Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Salt Creek Canyon

Forecast
03- 0L000State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation (Caltrans) District 3 is conducting the Salt Creek Canyon Project on State Route 20 in Colusa County, extending from the Colusa/Lake County line to the Interstate 5 intersection. This comprehensive safety improvement initiative includes widening nonstandard shoulders, pavement and drainage rehabilitation, the installation of rumble strips, and upgrading guardrails and end treatments to Manual of Assessing Safety Hardware (MASH) standards. The project also incorporates stormwater treatment via bioswales and bio strips, along with vegetation management and the installation of rock slope protection. A critical component of the project is a geotechnical investigation to evaluate subsurface conditions for the design and construction of earth retaining systems, specifically soldier pile walls with ground anchors or soil nail walls and associated embankments. This scope of work involves drilling, visual logging, in-situ testing, and the sampling of soil and rock, as well as the execution of Seismic Refraction Tomography and Electrical Resistivity Tomography. The geotechnical portion of the project is categorized as exempt under CEQA Section 15306 for information collection and is categorically excluded under NEPA. Coordination with the Native American Heritage Commission is ongoing to ensure the protection of tribal cultural resources.

General Info

Caltrans District 3 safety improvements and geotechnical investigations for Salt Creek Canyon Project.

Place of Performance

Husted Road; Bear Valley Road; SR 16, Colusa, CA, 95423

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Thaleena BhattalSenior Environmental Branch Chief
Jordan SchmidtEnvironmental Coordinator

Full Description

Show more
The California Department of Transportation (Caltrans) proposes to conduct a geotechnical investigation to evaluate subsurface conditions for the Salt Creek Canyon Project on State Route 20 in Colusa County. The scope of geotechnical work includes subsurface investigation work for site geotechnical engineering characterization for the design and construction of the proposed project soldier pile walls with ground anchors or soil nail walls and associated widenings / embankments. Soldier pile walls possibly with rows of ground anchors are proposed at post miles 10.85 EB, 11.10 EB and 11.25 WB. The subsurface investigation program will involve drilling, visual logging, in-situ testing, and sampling of soil and rock from borings at the proposed ERS locations.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 17 hours ago

DEADLINE

in 5 days
View Details

More opportunities from California → Caltrans, District 3 - Marysville/Sacramento

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS