Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

American Dark Fiber State Route 20, 29, 53 & 175 Middle-Mile Broadband Network Project (Encroachment Permit 01-25-6-BB-0210)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Clearlake, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Dotrik WilsonBranch Chief
Brian LuceroProject Manager

Full Description

Show more
American Dark Fiber, LLC (ADF), in coordination with the California Department of Technology and the California Department of Transportation, proposes to install broadband infrastructure consisting of conduit, fiber optic cable, vaults, and markers on SR 20 between PM 31.546 to PM 31.598, SR 29 at PM 5.802 and between PM 5.977 to PM 5.999, PM R9.838 to R9.878, and PM 11.087 to 20.267, SR 53 between PM 0.036 to PM 7.394, and SR 175 between PM 28.002 to 28.035 in Lake County.

More opportunities from California → Caltrans, District 3 - Marysville/Sacramento

Same awarding agency

NAICS: 237310
SLED
Salt Creek Canyon
Solicitation # 03- 0L000
The California Department of Transportation (Caltrans) District 3 is conducting the Salt Creek Canyon Project on State Route 20 in Colusa County, extending from the Colusa/Lake County line to the Interstate 5 intersection. This comprehensive safety improvement initiative includes widening nonstandard shoulders, pavement and drainage rehabilitation, the installation of rumble strips, and upgrading guardrails and end treatments to Manual of Assessing Safety Hardware (MASH) standards. The project also incorporates stormwater treatment via bioswales and bio strips, along with vegetation management and the installation of rock slope protection. A critical component of the project is a geotechnical investigation to evaluate subsurface conditions for the design and construction of earth retaining systems, specifically soldier pile walls with ground anchors or soil nail walls and associated embankments. This scope of work involves drilling, visual logging, in-situ testing, and the sampling of soil and rock, as well as the execution of Seismic Refraction Tomography and Electrical Resistivity Tomography. The geotechnical portion of the project is categorized as exempt under CEQA Section 15306 for information collection and is categorically excluded under NEPA. Coordination with the Native American Heritage Commission is ongoing to ensure the protection of tribal cultural resources.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS