This Solicitation opportunity from Department Of Defense was posted on August 17, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

*Amendment 0010* USS SAN ANTONIO (LPD 17) FY22 Selective Restricted Availability (SRA)

Closed
N00024-21-R-4436Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation is soliciting proposals for the complete repower of a 30 foot Munson landing craft. The selected contractor will be responsible for the decommissioning and removal of two existing Honda BF250A outboard engines and the procurement and installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work is divided into six phases, encompassing structural transom inspections, the installation of Honda iST electronic control heads at dual helm stations, integration with the SeaStar Power Assist steering system, and a comprehensive fuel system overhaul using USCG Type A1-15 lines. The project concludes with NMEA 2000 network integration, digital gauge installation, and a minimum two hour sea trial to validate performance and safety protocols. To ensure factory warranty coverage, the contractor must maintain active Honda Marine Authorized Dealer or Service Center status. The vessel will be delivered via trailer to the contractor facility, which must provide a secure, fenced yard or indoor shop. Award evaluation is based on a weighted criteria of cost, technical expertise, and TERO status, with a preference for Colville Business Enterprises. Proposals must be submitted in PDF format by November 13, 2026. Final contracts are subject to tribal appropriation and may require a performance bond for values exceeding 100,000 dollars or a 25 percent retainage.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in 24 days
NAICS: 336611
New
Federal
USCGC CROCODILE DD2 FY27 #1 MDE W5
Solicitation # 70Z08027PBPLCROCODILE
The Department of Homeland Security, through the U.S. Coast Guard Surface Forces Logistics Center, has issued a Sources Sought Notice under solicitation number 70Z08027PBPLCROCODILE to conduct market research for drydock and dockside repairs to the USCGC CROCODILE (WPB-87369). This notice is intended to identify capable sources, determine the availability of suitable commercial items, and understand current commercial practices to inform future competition and set-aside decisions. The anticipated scope of work includes 34 specific items, such as Main Diesel Engine W-5 maintenance, propulsion shaft and rudder assembly renewal, 100 percent underwater body and hull plating preservation, tank cleaning, and the provision of drydocking and sea trial support. The anticipated period of performance is 63 calendar days, scheduled from April 20, 2027, to June 22, 2027. All work is to be performed at the contractor's facility with no geographical restrictions. Interested firms under NAICS code 336611, which has a size standard of 1,300 employees, must submit capability statements, business size certifications, and past performance information by October 21, 2026. This notice does not constitute a formal solicitation or an obligation for the government to take further action, and potential offerors are advised to monitor Sam.gov for any future solicitations.
CG-SEA-C21

POSTED

about 12 hours ago

DEADLINE

in about 15 hours

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

DC, USA

Set-Aside

NONE

Documents

50

21-R-4436 Amendment 0009 Conformed

DOCX, High priority: read this first165 pages · amendment
High

A0004 - Amendment

DOCX, High priority: read this first17 pages · amendment
High

A0005 - Amendment

DOCX, High priority: read this first7 pages · amendment
High

Attachment S-3 Pre-Proposal Information (PPI) Form

XLSX, High priority: read this first3 pages · supporting-document
High

Department of the Navy - Quality Assurance Surveillance Plan (Rev 1)

DOCX, High priority: read this first6 pages · qasp
High

E4 Index Report (FY-22 Standard Items)

PDF, High priority: read this first5 pages · specifications
High

N0002421R4436 Amendment 0006

PDF, High priority: read this first2 pages · amendment
High

N0002421R4436 Amendment 0007

PDF, High priority: read this first2 pages · amendment
High

N0002421R4436 Amendment 0008

PDF, High priority: read this first8 pages · amendment
High

N0002421R4436 Amendment 0008 - USS SAN ANTONIO (LPD 17) SRA

PDF, High priority: read this first183 pages · amendment
High

N0002421R4436 Amendment 0009

PDF, High priority: read this first26 pages · amendment
High

N00024-21-R-4436 Amendment 0010

PDF, High priority: read this first8 pages · amendment
High

N00024-21-R-4436 Amendment 0010 - USS SAN ANTONIO (LPD 17) SRA

PDF, High priority: read this first183 pages · rfp
High

N00024-21-R-4436 Amendment A0001

PDF, High priority: read this first9 pages · amendment
High

N00024-21-R-4436 Amendment A0002

PDF, High priority: read this first28 pages · amendment
High

N00024-21-R-4436 Amendment A0003

PDF, High priority: read this first14 pages · amendment
High

N00024-21-R-4436 Attachment 8 - Government Furnished Material List

XLSX, High priority: read this first266 pages · sow
High

N00024-21-R-4436 Attachment J-5 Quality Assurance Surveillance Plan

PDF, High priority: read this first6 pages · qasp
High

N00024-21-R-4436 Attachment J-8 Government Furnished Material List

XLSX, High priority: read this first266 pages · specifications
High

N00024-21-R-4436 USS SAN ANTONIO - Bidder Questions

XLSX, High priority: read this first6 pages · q-and-a
High

N00024-21-R-4436 USS SAN ANTONIO - Bidder Questions and Answers

XLSX, High priority: read this first30 pages · q-and-a
High

N00024-21-R-4436 USS SAN ANTONIO - Bidder Questions and Answers

XLSX, High priority: read this first3 pages · q-and-a
High

N0002421R4436 - USS San Antonio (LPD 17) FY22 SRA

PDF, High priority: read this firstrfp
High

N0002421R4436 - USS SAN ANTONIO (LPD 17) FY22 SRA

PDF, High priority: read this first186 pages · rfp
High

N00024-21-R-4436 USS SAN ANTONIO (LPD 17) FY22 SRA PPI Form

XLSX, High priority: read this first2 pages · q-and-a
High

N00024-21-R-4436 USS SAN ANTONIO (LPD 17) FY22 SRA Q&A

PDF, High priority: read this firstq-and-a
High

N00024-21-R-4436 USS SAN ANTONIO Q&A

XLSX, High priority: read this firstq-and-a
High

N00024-21-R-4436 USS SAN ANTONIO Q&A

XLSX, High priority: read this first9 pages · q-and-a
High

RLAR 88837/LPD17/L089 - USS SAN ANTONIO (LPD17)

PDF, High priority: read this first5 pages · modification
High

TPPC-LPD17-MARMCN22-CN01 Errata 2

PDF, High priority: read this firstamendment
High

TPPC-LPD17-MARMCN22-CN01 Errata 3

PDF, High priority: read this first64 pages · amendment
High

TPPC-LPD17-MARMCN22-CN01 Errata 4

PDF, High priority: read this first1 page · amendment
High

TPPC-LPD17-MARMCN22-CN01 Errata No. 6

PDF, High priority: read this first73 pages · amendment
High

TPPC-LPD17-MARMCN22-CN01 Errata One - USS San Antonio

PDF, High priority: read this first187 pages · amendment
High

USS SAN ANTONIO FY22 SRA Pricing Workbook

XLSX, High priority: read this first39 pages · specifications
High

USS SAN ANTONIO FY22 SRA Pricing Workbook

XLSX, High priority: read this first39 pages · specifications
High

USS SAN ANTONIO FY22 SRA Pricing Workbook (Rev 1)

XLSX, High priority: read this first42 pages · specifications
High

USS SAN ANTONIO (LPD 17) Addendum No 1 - TPPC-LPD17-MARMCN22-CN01

PDF, High priority: read this first14 pages · amendment
High

USS SAN ANTONIO (LPD 17) FY22 SRA Attachment S-7 Proposal Assessment

XLSX, High priority: read this first2 pages · specifications
High

USS SAN ANTONIO (LPD 17) FY22 SRA - Compartment Close-out List

XLSX, High priority: read this first33 pages · specifications
High

USS SAN ANTONIO (LPD 17) FY22 SRA Execution Milestones

XLSX, High priority: read this first15 pages · specifications
High

USS SAN ANTONIO (LPD 17) FY22 SRA Execution Milestones and Key Event Dates

XLSX, High priority: read this first15 pages · specifications
High

USS SAN ANTONIO (LPD 17) FY22 SRA - J-10 Milestone Reports

XLSX, High priority: read this first18 pages · specifications
High

USS SAN ANTONIO (LPD 17) FY22 SRA - J-7 Schedule Model Review

PDF, High priority: read this firstspecifications
High

USS SAN ANTONIO SSP TPPC-LPD17-MARMCN22-CN01 Addendum 2

PDF, High priority: read this first7 pages · amendment
High

USS SAN CDRL Exhibit A

PDF, High priority: read this first14 pages · sow
High

USS SAN CDRL Exhibit B

PDF, High priority: read this first9 pages · specifications
High

USS SAN - CDRL Exhibit C

PDF, High priority: read this first2 pages · cdrl
High

A0005 Conformed Copy

DOCX, Low priority164 pages · other
Low

Past Performance Questionnaire

DOCX, Low priority3 pages · past-performance
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

20 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jul 20, 2021 to Jul 26, 2021. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 26, 2021 to Aug 16, 2021. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 16, 2021 to Aug 23, 2021. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice title changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsea Hq
Contacts2 people available
OfficeWASHINGTON NAVY YARD, DC, 20376-5000, USA
Office AddressWASHINGTON NAVY YARD, DC, 20376-5000, USA

Full Description

Show more
AMENDMENT A0010--The purpose of this amendment is to extend the date by which offerors may submit proposals from August 23, 2021 to August 30, 2021. SOLICITATION ATTACHMENT UPDATE-- This update adds a column for tracking Work Items/CSWT #s in responses to bidder questions. No additional questions have been answered at this time. Additional answers to the remaining questions are forthcoming. *AMENDMENT A0009 - To Be Posted AUG 9* AMENDMENT A0008--The purpose of this amendment is to extend the date by which offerors may submit proposals from August 16, 2021 to August 23, 2021. AMENDMENT A0007--The purpose of this amendment is to release responses to bidder questions, release Eratta 5, revise Attachment J-8, and provide pictures for bidder question #31. Eratta 5, revised Attachment J-8, and pictures for bidder question #31 are available upon written request to Lee Hutchinson at diana.l.hutchinson@navy.mil, Daniel Breedlove at daniel.j.breedlove.civ@us.navy.mil, and Katie Daniels at alana.k.daniels2.civ@us.navy.mil. AMENDMENT A0006--The purpose of this amendment is to release responses to bidder questions. AMENDMENT A0005--The purpose of this amendment is to extend the date by which offerors may submit proposals from July 26, 2021 to August 16, 2021. AMENDMENT A0004--The purposes of this amendment are to: (1) revise CLINs 0014-0018 under SECTION B; (2) revise Paragraph 6.9 under SECTION C; (3) revise SECTIONS E and I; (4) remove and replace Attachments J-3, J-4, J-8 and J-9; (5) add Erratas 3 and 4; and (6) provide updated S-3. AMENDMENT A0003- Reference attached Amendment A0003 in response to bidder's questions (various), extend the deadlines for bidder's questions submission date, update Attachment J-8, update Section G, update Section L, update Section M, update 252.211-7001. AMENDMENT A0002- Reference attached Amendment A0002 in response to issue Errata No. 2, issue Addendum No. 2, update Section B, update Section C, update Section L, and update Section J to incorporate Attachment J-3 (Rev 1), J-4 (Rev 1), J-8 (Rev 1), and J-9 (Rev 1). AMENDMENT A0001- Reference attached Amendment A0001 in response to bidder's questions 1-12, extend the deadlines for PPI, DoD SAFE link, proposal due date, and proposal validity date, issue Errata No. 1, issue Addendum No. 1, and update Section J to incorporate Attachment J-5 (Rev.1), remove Attachment S-8, and rename Attachment S-9 to Attachment S-2. USS SAN ANTONIO (LPD 17) FY22 SRA The Naval Sea Systems Command (NAVSEA) issues solicitation N00024-21-R-4436 for the execution of the USS SAN ANTONIO (LPD 17) FY22 SRA. This availability includes a combination of maintenance, modernization, and repair, and will require highly capable contractors with substantial facilities, to include capable pier (for the applicable ship class) as well as human resources capable of completing, coordinating, and integrating multiple areas of ship maintenance, repair and modernization. This availability is competed on a coast-wide basis. Based on the complexity, magnitude and duration of the requirement, the Government's market research indicates there are not two or more small business concerns capable of competing for these requirements and therefore this procurement will not be set-aside for small business (FAR 19.502-2(b)). The solicitation is issued electronically via beta.SAM.gov and interested parties must comply with that announcement. Interested offerors should monitor the beta.SAM.gov page for the release of the solicitation, and any applicable amendments. Offerors must be registered in the System for Award Management (SAM) in order to participate in this procurement at https://www.sam.gov. SAM.gov is the single point of entry for posting of the synopsis and solicitations to the internet. All responsible sources may submit a proposal, which shall be considered by the agency. The work package and all attachments not posted will be released after the RFP has been announced on beta.SAM.gov. Offerors are to note the following attachments will not be posted to beta.SAM.gov: Attachment J-1 Specification Package TPPC-LPD17-MARMCN22-CN01 Attachment J-2 Work Item Plans, Drawings and Other References These documents are available by written request to Diana L Hutchinson, at Diana.L.Hutchinson@navy.mil, and Stephanie Allshouse at Stephanie.J.Allshous@navy.mil. Those companies who wish to receive the Government Furnished Information (GFI) relevant to N00024-21-R-4436 are to submit a signed statement on company letterhead that states your company is a United States Department of Defense to Contractor Diana L Hutchinson, at Diana.L.Hutchinson@navy.mil, and Stephanie Allshouse at Stephanie.J.Allshous@navy.mil. This statement will be verified in System for Award Management located at (https://www.sam.gov/SAM/). The Government anticipates making a single award on or around December 2021. The availability start date is anticipated to be February 2022. Place of Performance: Contractor Facilities; East Coast, USA

More opportunities from Department Of Defense → Navsea Hq

Same awarding agency

NAICS: 334511
New
Federal
AN/BYG-1 Applications Re-Architecture
Solicitation # N0002426R6222
Solicitation N0002426R6222, issued by the Naval Sea Systems Command (Navsea HQ), seeks a contractor for the AN/BYG-1 Applications Re-Architecture. This effort involves the re-architecting of applications associated with the AN/BYG-1 system. The solicitation was posted on October 7, 2026, with a response deadline of November 5, 2026. The primary point of contact for the effort is Michael Ravnitzky, with Matthew C. Hedrick serving as the Contracting Officer. Due to the sensitive nature of the work, strict security and data handling requirements are in place. Offerors must possess a SECRET security clearance and provide a verified DD Form 2345 Military Critical Technical Data Agreement and a signed Terms of Use Agreement to access Government Furnished Information, source code, and technical documents. All data must be handled in accordance with NISPOM standards, and the transmission of information to foreign nationals or outside the United States is prohibited without a valid export license. Furthermore, the use of public cloud repositories or external AI tools for processing technical data is strictly forbidden. Contractors are required to destroy all provided data within 180 days of the RFP closing and maintain destruction records for five years.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 334511
New
Federal
Navy Electronic Chart Display and Information System (ECDIS) Hardware and Software Production
Solicitation # N00025-26-R-5246
The U.S. Navy, through the Portfolio Acquisition Executive Mission Systems and PEO IWS 6.0, is soliciting proposals for the development, production, integration, testing, fielding, and lifecycle sustainment of the Electronic Chart Display and Information System (ECDIS) hardware and software. This effort supports navigation requirements for both surface and subsurface platforms, specifically focusing on the manufacture and assembly of AN/SYN-1 and Scalable Integrated Bridge System (S-IBS) hardware, alongside the maintenance and modification of software using Government Furnished Information. The anticipated contract structure consists of one base year and four one-year option periods beginning in FY27, with an award expected in Q4 FY27. The procurement will be awarded to the offeror representing the best value to the government based on a tradeoff process. Evaluation factors include technical approach, management approach, past performance, and total evaluated cost/price, with technical and management factors weighted more heavily than price. Mandatory requirements for offerors include Secret facility and personnel clearances and compliance with ANSI/ASQ/ISO9001:2015 quality standards. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal by January 13, 2027, and must include detailed pricing using a stepladder structure for hardware and level-of-effort tasks for software support.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

1 day ago

DEADLINE

in 3 months
View Details
NAICS: 336611
New
Federal
USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s)
Solicitation # N0002426R4421
The Naval Sea Systems Command (NAVSEA) is soliciting proposals for the USS MAKIN ISLAND (LHD 8) Fiscal Year 2028 Docking Selected Restricted Availability (DSRA). This Signature Availability is a comprehensive effort combining maintenance, modernization, and repair, requiring a contractor with substantial West Coast facilities, including a capable pier for the LHD ship class. The project is expected to begin in November 2027 and reach completion by October 30, 2029. Due to the complexity and magnitude of the requirements, the procurement is not set aside for small businesses. The government intends to make a single Firm Fixed-Price award in or before March 2027 based on a best-value trade-off source selection process. The scope of work encompasses extensive tasks including structural welding, cabling, piping, electrical and ventilation work, and overhauls of the propulsion and electric plants. Key deliverables include an integrated production schedule and participation in initial schedule model and work package execution reviews. Evaluation will prioritize non-price factors, specifically technical eligibility, physical resource capacity, manpower, and past performance, which are considered significantly more important than price. Proposals must be submitted via the PIEE Solicitation Module by November 9, 2026, divided into a Price Volume and a Technical Volume. The contract includes specific provisions for growth work, with estimated requirements of 211,989 direct labor hours and over 9.5 million dollars in materials, alongside a maximum incentive available of 15 million dollars.
Ship Building and Repairing

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 333415
Federal
Shipboard Air Conditioning Plant System Sustainment Plan (SSP)
Solicitation # N0002427R4452
Navsea HQ is conducting market research under solicitation N0002427R4452 to identify capable sources for the Shipboard Air Conditioning Plant System Sustainment Plan (SSP). This initiative aims to standardize and scale the sustainment of centrifugal, reciprocating, and rotary air conditioning plants for U.S. Navy surface ships worldwide. The government is evaluating various acquisition strategies, including a single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract or multiple-source arrangements, to improve materiel condition and operational availability across diverse ship classes and geographic locations. The contemplated scope of work encompasses six primary capability areas: executing Major AC Plant Pit Stops and overseeing Minor Pit Stops, both of which must be completed within a mandatory six-week window; providing embedded AC&R technical expertise at Shore Intermediate Maintenance Activities (SIMAs) for Sailor training and oversight; supplying OEM AC plant materiel and repair parts; managing a global warehouse and rotable pool for Overhaul Parts Packages (OPPs); providing configuration-specific engineering, technical data, and integrated product support; and delivering global unplanned and emergent field services. Interested respondents must submit a response by October 28, 2026, including a completed Capability Certification Matrix and supporting evidence of their ability to perform these requirements organically or through teaming arrangements.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

7 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS