This Solicitation opportunity from California was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Architectural And Engineering Design Services For Malibu Campus Plan – Phase 3B New High School Physical Education Center & Site Access Ramp

Closed
20260716008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
Public Safety Building Space Needs Assessment and Renovations
Solicitation # RFP27-009
Glynn County, Georgia, has issued Request for Proposal RFP27-009 seeking a qualified architectural and planning firm to conduct a comprehensive Space Needs Assessment for the Police Department and provide design services for the renovation of the facility's second floor. The project is divided into two primary phases: an initial assessment to evaluate existing conditions, staffing, and security requirements, followed by the development of construction documents, engineering plans, and cost estimates specifically for the second-floor renovation. The selected consultant must ensure all designs adhere to accessibility, life safety, and law enforcement-specific security and access control standards. Proposals must be submitted electronically via the County's eProcurement portal by November 12, 2026, at 1:30 pm, consisting of a separate technical proposal and fee proposal. Evaluation is based on a weighted system focusing on professional qualifications (25%), project manager and team experience (25%), cost (18%), understanding of project scope (15%), firm reputation (15%), and local preference (2%). Required documentation includes a representation affidavit, Georgia Security and Immigration affidavits, and proof of ADA compliance. The successful contractor must maintain general liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, as well as 1 million dollars in automobile insurance and workers compensation. The contract requires adherence to the Georgia Security and Immigration Compliance Act and the implementation of equal employment opportunity policies. Payments are processed within 30 days following the validation of applications for payment by the contract administrator. A site visit for the second floor of the Glynn County Police Department is scheduled for October 23, 2026.
PROCUREMENT

POSTED

about 17 hours ago

DEADLINE

in 22 days
NAICS: 541310
New
SLED
ARCHITECTURAL AND ENGINEERING DESIGN SERVICES
Solicitation # 25-R09
The Stanislaus Council of Governments (StanCOG) is soliciting proposals for architectural and engineering design services to modify its facility at 1407 I Street in Modesto, California. The primary objective is to convert a former bank teller area into a boardroom and meeting chamber capable of accommodating a 16-member board, agency staff, and the public, featuring a dais for 17 members, a speaker's podium, and provisions for acoustic separation and Spanish-language interpretation. A secondary objective involves remodeling the agency's new office space. The project encompasses a full design lifecycle, including programming, schematic design, construction documents, bidding, and construction administration. Selection will be based on demonstrated competence and professional qualifications in accordance with California Government Code section 4525 et seq. Proposers must be registered in SAM.gov and eligible to receive federal funds, adhering to 2 CFR Part 200, FTA Circular 42201.G, and Title 49 CFR Part 29 regarding debarment and suspension. The contract requires compliance with California Labor Code Section 1775 for prevailing wage rates and mandates adherence to the Americans with Disabilities Act and DOT non-discrimination provisions. Submissions must include a technical proposal limited to 30 pages and a separate cost proposal featuring fixed fees for each phase. Payment is processed monthly within 30 calendar days of receiving an acceptable invoice.
Project Delivery

POSTED

1 day ago

DEADLINE

in 17 days
NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Utah

POSTED

1 day ago

DEADLINE

in 10 days
NAICS: 541310
New
SLED
Architectural and Engineering Design Services — Rec Center Locker Room Renovation
Solicitation # 26-082-RFP
The City of West Sacramento is soliciting proposals for architectural and engineering design services to renovate approximately 3,378 square feet of locker room facilities at the West Sacramento Recreation Center. The project, identified as CIP-60022, aims to replace deteriorated flooring, grout, and ventilation with a modern, functional design across the women's, men's, and family locker suites. The work is structured into three fiscal year phases: Phase 1 focuses on plumbing and floor/wall finishes, Phase 2 addresses ventilation, and Phase 3 covers lockers and benches. A critical requirement is the development of a construction phasing plan that allows the facility to remain in continuous public operation. The selected consultant will serve as the design professional of record, responsible for producing coordinated construction documents and 3D renderings at 30, 65, and 95 percent milestones. Key regulatory requirements include compliance with the 2010 ADA Standards for Accessible Design and the 2022 California codes, with the Division of the State Architect serving as the authority having jurisdiction. Proposals are due by December 4, 2026, and will be evaluated based on proven ability, cost-effectiveness, qualifications, and acceptance of the City's standard contract. The contract incorporates federal award provisions, including certifications regarding debarment, suspension, and the Byrd Anti-Lobbying Amendment for awards exceeding 100,000 dollars.
Capital Projects - Construction

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract pertains to comprehensive architectural and engineering design services for Phase 3B of the Malibu Campus Plan, focused on constructing a new 18,800-square-foot High School Physical Education Center to replace the existing upper gym, designated as Building J. The new facility will include locker and shower rooms, coach and staff offices, a training and treatment room, team locker rooms, a dance yoga fitness room, and a weight room, alongside a newly constructed entry lobby called the Hall of Champions with restrooms, concessions, and a ticket booth. The project also requires design of a replacement vehicle access ramp. All work must comply with Collaborative for High Performance Schools standards enhanced by 25%, and obtain approvals from the California Department of State Architect and the California Coastal Commission. Design efforts span pre-design through construction administration, following DSA regulations and Public Contract Code requirements, with deliverables including full construction documents, engineering calculations, CSI-formatted specifications, energy reports, and DSA-compliant submittals. The work must adhere to LEED Indoor Environmental Quality and Materials and Resources criteria, as well as District-approved materials and systems. All proposed team members are subject to fingerprinting and background checks, and key personnel—including the Principal in Charge, Project Director, Project Architect, and leads in all engineering disciplines—must be pre-approved by the District and cannot be substituted without written consent. The Architect must maintain continuity of assigned staff throughout the project and is required to provide litigation support if needed, with reimbursement available unless at fault. Sexual molestation and abuse liability insurance is mandatory for all personnel due to the K-12 environment. Submission of the Statement of Qualifications is electronic through the SecureBids portal by 3:00 p.m. on August 12, 2026, with strict page limits on the cover letter and project examples, while resumes and objections are appended separately. The contract does not specify a fixed value, payment office details, accounting codes, or federal acquisition regulation clauses, and is administered under District procedures with invoices processed within 45 days of approval. The project is located within the Santa Monica-Malibu Unified School District, with services requiring no travel beyond 200 miles from the site, and construction is anticipated to begin in summer 2028.

General Info

Design 18,800 sq ft PE center and Hall of Champions lobby per CHPS standards for Malibu Campus Phase 3B.

Place of Performance

Santa Monica, CA, 90401, USA

Set-Aside

NONE

Documents

7

Malibu Middle and High School Campus Specific Plan May 2024

PDF, High priority: read this firstspecific-plan
High

RFQ 26.44.MM Addendum 1 for AE Services Malibu Campus Plan Phase 3B

PDF, High priority: read this firstamendment
High

RFQ #26.44.MM Architectural and Engineering Design Services for Malibu Campus Plan Phase 3B

PDF, High priority: read this firstrfq
High

SMMUSD Districtwide Educational Specifications Draft 2

PDF, High priority: read this firsteducational-specifications
High

SMMUSD Districtwide Plan for Sustainability February 2019

PDF, Low priorityother
Low

5.+Current+Site+Plan.pdf

PDF

6.+Site+Plan+Survey.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Monica Malibu Unified School District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Sheere Bishop-Griego

Full Description

Show more
Bid #RFQ #26.44.MM: This project is for comprehensive Architectural and Engineering Design Services for Phase 3B of the Malibu Campus Plan. The scope includes the design of a new High School Physical Education Center of approximately 18,800 SF, which will replace the existing upper gym (Building J). The new center will house locker/shower rooms, PE staff and coach offices, a training/treatment room, team locker rooms, a dance/yoga/fitness room, and a weight room. The project also involves adding a new entry lobby, the 'Hall of Champions,' to the existing high school gymnasium, complete with restrooms, concessions, and a ticket booth. Additionally, the scope includes the design for the replacement of a vehicle access ramp. The design must adhere to Collaborative for High Performance Schools (CHPS) standards plus 25% and obtain all necessary approvals from DSA and the California Coastal Commission.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS