Contractors are invited to bid on the Sladyk Wildlife Management Area (WMA) – Stream Crossing
Construction Projects for Buildings and General Services on behalf of the Agency of Natural Resources –
Department of Fish & Wildlife at VT Route 114 in Norton, Vermont.
This project consists of, but is not limited to:
This project consists of repairing 4 road-stream crossings that were damaged during the July 2023
and 2024 flooding events. Work will be in remote locations on the Bill Sladyk Wildlife
Management Area in Norton, VT. Each of the crossings will require removal of an existing,
damaged culvert or small bridge, site prep, installation of pre-fabricated concrete box culvert, and
site restoration. Storm water and erosion control measures shall be followed according to state and
federal regulatory standards. Project details are included in each set of plans.
Sealed Bids accompanied by proper Bid Security shall be emailed to the Department of Buildings and
General Services, at
contact@example.gov, until March 19, 2025 at 4:30 PM.
Documents may be obtained from Blueprints Etc, 20 Farrell Street, South Burlington VT 05403, by phone
at
+1 (555) 000-0000, by fax at
+1 (555) 000-0000 or email to:
contact@example.gov. Project Manuals and Plans
are available for preview at: http://www.blueprintsetc.com in the Public Plan Room. Any and all
notifications, releases and addendums associated with this project will be posted at
http://www.blueprintsetc.com. There is a non-refundable fee for each set of documents purchased.
Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $TBD
1. Please be advised that all notifications, releases, and addendums associated with this RFP
will be posted on-line in the plan room where the original solicitation resides unless
otherwise determined that a hard copy is necessary. The state will make no attempt to
contact contractors with updated information. It is the responsibility of each contractor to
periodically check the posting site for any and all notifications, releases and addendums
associated with the RFP.
2. NOTE: On occasion hard copy addendums may be required due to size or type of
media/requirements. If applicable and as determined by the Department of Buildings and
General Services, addendums that require hard copy distribution, a copy of such addenda will be
mailed or delivered for each set of plans and specifications issued to the bidders, prior to the bid
date. However, it is the responsibility of the bidder to be sure they have received all addenda and
must so state the number of addenda they have received on the proposal.
3. If Bidders choose to pull information from other third-party sites, Bidders’ do so at their own
risk as there is one official source of information for documents as indicated above.
There will be a mandatory Virtual Pre-Bid meeting on February 26, 2025 at 10:00 AM. All interested
bidders MUST pre-register for the conference by notifying the Office of Purchasing and Contracting (OPC)
at
contact@example.gov no later than 2:00 PM on February 24, 2025. Additionally, while a
site visit is not part of the conference, bidders are encouraged to conduct their own site visit.
Revision Date: 12/4/2024
Page | 2
QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP
or wishing to comment or take exception to any requirements of the RFP must submit specific questions
in writing to
contact@example.gov no later than 4:30 PM on March 5, 2025. All
questions should include Sladyk Wildlife Management Area (WMA) – Stream Crossing
Construction Projects in the subject line. Any comments, questions, or exceptions not raised in writing
on or before the last day of the question period are waived. At the close of the question period a copy of
all questions or comments and the State's responses will be posted at http://www.blueprintsetc.com.
Every effort will be made to post this information as soon as possible after the question period ends,
contingent on the number and complexity of the questions.
Bidder’s attention is directed to:
1. General Conditions for Construction Contracts. It is the Bidder’s responsibility to thoroughly
read and comply with all requirements. Please pay close attention due to changes that have been
made.
2. Funding Source:
This project is being funded, in whole or in part, through the FEMA and State of Vermont funds.
1. Placing qualified small and minority businesses and women’s business enterprises
on solicitation lists;
2. Assuring that small and minority businesses and women’s business enterprises are
solicited whenever they are potential sources;
3. Dividing total requirements, when economically feasible, into smaller tasks or
quantities to permit maximum participation by small and minority businesses, and
women’s business enterprises;
4. Establishing delivery schedules, where the requirement permits, which encourage
participation by small and minority businesses, and women’s business enterprises;
5. Using the services and assistance, as appropriate, of such organizations as the
Small Business Administration and the Minority Business Development Agency of the
Department of Commerce; and
6. Requiring the prime/general contractor, if subcontracts are to be let, to take the same
affirmative steps as listed in numbers 1 through 5.
If a bidder requires assistance in preparing their proposal, registering with SAM.gov or needs
guidance on socioeconomic certifications, the bidder may contact the Agency of Commerce &
Community Development (ACCD), Department of Economic Development (DED), APEX
Accelerator. The Vermont APEX Accelerator (formerly the Procurement Technical Assistance
Center (PTAC)) specializes in helping small businesses navigate the documentation associated
with State and Federal procurement. There is no cost to the Contractor for assistance provided by
APEX Accelerator. Their website is: https://accd.vermont.gov/economicdevelopment/
programs/ptac
3. BYRD ANTI-LOBBYING CERTIFICATION - The following provision is applicable to the
Contractor for contracts over $100,000.00, and Contractor shall include this clause in all its subcontracts
over $100,000.00.
Contractor has provided the certification required by the Byrd Anti-Lobbying Amendment, 31
U.S.C. § 1352 (as amended, and will follow the requirements for certification of each lower tier
Revision Date: 12/4/2024
Page | 3
(subcontract) to disclose any lobbying with non-federal funds that takes place in connection with
obtaining any federal award. Such disclosures will be forwarded from tier to tier up to the
Contractor who in turn will forward the certification(s) to the federal awarding agency.
4. DOMESTIC PREFERENCE FOR PROCUREMENTS
As appropriate, and to the extent consistent with law, the contractor should, to the greatest extent
practicable, provide a preference for the purchase, acquisition, or use of goods, products, or
materials produced in the United States. This includes, but is not limited to iron, aluminum, steel,
cement, and other manufactured products. For purposes of this clause: Produced in the United
States means, for iron and steel products, that all manufacturing processes, from the initial
melting stage through the application of coatings, occurred in the United States. Manufactured
products mean items and construction materials composed in whole or in part of non-ferrous
metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe;
aggregates such as concrete; glass, including optical fiber; and lumber.”
5. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS: The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3, 2022, the purchase
of Russian-sourced goods and goods produced by Russian entities (defined as institutions or
companies that are headquartered in Russia or have their principal place of business in Russia) is
prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of the Contract awarding process. This certification is required for all
subcontracts for work performed solely for the State of Vermont and subcontracts for work
performed in the State of Vermont.
6. DETAILED REQUIREMENTS:
6.1. Responsibilities for this contract shall include but are not limited to repairing four (4) roadstream
crossings that were damaged by the July 2023 and 2004 flooding events. Work will
be in remote locations on the Bill Sladyk Wildlife Management Area in Norton, VT. Each
of the crossings will require removal of an existing, damaged culvert or small bridge, site
prep, installation of pre-fabricated concrete box culvert, and site restoration. Storm water
and erosion control measures shall be followed according to state and federal regulatory
standards and any permits issued for this project. Specific project details are included in
each set of plans along with Supplemental General Conditions detailed below.
6.2. The Contractor will be required to provide all equipment, fuel, and labor necessary to
complete this project as detailed in this solicitation. All equipment used must be in good
operating condition and free of dirt and debris that may transport invasive plant or seed
material.
6.3. Contract will only be awarded to one contractor and they must bid on all four (4) sites to be
considered a complete and qualified bid.
6.4. Supplemental General Conditions
a. Unless defined otherwise herein, Work will be performed in accordance with the
Vermont Agency of Transportation 2024 Standard Specifications for Construction, as
modified. The specifications are available on the Vermont Agency of Transportation
website. Work will be paid based on the Items provided on the Bid Sheet. All items are
considered included in the Bid Sheet and the contractor shall consider the items sufficient
Revision Date: 12/4/2024
Page | 4
to complete the Work. https://vtrans.vermont.gov/highway/construct-material/constructservices/
pre-contractspecifications/vermont/2024
b. The 11th edition, dated December 2023, of the Manual on Uniform Traffic Control
Devices for Streets and Highway shall apply to this project.
c. Tree cutting may commence upon notice of award and comply with Army Corps of
Engineers Northern Long-eared bat permit requirements.
d. All in-stream work shall be performed between July 1, 2025, and October 1, 2025.
e. The Vermont Department of Fish and Wildlife will coordinate the road closures to
perform the work. The Contractor will be responsible for adequate traffic control and
protection for the immediate work zone. This shall include signage, type III barricades,
jersey barrier, etc.
f. A pre-construction meeting shall be held at least 10 days prior to mobilization to the site
with the State of Vermont, Department of Fish & Wildlife, the Engineer, and the ANR
Rivers Management Engineer.
g. Work Hours: Work shall be completed during daylight hours unless approved otherwise
in writing by the Owner. Night work is not anticipated for this project but may be
allowed if deemed necessary during the excavation and setting of the structure(s).
h. The Road Closure Periods:
Site 1 = 20 consecutive calendar days
Site 2 = 15 consecutive calendar days
Site 3 = 15 consecutive calendar days
Site 4 = 15 consecutive calendar days
For each day outside of the allowable road closure period the contractor requires the road
to be closed, liquidated damages in the amount of Table 108.12A per day shall apply.
i. The contractor shall have a maximum of 80 consecutive calendar days to complete the
work at Site 1, Site 2, Site 3, and Site 4 from the commencement of earth disturbing
activities at any of the three sites to final stabilization and demobilization at all three sites
(i.e. all project work must be complete within 80 days from the commencement of
contract work). For each day outside of the 80 days the contractor will be responsible for
liquidated damages in the amount determined by Table 108.12A per day necessary to
achieve final stabilization. Achieving final grass growth of 70% and removal of
necessary EPSC measures does not apply to this time frame.
j. The Department of Fish & Wildlife reserves the right to reduce or remove liquidated
damages due to unforeseen conditions and delays due to weather. It is preferred this work
not be completed during inclement weather as determined by the Owner/Engineer.
k. Substantial completion will be on or before October 1, 2025.
l. Final completion and project closeout will be on or before October 15, 2025.
m. Bids shall be balanced for the purposes of review & acceptance. Unbalanced bids will not
be considered.
Revision Date: 12/4/2024
Page | 5
n. In the event of conflicting information, FEMA Contract Requirements take precedence.
o. Erosion Prevention and Sediment Control shall be installed in accordance with the most
current version of the Low Risk Site Handbook. Total earth disturbance associated with
all four sites is less than 1.0 acres and the project is therefore considered nonjurisdictional
with respect to Vermont Construction General Permit 3-9020. The
Contractor shall develop an Erosion Prevention and Sediment Control Plan in
Accordance with Section 653 for each of the three sites.
p. For each of the four sites, the Contractor shall develop a Stream Relocation plan in
accordance with Section 614 and any permit conditions for the project for review and
approval by the Engineer and VT ANR Rivers Management Engineer. The plan shall be
stamped by a licensed professional engineer registered in the State of Vermont. The
Contractor is responsible for determining the level of protection required to protect their
work.
q. The Contractor shall be aware of Vermont Water Quality Standards and shall conform to
all such standards. Release of turbid water (water greater than 25 NTU’s) is not
permissible under these standards.
r. The Contractor shall provide two sieve analysis and modified proctor results for each
granular material to be used. Material sources shall be approved prior to brining on site.
s. Contractor will not be responsible for in-place soils testing. All in-place testing will be
the responsibility of the Owner.
t. Provide submittals and shop drawings for all materials and structures prior to purchase. If
materials are on VTrans pre-approved products list, please reference.
u. All traffic control and traffic control devices shall conform to TCD
Standards. The Contractor shall provide a traffic control plan designed in accordance
with Section 641 stamped by a licensed professional engineer registered in the State of
Vermont for review and approval. The contractor shall provide and install all road closure
signage to be coordinated with Vermont Fish & Wildlife.
v. The Contractor shall be aware that the sites are generally remote (especially Site 1) and
additional handling of materials and the precast structure may be necessary. Any costs
associated with site access to perform the work is the responsibility of the contractor.
6.5. Supplemental Information on Bid Items:
a. 203.1500 Common Excavation (Modified). This bid item has been modified to be Lump
Sum for all excavation and disposal of excess excavation & unsuitable materials to
complete the work. It is intended that all excavation to complete the work as detailed is
included in this Lump Sum item with the exception of 203.2600 Channel Excavation of
Rock. Any unforeseen excavation work necessary within the channel will be
compensated for under 203.2700 Unclassified Channel Excavation.
b. 204.3000 Granular Borrow will only be utilized if excavation removed is not suitable for
reuse on the site as determined by the Engineer.
Revision Date: 12/4/2024
Page | 6
c. 541.2200 Concrete, Class B (Modified) shall include the reinforcing steel and all other
requirements necessary to provide a 6” thick reinforced slab as show in the unit price.
d. 613.0601, 613.0602, 613.0603. The intent of these bid items is to closely replicate the
existing material on site within the natural stream bottom. Blasted angular rock will
generally not be accepted.
e. 613.0603 E-Stone Fill, Type III (Modified) – Stone Step Weirs. The intent of this bid
item is to provide and install stone stepped weirs as field directed to provide stepped
pools within the stream bed in lieu of a continuous flat slope. The stone provided shall
meet the E-Stone Fill, Type III specification.
f. 653.0300 Maintenance of EPSC Plan (N.A.B.I) Modified. This bid item has been
modified to Lump Sum. The allowance will be paid to the Contractor for a predetermined
value of EPSC maintenance. Any additional EPSC maintenance will be the responsibility
of the Contractor and considered incidental to other EPSC related bid items.
g. 900.0100 – Contractor to provide & install 704.02D 1.5” Crushed Stone as detailed.
h. 900.0200 – Contractor to provide & install 704.02C ¾” Crushed Stone as detailed.
i. 900.0300 – Contractor to install stone lined drainage swales as detailed and field
coordinated.
j. 900.0400 – Contractor to provide and install 1” rigid insulation over the top of the box
culvert as detailed.
k. 900.0500 – Contractor to provide & install safety boulders that are approximately
3’x4’x2.5’ minimum dimensions. Boulders may be selected by Owner prior to shipping
to site.
7. BID SUBMISSION INSTRUCTIONS:
a. CLOSING DATE: Bids must be received by the State by the due date specified on the front
page of this RFP. Late bids will not be considered.
i. The State may, for cause, issue an addendum to change the date and/or time when bids
are due. If a change is made, the State will inform all bidders by posting at the webpage
indicated on the front page of this RFP.
ii. There will not be a public bid opening. However, the State will record the name, city
and state for any and all bids received by the due date.
b. BID DELIVERY INSTRUCTIONS:
i. ELECTRONIC: Electronic bids will be accepted.
ii. E-MAIL BIDS. Emailed bids will be accepted. Bids will be accepted via email
submission to
contact@example.gov. Bids must consist of a single email with a
single, digitally searchable PDF attachment containing all components of the bid.
Revision Date: 12/4/2024
Page | 7
Multiple emails and/or multiple attachments will not be accepted. There is an
attachment size limit of 40 MB. It is the Bidder’s responsibility to compress the PDF
file containing its bid, if necessary, in order to meet this size limitation. It is also the
Bidder's responsibility to ensure that their own email system can send and receive
messages up to this size.
iii. FAX BIDS: Faxed bids will not be accepted.
iv. PAPER BIDS: Paper format bids will not be accepted.
8. Full Bonding is required for this job.
9. CONSTRUCTION CONTRACTOR EVALUATION FORM: The Department of Buildings and
General Services (BGS) may require contractor evaluations on construction projects over $100,000 or
at the discretion of the BGS Director. Evaluations will be used to compile contractor’s performance
on BGS projects to provide a history and assessment of the contractor’s performance.
10. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and
requirements of this bid solicitation.Contractors are invited to bid on the Sladyk Wildlife Management Area (WMA) – Stream Crossing
Construction Projects for Buildings and General Services on behalf of the Agency of Natural Resources –
Department of Fish & Wildlife at VT Route 114 in Norton, Vermont.
This project consists of, but is not limited to:
This project consists of repairing 4 road-stream crossings that were damaged during the July 2023
and 2024 flooding events. Work will be in remote locations on the Bill Sladyk Wildlife
Management Area in Norton, VT. Each of the crossings will require removal of an existing,
damaged culvert or small bridge, site prep, installation of pre-fabricated concrete box culvert, and
site restoration. Storm water and erosion control measures shall be followed according to state and
federal regulatory standards. Project details are included in each set of plans.
Sealed Bids accompanied by proper Bid Security shall be emailed to the Department of Buildings and
General Services, at
contact@example.gov, until March 19, 2025 at 4:30 PM.
Documents may be obtained from Blueprints Etc, 20 Farrell Street, South Burlington VT 05403, by phone
at
+1 (555) 000-0000, by fax at
+1 (555) 000-0000 or email to:
contact@example.gov. Project Manuals and Plans
are available for preview at: http://www.blueprintsetc.com in the Public Plan Room. Any and all
notifications, releases and addendums associated with this project will be posted at
http://www.blueprintsetc.com. There is a non-refundable fee for each set of documents purchased.
Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $TBD
1. Please be advised that all notifications, releases, and addendums associated with this RFP
will be posted on-line in the plan room where the original solicitation resides unless
otherwise determined that a hard copy is necessary. The state will make no attempt to
contact contractors with updated information. It is the responsibility of each contractor to
periodically check the posting site for any and all notifications, releases and addendums
associated with the RFP.
2. NOTE: On occasion hard copy addendums may be required due to size or type of
media/requirements. If applicable and as determined by the Department of Buildings and
General Services, addendums that require hard copy distribution, a copy of such addenda will be
mailed or delivered for each set of plans and specifications issued to the bidders, prior to the bid
date. However, it is the responsibility of the bidder to be sure they have received all addenda and
must so state the number of addenda they have received on the proposal.
3. If Bidders choose to pull information from other third-party sites, Bidders’ do so at their own
risk as there is one official source of information for documents as indicated above.
There will be a mandatory Virtual Pre-Bid meeting on February 26, 2025 at 10:00 AM. All interested
bidders MUST pre-register for the conference by notifying the Office of Purchasing and Contracting (OPC)
at
contact@example.gov no later than 2:00 PM on February 24, 2025. Additionally, while a
site visit is not part of the conference, bidders are encouraged to conduct their own site visit.
Revision Date: 12/4/2024
Page | 2
QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP
or wishing to comment or take exception to any requirements of the RFP must submit specific questions
in writing to
contact@example.gov no later than 4:30 PM on March 5, 2025. All
questions should include Sladyk Wildlife Management Area (WMA) – Stream Crossing
Construction Projects in the subject line. Any comments, questions, or exceptions not raised in writing
on or before the last day of the question period are waived. At the close of the question period a copy of
all questions or comments and the State's responses will be posted at http://www.blueprintsetc.com.
Every effort will be made to post this information as soon as possible after the question period ends,
contingent on the number and complexity of the questions.
Bidder’s attention is directed to:
1. General Conditions for Construction Contracts. It is the Bidder’s responsibility to thoroughly
read and comply with all requirements. Please pay close attention due to changes that have been
made.
2. Funding Source:
This project is being funded, in whole or in part, through the FEMA and State of Vermont funds.
1. Placing qualified small and minority businesses and women’s business enterprises
on solicitation lists;
2. Assuring that small and minority businesses and women’s business enterprises are
solicited whenever they are potential sources;
3. Dividing total requirements, when economically feasible, into smaller tasks or
quantities to permit maximum participation by small and minority businesses, and
women’s business enterprises;
4. Establishing delivery schedules, where the requirement permits, which encourage
participation by small and minority businesses, and women’s business enterprises;
5. Using the services and assistance, as appropriate, of such organizations as the
Small Business Administration and the Minority Business Development Agency of the
Department of Commerce; and
6. Requiring the prime/general contractor, if subcontracts are to be let, to take the same
affirmative steps as listed in numbers 1 through 5.
If a bidder requires assistance in preparing their proposal, registering with SAM.gov or needs
guidance on socioeconomic certifications, the bidder may contact the Agency of Commerce &
Community Development (ACCD), Department of Economic Development (DED), APEX
Accelerator. The Vermont APEX Accelerator (formerly the Procurement Technical Assistance
Center (PTAC)) specializes in helping small businesses navigate the documentation associated
with State and Federal procurement. There is no cost to the Contractor for assistance provided by
APEX Accelerator. Their website is: https://accd.vermont.gov/economicdevelopment/
programs/ptac
3. BYRD ANTI-LOBBYING CERTIFICATION - The following provision is applicable to the
Contractor for contracts over $100,000.00, and Contractor shall include this clause in all its subcontracts
over $100,000.00.
Contractor has provided the certification required by the Byrd Anti-Lobbying Amendment, 31
U.S.C. § 1352 (as amended, and will follow the requirements for certification of each lower tier
Revision Date: 12/4/2024
Page | 3
(subcontract) to disclose any lobbying with non-federal funds that takes place in connection with
obtaining any federal award. Such disclosures will be forwarded from tier to tier up to the
Contractor who in turn will forward the certification(s) to the federal awarding agency.
4. DOMESTIC PREFERENCE FOR PROCUREMENTS
As appropriate, and to the extent consistent with law, the contractor should, to the greatest extent
practicable, provide a preference for the purchase, acquisition, or use of goods, products, or
materials produced in the United States. This includes, but is not limited to iron, aluminum, steel,
cement, and other manufactured products. For purposes of this clause: Produced in the United
States means, for iron and steel products, that all manufacturing processes, from the initial
melting stage through the application of coatings, occurred in the United States. Manufactured
products mean items and construction materials composed in whole or in part of non-ferrous
metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe;
aggregates such as concrete; glass, including optical fiber; and lumber.”
5. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS: The Contractor is hereby
notified that, pursuant to Vermont Executive Order No. 02-22, dated March 3, 2022, the purchase
of Russian-sourced goods and goods produced by Russian entities (defined as institutions or
companies that are headquartered in Russia or have their principal place of business in Russia) is
prohibited. The awarded Contractor must fill out and sign the Executive Order 02-22 Vendor
Certification as part of the Contract awarding process. This certification is required for all
subcontracts for work performed solely for the State of Vermont and subcontracts for work
performed in the State of Vermont.
6. DETAILED REQUIREMENTS:
6.1. Responsibilities for this contract shall include but are not limited to repairing four (4) roadstream
crossings that were damaged by the July 2023 and 2004 flooding events. Work will
be in remote locations on the Bill Sladyk Wildlife Management Area in Norton, VT. Each
of the crossings will require removal of an existing, damaged culvert or small bridge, site
prep, installation of pre-fabricated concrete box culvert, and site restoration. Storm water
and erosion control measures shall be followed according to state and federal regulatory
standards and any permits issued for this project. Specific project details are included in
each set of plans along with Supplemental General Conditions detailed below.
6.2. The Contractor will be required to provide all equipment, fuel, and labor necessary to
complete this project as detailed in this solicitation. All equipment used must be in good
operating condition and free of dirt and debris that may transport invasive plant or seed
material.
6.3. Contract will only be awarded to one contractor and they must bid on all four (4) sites to be
considered a complete and qualified bid.
6.4. Supplemental General Conditions
a. Unless defined otherwise herein, Work will be performed in accordance with the
Vermont Agency of Transportation 2024 Standard Specifications for Construction, as
modified. The specifications are available on the Vermont Agency of Transportation
website. Work will be paid based on the Items provided on the Bid Sheet. All items are
considered included in the Bid Sheet and the contractor shall consider the items sufficient
Revision Date: 12/4/2024
Page | 4
to complete the Work. https://vtrans.vermont.gov/highway/construct-material/constructservices/
pre-contractspecifications/vermont/2024
b. The 11th edition, dated December 2023, of the Manual on Uniform Traffic Control
Devices for Streets and Highway shall apply to this project.
c. Tree cutting may commence upon notice of award and comply with Army Corps of
Engineers Northern Long-eared bat permit requirements.
d. All in-stream work shall be performed between July 1, 2025, and October 1, 2025.
e. The Vermont Department of Fish and Wildlife will coordinate the road closures to
perform the work. The Contractor will be responsible for adequate traffic control and
protection for the immediate work zone. This shall include signage, type III barricades,
jersey barrier, etc.
f. A pre-construction meeting shall be held at least 10 days prior to mobilization to the site
with the State of Vermont, Department of Fish & Wildlife, the Engineer, and the ANR
Rivers Management Engineer.
g. Work Hours: Work shall be completed during daylight hours unless approved otherwise
in writing by the Owner. Night work is not anticipated for this project but may be
allowed if deemed necessary during the excavation and setting of the structure(s).
h. The Road Closure Periods:
Site 1 = 20 consecutive calendar days
Site 2 = 15 consecutive calendar days
Site 3 = 15 consecutive calendar days
Site 4 = 15 consecutive calendar days
For each day outside of the allowable road closure period the contractor requires the road
to be closed, liquidated damages in the amount of Table 108.12A per day shall apply.
i. The contractor shall have a maximum of 80 consecutive calendar days to complete the
work at Site 1, Site 2, Site 3, and Site 4 from the commencement of earth disturbing
activities at any of the three sites to final stabilization and demobilization at all three sites
(i.e. all project work must be complete within 80 days from the commencement of
contract work). For each day outside of the 80 days the contractor will be responsible for
liquidated damages in the amount determined by Table 108.12A per day necessary to
achieve final stabilization. Achieving final grass growth of 70% and removal of
necessary EPSC measures does not apply to this time frame.
j. The Department of Fish & Wildlife reserves the right to reduce or remove liquidated
damages due to unforeseen conditions and delays due to weather. It is preferred this work
not be completed during inclement weather as determined by the Owner/Engineer.
k. Substantial completion will be on or before October 1, 2025.
l. Final completion and project closeout will be on or before October 15, 2025.
m. Bids shall be balanced for the purposes of review & acceptance. Unbalanced bids will not
be considered.
Revision Date: 12/4/2024
Page | 5
n. In the event of conflicting information, FEMA Contract Requirements take precedence.
o. Erosion Prevention and Sediment Control shall be installed in accordance with the most
current version of the Low Risk Site Handbook. Total earth disturbance associated with
all four sites is less than 1.0 acres and the project is therefore considered nonjurisdictional
with respect to Vermont Construction General Permit 3-9020. The
Contractor shall develop an Erosion Prevention and Sediment Control Plan in
Accordance with Section 653 for each of the three sites.
p. For each of the four sites, the Contractor shall develop a Stream Relocation plan in
accordance with Section 614 and any permit conditions for the project for review and
approval by the Engineer and VT ANR Rivers Management Engineer. The plan shall be
stamped by a licensed professional engineer registered in the State of Vermont. The
Contractor is responsible for determining the level of protection required to protect their
work.
q. The Contractor shall be aware of Vermont Water Quality Standards and shall conform to
all such standards. Release of turbid water (water greater than 25 NTU’s) is not
permissible under these standards.
r. The Contractor shall provide two sieve analysis and modified proctor results for each
granular material to be used. Material sources shall be approved prior to brining on site.
s. Contractor will not be responsible for in-place soils testing. All in-place testing will be
the responsibility of the Owner.
t. Provide submittals and shop drawings for all materials and structures prior to purchase. If
materials are on VTrans pre-approved products list, please reference.
u. All traffic control and traffic control devices shall conform to TCD
Standards. The Contractor shall provide a traffic control plan designed in accordance
with Section 641 stamped by a licensed professional engineer registered in the State of
Vermont for review and approval. The contractor shall provide and install all road closure
signage to be coordinated with Vermont Fish & Wildlife.
v. The Contractor shall be aware that the sites are generally remote (especially Site 1) and
additional handling of materials and the precast structure may be necessary. Any costs
associated with site access to perform the work is the responsibility of the contractor.
6.5. Supplemental Information on Bid Items:
a. 203.1500 Common Excavation (Modified). This bid item has been modified to be Lump
Sum for all excavation and disposal of excess excavation & unsuitable materials to
complete the work. It is intended that all excavation to complete the work as detailed is
included in this Lump Sum item with the exception of 203.2600 Channel Excavation of
Rock. Any unforeseen excavation work necessary within the channel will be
compensated for under 203.2700 Unclassified Channel Excavation.
b. 204.3000 Granular Borrow will only be utilized if excavation removed is not suitable for
reuse on the site as determined by the Engineer.
Revision Date: 12/4/2024
Page | 6
c. 541.2200 Concrete, Class B (Modified) shall include the reinforcing steel and all other
requirements necessary to provide a 6” thick reinforced slab as show in the unit price.
d. 613.0601, 613.0602, 613.0603. The intent of these bid items is to closely replicate the
existing material on site within the natural stream bottom. Blasted angular rock will
generally not be accepted.
e. 613.0603 E-Stone Fill, Type III (Modified) – Stone Step Weirs. The intent of this bid
item is to provide and install stone stepped weirs as field directed to provide stepped
pools within the stream bed in lieu of a continuous flat slope. The stone provided shall
meet the E-Stone Fill, Type III specification.
f. 653.0300 Maintenance of EPSC Plan (N.A.B.I) Modified. This bid item has been
modified to Lump Sum. The allowance will be paid to the Contractor for a predetermined
value of EPSC maintenance. Any additional EPSC maintenance will be the responsibility
of the Contractor and considered incidental to other EPSC related bid items.
g. 900.0100 – Contractor to provide & install 704.02D 1.5” Crushed Stone as detailed.
h. 900.0200 – Contractor to provide & install 704.02C ¾” Crushed Stone as detailed.
i. 900.0300 – Contractor to install stone lined drainage swales as detailed and field
coordinated.
j. 900.0400 – Contractor to provide and install 1” rigid insulation over the top of the box
culvert as detailed.
k. 900.0500 – Contractor to provide & install safety boulders that are approximately
3’x4’x2.5’ minimum dimensions. Boulders may be selected by Owner prior to shipping
to site.
7. BID SUBMISSION INSTRUCTIONS:
a. CLOSING DATE: Bids must be received by the State by the due date specified on the front
page of this RFP. Late bids will not be considered.
i. The State may, for cause, issue an addendum to change the date and/or time when bids
are due. If a change is made, the State will inform all bidders by posting at the webpage
indicated on the front page of this RFP.
ii. There will not be a public bid opening. However, the State will record the name, city
and state for any and all bids received by the due date.
b. BID DELIVERY INSTRUCTIONS:
i. ELECTRONIC: Electronic bids will be accepted.
ii. E-MAIL BIDS. Emailed bids will be accepted. Bids will be accepted via email
submission to
contact@example.gov. Bids must consist of a single email with a
single, digitally searchable PDF attachment containing all components of the bid.
Revision Date: 12/4/2024
Page | 7
Multiple emails and/or multiple attachments will not be accepted. There is an
attachment size limit of 40 MB. It is the Bidder’s responsibility to compress the PDF
file containing its bid, if necessary, in order to meet this size limitation. It is also the
Bidder's responsibility to ensure that their own email system can send and receive
messages up to this size.
iii. FAX BIDS: Faxed bids will not be accepted.
iv. PAPER BIDS: Paper format bids will not be accepted.
8. Full Bonding is required for this job.
9. CONSTRUCTION CONTRACTOR EVALUATION FORM: The Department of Buildings and
General Services (BGS) may require contractor evaluations on construction projects over $100,000 or
at the discretion of the BGS Director. Evaluations will be used to compile contractor’s performance
on BGS projects to provide a history and assessment of the contractor’s performance.
10. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and
requirements of this bid solicitation.