Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 3, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

[Amendment 04] New Mezzanine Design and Construction for JBMDL, NJ

Closed
W912DY20R0048Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 14 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 14 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 14 hours ago

DEADLINE

in 10 days

General Info

Contract Value

$252,823

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Joint Base MDL, NJ, 08641, USA

Set-Aside

SBA

Award Issued Date

Documents

9

20R00480003_Amendment03.pdf

PDF

20R00480004_Amd04.pdf

PDF

W912DY20R0048+0001_SOW_05152020.pdf

PDF

W912DY20R0048+0002_%28Revised%29Appendix+8.pdf

PDF

W912DY20R0048+0002_Amendment+02.pdf

PDF

W912DY20R0048+0002_SOW_05202020.pdf

PDF

W912DY20R0048_ProjnetQuestionsAndAnswers.pdf

PDF

W912DY20R0048_RFP+Amendment+01.pdf

PDF

W912DY20R0048_SF1442%28complete%29.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Deadline changed

Response deadline changed from May 26, 2020 to Sep 4, 2020.

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Sep 4, 2020 to Sep 9, 2020. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil
Contacts2 people available
OfficeREDSTONE ARSENAL, AL, 35898-0000, USA
Office AddressREDSTONE ARSENAL, AL, 35898-0000, USA

Full Description

Show more
SOLICITATION AMENDMENT 04: Extends the RFP due date to NLT 9 September 2020 at 10a.m.; Incoporates a summary of answers to bidder inquiries through Projnet, and Changes the disclosure of magnitude to $250K to $500K. SOLICITATION AMENDMENT 03: Incorporating a revised Statement of Work dated 17 August 2020 and revised/updated Appendix 8 (As-Builts); revising CLIN titles and description, extending the RFP due date to NLT 4 September 2020 at 1200 (CST), reopening Projnet for Bidder Inquiries until 26 August 2020 at 1600 (CST). SOLICITATION AMENDMENT 02: Incorporating a revised Statement of Work dated 20 May 2020 and revised/updated Appendix 8 (As-Builts). SOLICITATION AMENDMENT 01: Incorporating a revised Statement of Work dated 15 May 2020, Appendix 8 (As-Builts), and Projnet Question and Answers. The objective for this Statement of Work (SOW) is to provide plant, material, labor and equipment necessary for the disassembly, relocation and reassembly of first and second floor components of the existing mezzanine structure. Contractor shall relocate the mezzanine from the existing location Johnstown, PA to new location at ECS 99 (Building 3351 Lexington Ave) located at Joint Base McGuire-Dix-Lakehurst (JBMDL), NJ. This effort includes all the necessary required architectural, structural, mechanical, electrical, and telecommunications components necessary for meeting the mission of the 99th Readiness Division (RD). The mezzanine has approximately 1,257.75 of open sf on the first level and has approx. 429 sf of enclosed space on the second level; the Second level includes office and supply/storage area. The mezzanine will be reconfigured with the 1257.75 open sf on the second level, and the 429 sf of enclosed space (including the office and supply/storage area) shall be on the first level.

More opportunities from Department Of Defense → W2V6 USA Engineering Spt Ctr Huntsvil

Same awarding agency

NAICS: 236220
Federal
HQ USMC Phase 2 Relocatables Progressive Design Build OTA
Solicitation # CEHNC-HQUSMC-10072026
The U.S. Army Corps of Engineers, through the Engineering and Support Center Huntsville, is initiating a competition for the HQ USMC Phase 2 Relocatables project. This effort utilizes a Progressive Design Build approach under 10 USC 2808a Other Transaction Authority for Construction. The project involves the design and construction of ICD 705-compliant Secured Working Areas (SWA) capable of dual accreditation in accordance with ICD/ICS 705, DoD 5200.1, and NSA 94-106. Key technical requirements include 100% Fiber-to-the-Desk infrastructure, STC 50 acoustic attenuation for all interior spaces, and rigorous RF shielding verified through third-party Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT). The scope encompasses a turnkey solution including civil site development, environmental mitigation, life safety, and comprehensive interior design. The total period of performance is 630 calendar days from the Notice to Proceed, with specific timelines requiring site adaptation within 100 days, assembly within one week of delivery, and final hookup and furniture installation within 40 days of delivery. Facilities must be manufactured at the vendor's secure location and delivered to designated project sites. Key personnel, including the Site Superintendent, Site Safety and Health Officer, and Quality Control Representative, must be U.S. citizens. The government will conduct an Industry Day on October 27, 2026, to provide further details on the acquisition strategy and requirements, with RSVPs required by October 23, 2026. Design deliverables are structured around sequential submissions at 65%, 95%, 100%, and Issued for Construction milestones.
Commercial and Institutional Building Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS