This Solicitation opportunity from Washington was posted on June 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Ardmore Outfall Stabilization, City of Bellevue, WA #26049
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Bellevue is soliciting bids for the Ardmore Outfall Stabilization project located within Ardmore Park. The work involves infrastructure improvements at two separate sites on the north and south tributaries of Idylwood Creek. Key installations include a 72-inch precast concrete flow control structure at the north site and an HDPE tee energy dissipator at the south site. The scope of work encompasses the removal of existing CMP culvert pipe and the installation of new PVC and HDPE storm sewer pipes, along with the placement of riprap, crushed surfacing, and a specialized splash pad consisting of streambed cobbles and gravel backfill. Additional project requirements include comprehensive site preparation such as clearing, grubbing, and stormwater bypassing, as well as the implementation of water pollution and erosion controls. The contractor will be responsible for temporary traffic control, tree protection, and final property restoration, including landscape plantings and the salvage of features on private property. Interested parties should note the pre-bid meeting scheduled for June 3rd at the project site.
General Info
Place of Performance
Bellevue, WA, 98004, USASet-Aside
Documents
546AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (11)
See All 11 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
• This project includes two sites, located on tributaries (north and south) to Idylwood Creek within Ardmore Park. A precast concrete type-2, 72-inch flow control structure will be installed at the north tributary site and an HDPE tee energy dissipator will be installed at the south tributary site. The north tributary is located east of the intersection of NE 28th Street and 169th Avenue NE. The south tributary is located east of the intersection of 169th Avenue NE and NE 25th Street.
• Approximately 9 LF of 30-inch CMP culvert pipe removal
• Approximately 13 LF of 30-inch PVC storm sewer pipe installation.
• Approximately 40 LF of 26-inch HDPE storm sewer pipe installation.
• Connection for dissimilar culvert pipe installation.
• Approximately 20 TN of riprap installation.
• Splash pad consisting of 12-inch streambed cobbles, outfall ballast, and gravel backfill for pipe zone bedding installation.
• Approximately 105 TN of crushed surfacing installation.
• Tree protection measure installation.
• Temporary traffic control during construction.
• Landscape plantings (trees and shrubs).
• Clearing and grubbing, tree removal, removal of structures and obstructions, stormwater bypassing, and water pollution/erosion control.
• Property restoration including removal and salvage of landscape features on private property.
Pre-Bid Meeting: 6/3 @ 10:00 am at the project site (accessed from 2508 169th Ave NE)
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
