Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on June 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AMSCO 50 - series 3 - Bay Sink

Awarded
36C25526Q0442Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 327110
New
DIBBS
INTERCONNECTING BOX
Solicitation # SPE4A7-27-T-1871
Solicitation SPE4A7-27-T-1871, issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div, is for the procurement of five Interconnecting Boxes (NSN 5975016617377). The contract is a fixed-price acquisition with delivery required within 171 days after order, specifying an original required delivery date of March 19, 2027, and a need ship date of April 20, 2027. Shipping is FOB Origin under the First Destination Transportation program, with the final delivery point located at the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to the DLA Master List of Technical and Quality Requirements, specifically citing RP001 for packaging, RQ011 for the removal of government identification from non-accepted supplies, and RQ017 for bare item marking. Quality assurance will be managed through destination inspection and acceptance using zero-based sampling plans per MIL-STD-1916 or ASQ H1331. Packaging must comply with ASTM D3951 for non-hazardous materials or TQ requirement IP025 for hazardous materials, with all shipments labeled according to MIL-STD-129. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, domestic material restrictions, and the prohibition of additive manufacturing unless specifically authorized.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

6 days ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract requires the installation of five AMSCO 50 Series 3-Bay Reprocessing Sinks at the Kansas City Veterans Administration Medical Center located at 4801 Linwood Blvd, Kansas City, MO 64128, to support the manual cleaning of sterilization-compatible reusable medical devices used across operating rooms, dental services, gastroenterology, pulmonology, and surgical clinics. The sinks must be 304 stainless steel, with adjustable heights ranging from 44-9/16 inches to 52-9/16 inches, and installed with a minimum .875-inch clearance from adjacent walls; back-to-back installations require a 53-inch pony wall with no obstructions up to 54 inches. The equipment must comply with AAMI/ANSI, OSHA, and FDA standards, and the contractor is responsible for site visits to confirm existing conditions, verify material quantities, and resolve any discrepancies prior to submission. All installations must include complete connection components, a post-installation check-out test, necessary adjustments, and the removal and disposal of all packaging and debris. The contractor must provide comprehensive training to clinical staff with documented duty tours and ensure all work is performed exclusively by fully qualified technicians or engineers. The sinks require specific utility connections: hot water at 125 PSI maximum, 1.6 GPM flow, 40°F to 180°F temperature range; cold water at the same pressure and flow but limited to 70°F maximum; pure water at 125 PSI, .25 to 2.0 GPM, 40°F to 140°F; an air gun at 44 PSI; and a basin drain with a 1-1/2 inch ABS P-trap and estimated 20 GPM per basin drain rate. Each unit demands a 120V, 15A GFCI-protected outlet supporting the LINAK DL2 lift system rated at 562 lbs capacity, 3/8 inch per second lift speed, and 120VAC, 3A with overload protection. Water quality must conform to strict parameters for dissolved solids, alkalinity, pH, and silica levels. The contractor must provide a full-service maintenance agreement for at least one year post-installation, including emergency response within four hours of failure, a temporary solution within 24 hours, and a permanent resolution with replacement orders within five business days. All

General Info

Supply, install five AMSCO 50 Series sinks at Kansas VA, meeting specs, training, and one-year service.

Contract Value

$126,510

NAICS

327110 - Pottery, Ceramics, and Plumbing Fixture Manufacturing

Place of Performance

Kansas City, MO, 64128, USA

Set-Aside

SBA

Award Issued Date

Documents

1

Solicitation 36C25526Q0442 for Commercial Products and Services

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)
Contacts1 person available
OfficeLEAVENWORTH, KS, 66048, USA
Office AddressLEAVENWORTH, KS, 66048, USA

Full Description

Show more

1. STATEMENT OF WORK


The contractor shall furnish all necessary services, labor, travel, transportation, materials, shipping, parts, connections, and equipment. This includes the provision and on-site installation of at least 5 AMSCO 50 Series Reprocessing Sinks at 4801 Linwood Blvd, Kansas City MO 64128. These reprocessing sinks are required by the Sterile Processing Services (SPS) to facilitate the manual cleaning of sterilization-compatible reusable medical devices (RMD) in invasive procedures. Their use will support a range of medical procedures and surgeries, including those in the operating room, dental services, procedural gastroenterology, procedural pulmonology and surgical clinics.



The contractor bears the responsibility for the removal and disposal of all debris and packaging materials resulting from the reprocessing sinks installation. Prior to equipment utilization, the contractor is required to provide training to clinical staff, with all duty tours for the sterile processing department being documented.



The scope of this contract comprises five AMSCO 50 Series Reprocessing Sinks. Associated services include complete installation components, execution of a post-installation check-out test, and implementation of any necessary adjustments.



2. SPECIFICATIONS


  • Minimum of five 3 Bay 97.5” x 28” x 33”- 41” Adjustable Height Reprocessing Sinks.
    • Installer Must Maintain a Minimum Gap of .875” To All Adjacent Walls as a Pinch Point Protection.
    • Unit Must Be Installed Against a Wall, For Back-to-Back Installation a Pony Wall is Required.
    • 304 Stainless Steel Construction.
    • Pony Wall Must Be 53”
    • Wall Must Be Free of Obstructions to 54”
  • Utility requirements (plumbing)
    • Hot Water (HW)

  1. Connection Type/Size- 3/8” COMPRESSION
  2. Pressure Range- 15 to 125PSI
  3. Operating Flow Rate- 1.6GPM @ MAX PSI
  4. Temperature Range 40° to 180°F
  5. Water Quality- Steris recommends the following water quality parameters:

  • 100-200 PPM (500PPM MAX) TOTAL DISOLVED SOLIDS.
  • 71-120 PPM (180PPM MAX) TOTAL ALKALINITY.
  • 6.8-7.0PH (7.5 MAX).
  • 0.1-0.5PPM (1.0) TOTAL SILICA.
    • Cold Water (CW)

  1. Connection Type/Size- 3/8” COMPRESSION
  2. Pressure Range- 15 to 125PSI
  3. Operating Flow Rate- 1.6GPM @ MAX PSI
  4. Temperature Range- 70° F MAX
  5. Water Quality- Steris Recommends The Following Water Quality Parameters:

  • 100-200 PPM (500PPM MAX) TOTAL DISOLVED SOLIDS.
  • 71-120 PPM (180PPM MAX) TOTAL ALKALINITY.
  • 6.8-7.0PH (7.5 MAX).
  • 0.1-0.5PPM (1.0) TOTAL SILICA
    • PURE WATER (PW)

  1. Connection Type/Size- ½” NPT
  2. Pressure Range- 20 TO 125 PSI
  3. Operating Flow Rate- .25 TO 2.0 GPM 15%
  4. Temperature Range- 40° F to 140° F
    • WATER GUN (WG)

  1. Connection type/size- 3/8” Compression
  2. Pressure Range- 0 TO 44 PSI
  3. Temperature Range- 40° TO 125°
  4. Water Quality- Recommendations listed under #5 of (HW & CW)
    • Air Gun (AG)

  1. Connection Type/Size- ¼” NPT
  2. Pressure Range- 30 PSI MAX
  3. Tip 1-5- Tip consumption at 30 PSI (Tip 4 and 5 must be operated at 30 PSI or less to comply with OSHA Directive.
    • Basin Drain (BD)

  1. Connection Type- 1-1/2” ABS P-TRAP (INCLUDED), 2” Copper P-Trap (Accessory)
  2. Drain Rate At 20 GPM Each Basin (Estimated)
    • Each Drain Individually Trapped

  1. When Traps Are Not Required, Elbows Can Be Purchased Locally.

  • Electricity- 120V, 15A GFCI Protected Outlet
    •  LINAK DL2 LIFT SYSTEM

  1. Weight Capacity- 562LBS (2500 N) Each
  2. Adjustment Range- 8.0” (203.2)
  3. Lift Speed- Up To 3/8” (10) Per Second
  4. Voltage- 120VAC, 3A With Overload Protection

  • PHYSICAL SPECIFICATIONS

  1. Shipping Dimensions- 132Lx 36Wx 48H
  2. Shipping Weight- 580LBS
  3. Operating Dimensions L x W x H- 97.5” x 28” x 44-9/16” TO 52-9/16” [2477 x 711 x 1132 TO 1412]

  • Concrete Floor Must Remain Free of Defects in These Areas for Installation of Seismic Anchors (Not Provided by Steris).
    • Refer to Equipment Specific Seismic Drawing for More Information.
  • The Reprocessing Sinks must adhere to industry standards for AAMI/ ANSI, OSHA, etc.
  • Documented FDA approval, as applicable.



3. REQUIREMENTS


  • The Contractor is responsible for conducting site visits to verify existing conditions, material quantities, installation instructions, and to identify any discrepancies or conflicting requirements within the Statements of Work before preparing the Final Proposal.
  • The Contractor shall provide and install five AMSCO 50 Series Reprocessing Sinks to the VA Medical Center located at 4801 Linwood Kansas City, Mo 64128. 
  • The Contractor must ensure that all repairs, preventative maintenance and remedial maintenance provided during this contract’s timeframe meet or exceed the OEM’S specifications.
  • The contractor shall employ ONLY FULLY QUALIFIED TECHNICIANS/ENGINEERS for all work performed under this contract.
  •  The contractor shall ensure that only FULLY QUALIFIED TECHNICIANS/ENGINEERS are employed under this contract.
  • The Contractor shall maintain the highest standard of professional capability and workmanship throughout the life of this contract.



4. EQUIPMENT MAINTENANCE & RESPONSE TIMES



The vendor shall provide full-service maintenance through a service agreement for minimum 1 year post installation. The vendor shall provide all additional recurring and preventive maintenance activities:




  1. Emergency response for equipment and MSPS failures. The vendor shall respond to the facility for any equipment failure resulting in a total or partial loss of the equipment installed within or any portion of the mobile sterile processing system within 4 hours from the time of VAMC contact. If a permanent solution cannot be resolved within 24 hours of initial failure, a temporary solution shall be operational within 24 hours of initial failure. An agreed permanent solution shall be planned, and replacements ordered within 5 business days of initial failure.



5. SAFETY



The contractor/vendor shall always, ensure that all work provided complies with all local, State, and Federal rules and regulations pertaining to workplace safety. The contractor shall take all proper safety and health precautions to protect the work, the workers, the public and the property (OSHA). Installs and construction work will be in accordance with all applicable codes to include the most current codes National Fire Protection Association (NFPA), and the VA Design Guide Manuals that are applicable to the work. If the design guide is equivalent or more stringent then the mentioned codes, the VA Design Guide takes precedence.



6. DOCUMENTATION



The contractor shall furnish to the KCVA Medical Center Biomedical Engineering department legible hard copies and electronic copies of service reports of the maintenance indicating details of the maintenance performed upon completion of all work.



7. PLACE OF PERFORMANCE



Kansas City Veteran Administration Medical Center, 4801 Linwood Blvd. Kansas City 64128



8. PERFORMANCE MONITORING


The contractor’s performance will be monitored by the Contracting Officer (CO), Contracting Officer Representative (COR), Infection Control Risk Assessment Office, and Safety Office during the rental agreement period.



Coordinate all administrative and construction requirements exclusively with or through assigned Contracting Officer Representative (COR).



The Construction Safety Officer, Construction Safety Committee, and COR will review the operations and site construction conditions of the project to confirm that all Safety regulations relating to construction and healthcare facilities are being adhered to. Daily and weekly safety rounds will be conducted. For non-compliance safety related issues, a safety report will be sent to the Contractor to correct within 14 days. Non-compliance may result in job-site suspense until compliance is met at the contractor’s expense.



9. HOURS OF OPERATION



The contractor will perform services required during the hours of 7:30 am – 4:00 pm, Monday through Friday or as directed by the designated COR.


More opportunities from Department Of Veterans Affairs → 255-NETWORK Contract Office 15 (36C255)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS