Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Antelope Siphon Blowoff, Contract No. 2026-04

Closed
2026-04State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC piping ranging from 6 to 30 inches and Ductile Iron Pipe (DIP) in 18 and 24-inch diameters. Key deliverables include the construction of standard manholes up to 72 inches, doghouse manholes up to 84 inches, and 24-inch DIP sewer trenchless crossings with associated launch and receiving shafts. Additional requirements encompass a CSO regulator fit out, outfall work, and the abandonment of existing pipes and manholes. Supporting site activities include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), clearing and grubbing of 5,130 square yards of wooded areas, and subsequent seeding and fine grading. The project also requires geotechnical instrumentation and monitoring, maintenance of flows and bypass, and specific railroad insurance. Point of contact for this opportunity is John Connelly at [email hidden].
Cleary Construction, Inc.

POSTED

44 minutes ago

DEADLINE

in 26 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on socioeconomic compliance through required Minority and Women-Owned Business Enterprise documentation. Bidders must provide a Good Faith Efforts Form and Table A to be considered responsive. The project is governed by EJCDC standard general and supplementary conditions, requiring both performance and payment bonds from sureties with an A.M. Best rating of A-VII or better. Performance begins upon a written Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Final acceptance is contingent upon the Engineer's determination of substantial completion and the resolution of a final punch list.
Don Moorhead Construction, Inc.

POSTED

44 minutes ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Contract No. 2026-04, titled Antelope Siphon Blowoff, is a solicitation by the Placer County Water Agency for the construction of a blowoff pipeline and detention system in Auburn, California. The project aims to control the flow of water and debris at a low point in the Antelope Canal Siphon crossing Sierra College Blvd. The scope of work includes removing an existing 6-inch blowoff pipe and valve, installing approximately 150 linear feet of 12-inch PVC C900 pipe, and installing a new 12-inch valve. Additional requirements include traffic control during construction and subsequent pavement restoration. The project is governed by plans and specifications prepared by Domenichelli & Associates. The contract will be awarded to the lowest responsive and responsible qualified bidder. Bidders must provide a bid guaranty of at least 10 percent of the total bid and, upon award, furnish both faithful performance and payment bonds for 100 percent of the contract price. Required certifications include a non-collusion declaration, a California contractor's license, DIR registration, and compliance with the Iran Contracting Act and drug-free workplace standards. Work must commence within ten days of the Notice to Proceed, with a detailed schedule submitted within the same timeframe. Payments are based on certified monthly estimates for installed equipment, labor, and materials, with a payment term of 30 days following the receipt of undisputed requests. All project communications are routed through the Construction Manager, Nick Austin, PE.

General Info

Replace 6-inch blowoff pipe with 150 feet of 12-inch PVC C900 at Antelope Canal Siphon, include valve, traffic control, and pavement restoration.

Documents

3
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Placer County Water Agency
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Project Description: In accordance with plans and specifications prepared by Domenichelli & Associates, the Work includes furnishing of all labor, materials, tax, equipment and services for the construction of a blowoff pipeline to control the flow of water and debris from a low point in the Antelope Canal Siphon crossing Sierra College Blvd. The Work consists of removing the existing 6-inch blowoff pipe and valve and installing approximately one hundred and fifty (150) linear feet of 12-inch PVC C900 pipe and a new 12-inch valve. The project will require traffic control during construction and pavement restoration.

More opportunities from California → Placer County Water Agency

Same awarding agency

NAICS: 237990
SLED
On-Call Canal Gunite Installation
Solicitation # 2026-07
Solicitation 2026-07 is an on-call contract issued by the Placer County Water Agency for the installation of canal gunite throughout Placer County, specifically within Zones 1 and 3. The scope of work requires the contractor to provide all labor, materials, equipment, and services to furnish, mix, and place gunite using a dry-mix process in accordance with ASTM C33 standards. The contract has an estimated maximum value of 2,000,000 dollars and a performance period running through December 31, 2027, with a sole option for the agency to extend the term through December 2028. Payment is based on the cubic yardage of gunite measured in place, with undisputed progress payments issued within 30 days of receipt. The contract will be awarded to the lowest responsive and responsible bidder. To qualify, bidders must provide evidence of a valid California Contractor's License and DIR registration, as well as a record of integrity and successful project completion. Mandatory experience requirements include listing three to six qualifying dry-mix process gunite projects completed since 2020, at least two of which must be public works projects contracted directly with a public entity. Bidders must also submit a non-collusion affidavit, a drug-free workplace certification, and compliance documentation for the California Air Resources Board. Successful awardees are required to provide faithful performance and payment bonds, each for 100 percent of the contract price. The project is subject to prevailing wage requirements per California Senate Bill 854 and must comply with the Americans with Disabilities Act. Bids must be submitted in sealed envelopes to the Placer County Water Agency Engineering Division in Auburn, California, by 3:30 P.M. local time on November 5, 2026.
Other Heavy and Civil Engineering Construction

POSTED

17 days ago

DEADLINE

in 10 days
View Details
NAICS: 237990
SLED
Indian Bar River Access Project (Lake and Streambed Alteration Agreement EPIMS Notification No. PLA-18568-R2)
Solicitation # PLA-65968-R2
The California Department of Fish and Wildlife has executed Lake Alteration Agreement EPIMS Notification Number PLA-64574-R2, pursuant to section 1602 of the Fish and Game Code, for the Indian Bar River Access Project. Located at Hell Hole Reservoir in Placer County, California, the project is managed by the Placer County Water Agency and project proponent Ben Ransom. The scope of work is limited to replacing the existing concrete boat ramp using a similar alignment and constructing a new concrete extension approximately 262 feet long and 20 feet wide. This extension will reach an elevation of 4,505 feet, which is 25 vertical feet lower than the current ramp bottom elevation of 4,530 feet. To ensure environmental protection and regulatory compliance, all construction activities must be performed in dry conditions when water surface elevations are at or below 4,500 feet. The project has undergone review under the California Environmental Quality Act, and the California Department of Fish and Wildlife has determined that the work will not have significant environmental effects within its jurisdiction. Approval was granted contingent upon the adoption of specific mitigation measures and a monitoring plan to ensure environmental safeguards are maintained throughout the project's execution.
Other Heavy and Civil Engineering Construction

POSTED

about 1 month ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS