Anderson School Road Bridge #2710013 over Spring Fork Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Pettis County, Missouri, is seeking sealed bids for the replacement of Bridge #2710013 on Anderson School Road over Spring Fork. The project involves the construction of a new 121-foot NU-Girder Bridge and associated roadway work. Bids must be submitted to the Pettis County Clerk's office by 10:00 a.m. on September 15, 2026, with a public opening following at 10:30 a.m. at the Pettis County Commission. The contract will be awarded to the lowest responsive and responsible bidder, and all project materials are tax exempt. Eligible bidders must be on the MoDOT Qualified Contractor List and submit a contractor questionnaire at least seven days before the bid opening. A bid security deposit of five percent of the base bid is required, and bids cannot be withdrawn for thirty days following the opening. Requirements include adherence to federal or state prevailing wage rates and the completion of a 10-hour OSHA construction safety program by on-site employees within sixty days of starting work. Second-tier subcontracting is prohibited, and the DBE goal for this project is 0 percent.
General Info
Agency
NAICS
Place of Performance
Pettis County, MO, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Interested Companies (4)
See All 4 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
SEALED BIDS for construction of BRO-R083(030) Anderson School Road Bridge #2710013 over Spring Fork Replacement, Pettis County, Missouri will be received at 215 E. 5th Street, Sedalia Missouri 65301 until 10:00 a.m. prevailing local time, on the 15th day, of September, 2026, at the office of the Pettis County Clerk, and then publicly opened at 10:30 a.m. and read aloud at the Pettis County Commission, 415 S. Ohio Ave., Sedalia Missouri 65301.
The proposed work includes: Replacing BR#2710013 on Anderson School Road over Spring Fork with a new 121’-0” NU-Girder Bridge and associated roadway work.
Copies of plans and specifications can be seen or purchased for a Non-Refundable fee on-line at www.drexeltech.com in their eDistribution plan room, additional assistance is available at distribution@drexeltech.com. Information regarding this project can be found in the “Public Jobs” link on the website. Contractors desiring the Contract Documents for use in preparing bids may also obtain a set of such documents from Drexel Technologies; 10840 West 86th Street, Lenexa, KS 66214, telephone number is 913-371-4430. Bidding documents will be shipped only if the requesting party assumes responsibility for all related charges. Corporate, certified, or cashier’s checks shall be made payable to Drexel Technologies, Inc. Any questions regarding the project, plans, specifications, or bid documents should be directed to Mitch Gibler, EI., OWN, Inc., 8455 College Boulevard, Overland Park, Kansas 66210, at (816) 777-0400.
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher.
The Pettis County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2026 Edition, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project.
The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive any informalities or minor defects or to reject any or all bids and to re-advertise and to rebid. All materials for the project shall be tax exempt.
Each Bidder must deposit with his/her bid, security in the amount of five percent (5%) of his/her base bid which is subject to conditions provided in the Instructions to Bidders.
The DBE Goal for this project is 0 %.
No 2nd tier subcontracting will be allowed on this project.
No Bidder may withdraw his bid within thirty (30) consecutive calendar days after the actual date of the opening thereof.
Similar Contracts
Same NAICS industry code
