketches, drawings, plans or specifications that was not brought to the attention of the Contracting Officer. The contractor shall be responsible for the correctness of the shape, sizes and dimensions of parts furnished by the contractor under the contract. (j) The contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by contractor employees or the work, and at the completion of the work shall remove all rubbish from and about the site of the work and shall leave the work and its immediate vicinity "broom-clean" unless more exactly specified in this contract. (k) While in drydock or on a marine railway, the contractor shall be responsible for the closing, before the end of working hours, of all valves and openings upon which work is being done by its workers when such closing is practicable. The contractor shall establish a list and keep the COR cognizant of the closure status of all valves and openings upon which the contractor's workers have been working. (l) Without additional expense to the Government, the contractor shall employ specialty subcontractors where required by the specifications or when necessary for satisfactory performance of the work. (m)(1) Unless otherwise stated in the contract, the contractor shall notify the COR at least 72 hours in advance: (i) Prior to starting inspections or tests; and (ii) When supplies will be ready for Government inspection. (2) Such notification shall be provided either verbally or in writing at the discretion of the COR. (End of clause) 1352.271-71 METHOD OF PAYMENT AND INVOICING INSTRUCTIONS FOR SHIP REPAIR (APR 2010) (a) The Government will make payment under this contract based on a percentage of completion. The contractor may invoice for the percentage completed for each work item as work progresses. The amount invoiced shall be calculated based on prices stated in the Schedule, as follows: A work item may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that work item have no limitation as to the percentage of completion required before invoicing, but in no event may invoices be submitted more frequently than every 2 weeks, or for amounts less than $10,000, unless it is the final payment. The minimum percentage of completion (25%) to be reached prior to billing each work item may be waived by the Contracting Officer for large dollar work items on a case-by-case basis. (b) Invoices submitted by the contractor which are deemed not proper, in accordance with FAR 52.232-25, will be returned. Invoices shall include: (1) Name and Address of the contractor; (2) DUNS Number; (3) Invoice Date; (4) Contract Number/Modification Number; (5) CLIN/Work Item Number, to include: Description, Quantity, Unit of Measure, Unit Price and Extended Price; (6) Shipping and Payment Terms; and, (7) Contractor Point of Contact, including: Name, Title, Phone Number, and Mailing Address; (8) The percentage of completion for each CLIN/work item identified; (9) Name of the Contracting Officer ; (10) Ship name; (11) The overall percentage and dollar amount previously billed, currently billed and unbilled. (c) When invoicing for changed work, the contractor shall identify it as a contract change and shall identify the modification authorizing the change, and the CLIN/Work Item associated with the change. (d) All items of work invoiced under this contract will be verified and confirmed by the Contracting Officer's Representative as accurate and complete and approved by the designated billing office before payment will be made. (e) Mail the original invoice to: [insert] (f) The contractor's final invoice submitted under the contract must be marked as follows: "THIS INVOICE CONSTITUTES THE FINAL INVOICE-UPON PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE UNDER CONTRACT NUMBER ________." (To be assigned at contract award) (End of clause) 1352.271-72 ADDITIONAL ITEM REQUIREMENTS (AIR)-GROWTH WORK (APR 2010) (a) This clause applies to Additional Item Requirements (AIR), also known as growth and emergent work ordered by the Contracting Officer pursuant to the Changes-Ship Repair clause or mutually agreed upon by the parties. The contractor shall perform AIR at the labor billing rates designated in the Schedule, as described in paragraph (c) of this clause. The AIR handling fee designated in the Schedule shall be the sole fee used for direct material purchases and subcontractor handling. The estimated quantity of labor hours and handling fees represent the Government's best estimate for growth that may be required throughout the contract performance period. All growth work shall be paid at the prices stated in the Schedule. (b) The contractor shall take into account the potential for ordering all estimated AIR quantities in developing the Production Schedule. The ordering of any portion of the AIR quantities does not in itself warrant an extension to the original contract completion date; however, for planning purposes, the Government anticipates ordering AIR in accordance with the following schedule: (1) No more than 75% of the hours during the first half of the contract period of performance. (2) No more than 50% of the hours during the third quarter of the contract period of performance. (3) No more than 30% of the hours during the fourth quarter of the contract period of performance. (c) The AIR labor rate shall be a flat, hourly rate to cover the entire effort and shall be burdened to include: (1) Direct production labor hour functions only. Direct production labor hours are hours of skilled labor at the journeyman level expended in direct production. Direct production is defined as work performed by a qualified craftsman that is directly related to the alteration, modification, or repair of the item or system identified as needing alteration, modification, or repair. The following functions are identified as direct production: Abrasive Cleaning/Water Blasting, Tank Cleaning, Welding, Burning, Brazing, Blacksmithing, Machining (inside and outside), Carpentry, Electrical/Electronic Work, Crane Operation, Shipfitting, Lagging/Insulating, Painting, Boilermaking, Pipe Fitting, Engineering (Production), Sheetmetal Work, Staging/Scaffolding, and Rigging. (2) Non-production labor hours (whether charged directly or indirectly by contractor's accounting system) shall be for labor in support of production functions. For purposes of this clause, support functions are defined as functions that do not directly contribute to the alteration, modification, or repair of the item or system identified as needing alteration, modification, or repair. Necessary support functions should be priced into the burdened rate for production labor hours. Examples of support functions include: Testing, Quality Assurance (inspection), Engineering (support), Planning (including involvement of craft foreman/journeyman in planning a task), Estimating (including determination of necessary materials and equipment needed to perform a task), Material Handling, Set-up (moving tools and equipment from shop to ship to perform a task), Fire Watch, General Labor (including general support of journeyman tasks), Cleaning (including debris pickup and removal), Surveying, Security, Transportation, Supervision, and Lofting (sail/pattern making). (d) Additional Item Requirements do not include replacement work performed pursuant to the Inspection and Manner of Doing Work or Guarantees clauses. (e) It is the Government's intention to award any growth work identified during the repair to the contractor, if a fair and reasonable price can be negotiated for such work, based upon Schedule rates. If a fair and reasonable price cannot be negotiated, the Government may, at its discretion, obtain services outside of the contract. Such services may be performed while the ship is undergoing repair in the contractor's facility pursuant to the Access to Vessels clause. (f) The contractor shall submit to the Contracting Officer the following information in all AIR proposals: (1) Number of labor hours estimated; broken down by specific direct production labor category. (2) Material estimates, individually broken out and priced. When requested by the Contracting Officer, material quotes shall be provided. (3) Subcontractor estimates, individually broken out and priced along with the actual subcontractor quotes. The requirement to submit subcontractor quotes may be waived if deemed appropriate by the Contracting Officer. (4) Material/subcontractor handling fee and the basis for the fee. (g) The contractor shall not be entitled to payment for any hours ordered pursuant to this clause until such time as a written contract modification is executed. (End of clause) 1352.271-73 SCHEDULE OF WORK (APR 2010) (a) Notwithstanding other requirements specified in this contract, the contractor shall provide to the Contracting Officer and COR the following documents within five (5) working days of the vessel's arrival at the contractor's facility: (1) Production Schedule. (2) Work Package Network. (3) Total Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule shall list the earliest, latest, and scheduled start and completion date for each work item awarded and shall identify the critical path. The Work Package Network shall show the work items, milestones, key events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve shall show the required manning for the duration of the contract. The Trade Manning Curves shall show the required manning for each trade for the duration of the contract. The Subcontracting List shall show work items, milestones, key events, and activities to be accomplished by subcontractors. (c) Additional Item Requirements ordered and agreed upon, whether or not yet formalized via a change order (contract modification), shall be added to the Production Schedule, Trade Manning Curves, and Subcontracting List and submitted to the Contracting Officer and COR at each weekly Progress Meeting. Any anticipated or unanticipated deviation (greater than five (5) calendar days) from the Production Schedule shall be immediately brought to the attention of the Contracting Officer and COR. (d) Any unauthorized deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the established performance period completion date may entitle the Government to remedies for late performance, including, but not limited to, liquidated damages. (End of clause) 1352.271-76 PERFORMANCE (APR 2010) (a) The contractor shall not commence work until a notice to proceed has been issued by the Contracting Officer. (b) The Government shall deliver the vessel described in the contract at such time and location as may be specified in the contract. Upon completion of the work, the Government shall accept delivery of the vessel at such time and location as may be specified in the contract. (c) Without additional charge to the Government, and without specific requirement in the contract, the contractor shall: (1) Make available, at the facility, to personnel of the vessel while in drydock or on a marine railway, sanitary facilities adequate for the number of personnel using them and acceptable to the Contracting Officer; (2) Supply and maintain, in such condition as the Contracting Officer may reasonably require, suitable brows and gangways from the pier, drydock or marine railway to the vessel; (3) Perform, or pay the cost of, any repair, reconditioning or replacement made necessary as the result of the use by the contractor of any of the vessel's machinery, equipment or fittings, including, but not limited to, winches, pumps, riggings, or pipe lines; and (4) Furnish suitable offices, office equipment and telephones at or near the site of the work as the Contracting Officer reasonably requires for personnel designated by the Government. (d) Except as otherwise provided in the contract, the contractor shall furnish all necessary material, labor, supervision, services, equipment, tools, supplies, power, accessories, facilities, and other things and services necessary for accomplishing the work. (e) The contractor shall conduct dock and sea trials of the vessel as required by the contract. Unless otherwise expressly provided in the contract, during the conduct of these trials the vessel shall be under the control of the vessel's commander and crew with representatives of the contractor and the Government on board to determine whether the work provided by the contractor has been satisfactorily performed. Dock and sea trials not specified which the contractor requires for its own benefit shall not be undertaken by the contractor without prior notice to and approval of the Contracting Officer; any such dock or sea trial shall be conducted at the risk and expense of the contractor. The contractor shall provide and install all fittings and appliances which may be necessary for the dock and sea trials to enable the representatives of the Government to determine whether the requirements of the contract plans and specifications have been met. The contractor shall also be responsible for the care, installation and removal of any instruments and apparatus furnished by the Government for such trials. (End of clause) 1352.271-77 DELAYS (APR 2010) When, during the performance of this contract, the contractor is required to delay the work on a vessel temporarily, due to orders or actions of the Government respecting stoppage of work to permit shifting the vessel, stoppage of hot work to permit bunkering, fueling, embarking or debarking of passengers or loading or discharging of cargo, and the contractor is not given sufficient advance notice or is otherwise unable to avoid incurring additional costs on account thereof, an equitable adjustment may be made in the contract. Any such request for equitable adjustment shall be asserted in writing as soon as practicable after the delay or disruption, but not later than the day of final payment under the contract. (End of clause) 1352.271-79 LIABILITY AND INSURANCE (APR 2010) (a) The contractor shall exercise reasonable care and use its best efforts to prevent accidents, injury or damage to all employees, persons and property, in and about the work, and to the vessel or part thereof upon which work is done. (b) The contractor shall be responsible for and make good at its own cost and expense any and all loss of or damage of whatsoever nature to the vessel (or part thereof), its equipment, movable stores and cargo, and Government-owned material and equipment for the repair, completion, alteration of or addition to the vessel in the possession...

More opportunities from Department Of Commerce Noaa

Same awarding agency

NAICS: 541611
New
Federal
NOMEC and NOPP Partnership Forum
Solicitation # ACQ-SIMP-27-0061
The National Oceanic and Atmospheric Administration (NOAA), on behalf of the National Ocean Mapping, Exploration, and Characterization (NOMEC) Council and the National Oceanographic Partnership Program (NOPP), has issued this Request for Information (RFI) under solicitation number ACQ-SIMP-27-0061. The primary objective is to conduct market research and gather detailed input from the public to inform the development of a Partnership Forum focused on strengthening cross-sector collaborations for U.S. ocean mapping, exploration, and characterization. Specifically, NOAA seeks information on stakeholder priorities, technical capabilities, barriers to Federal collaboration, and actionable strategies to advance national ocean priorities in alignment with the NOMEC Strategy and Implementation Plan and the June 2026 ORAP report. This is not a formal solicitation, and the government is not currently seeking proposals or committing to a contract. Interested parties must submit a response by 3:00 PM MT on December 1, 2026, to the designated Contract Specialist and Contracting Officer. Submissions should be in PDF or Word format, not exceeding 20 pages, and must include company identification, SAM.gov UEID, business size, and details regarding existing Federal contracts or commercial catalogs. Respondents are encouraged to answer nine specific questions regarding their expertise and resources. All costs associated with responding to this RFI are the sole responsibility of the interested party.
Administrative Management and General Management Consulting Services

POSTED

1 day ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS