AM27-123 Hope River Fence Restoration Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The State of Utah Division of Purchasing, on behalf of the Division of Wildlife Resources, is soliciting bids for the Hope River Fence Restoration Project (AM27-123) in Echo, Summit County. The project involves the installation of approximately 2.5 miles of wildlife-friendly, 6-strand barbed wire fence designed to exclude trespassing sheep and protect big game forage. Technical specifications require 12.5-gauge 4-point barbed wire with posts spaced 14 feet apart, 6-foot tall green T-posts with white or gray tops, and steel drill pipe H-braces for splices and gates. The contractor must install between 8 and 12 gates, each 10 feet wide and braced on both sides. The project has a budget of $90,000.00, and the contract will be awarded to the lowest cost responsive and responsible vendor. The performance window for the project is from November 15, 2026, to June 30, 2027, with primary execution expected between April and June 2027. All work must be completed and invoiced by June 30, 2027, as no payments will be issued for work performed after this date. Vendors were required to attend a mandatory site visit on November 4, 2026. Awarded contractors must guarantee pricing for the project term and maintain commercial general liability insurance of at least $1,000,000 per occurrence and $3,000,000 aggregate, as well as statutory workers compensation coverage. The contract is governed by the Utah Procurement Code, and contractors must comply with E-verify and anti-boycott certifications. Invoices must be submitted within 30 days of delivery and will be paid within 30 days of receipt.
General Info
Agency
Place of Performance
UT, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
The purpose of this IFB is to enter into a contract to provide: installation of approximately 2.5 miles of 6-strand barbed wire fence in Summit County. Mandatory Site Visit: A mandatory site visit will be held on November 4, 2026, at 2:30 pm. We will meet at 40°58'22.1"N 111°26'38.9"W in Echo, UT .
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
The methodology or formula that will be used to determine the number of contract awards is: Lowest Cost.
Performance window: November 15, 2026 – June 30th, 2027 .
Vendor must guarantee its pricing for the term of the project..
Similar Contracts
Same NAICS industry code
More opportunities from Utah
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
