State Route 156 At The Alameda Eastbound Right-Hand Turn Lane Improvement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of San Juan Bautista is soliciting bids for the State Route 156 At The Alameda Eastbound Right-Hand Turn Lane Improvement Project under solicitation number 20260814029. This project requires the provision of all labor, materials, and equipment to construct an eastbound right-hand turn lane. Key technical requirements include mandatory lead soil sampling, the installation of a long-lead traffic signal pole, extensive earthwork, and the replacement of asphalt concrete dikes, concrete curbs, gutters, sidewalks, and curb ramps. Additional scope of work involves drainage improvements through the installation of concrete pipes and inlets, permanent erosion control, irrigation, and planting. The contractor is also responsible for traffic control systems, the removal and replacement of thermoplastic pavement markings involving hazardous waste removal, and the relocation of utility poles and roadside signs. All activities must adhere to Caltrans Standard Specifications and Plans. Responses are due by September 15, 2026.
General Info
Agency
NAICS
Place of Performance
San Juan Bautista, CA, 95045, USASet-Aside
Documents
(3)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
