Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on June 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ardmore Outfall Stabilization, City of Bellevue, WA #26049

Closed
26049State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, with inquiries directed to Christina Pauls in the estimating department.
GSE Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including mechanical and electrical systems, a generator, odor control equipment, new gravity sewers, manholes, and necessary site work such as stormwater facilities and fencing. The contract is based on EJCDC standard forms and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A, to be considered responsive. The project requires strict adherence to quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Performance and payment bonds, along with proof of insurance, are required upon contract execution. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses and various SBA-certified categories, with specific MBE and WBE participation goals established by the EPA and the State of North Carolina.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The City of Bellevue is soliciting bids for the Ardmore Outfall Stabilization project located within Ardmore Park. The work involves infrastructure improvements at two separate sites on the north and south tributaries of Idylwood Creek. Key installations include a 72-inch precast concrete flow control structure at the north site and an HDPE tee energy dissipator at the south site. The scope of work encompasses the removal of existing CMP culvert pipe and the installation of new PVC and HDPE storm sewer pipes, along with the placement of riprap, crushed surfacing, and a specialized splash pad consisting of streambed cobbles and gravel backfill. Additional project requirements include comprehensive site preparation such as clearing, grubbing, and stormwater bypassing, as well as the implementation of water pollution and erosion controls. The contractor will be responsible for temporary traffic control, tree protection, and final property restoration, including landscape plantings and the salvage of features on private property. Interested parties should note the pre-bid meeting scheduled for June 3rd at the project site.

General Info

City of Bellevue bids for Ardmore Outfall Stabilization infrastructure and storm sewer improvements.

Place of Performance

Bellevue, WA, 98004, USA

Set-Aside

NONE

Documents

546

Addendum #1 - Page 1.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Advertisement for Bids - Page 1.jpg

JPG

Advertisement for Bids - Page 2.jpg

JPG

Advertisement for Bids - Page 3.jpg

JPG

Bid Results - Page 1.jpg

JPG

Bid Tabulation - Page 1.jpg

JPG

Plans - Page 10.jpg

JPG

Plans - Page 11.jpg

JPG

Plans - Page 12.jpg

JPG

Plans - Page 13.jpg

JPG

Plans - Page 14.jpg

JPG

Plans - Page 1.jpg

JPG

Plans - Page 2.jpg

JPG

Plans - Page 3.jpg

JPG

Plans - Page 4.jpg

JPG

Plans - Page 5.jpg

JPG

Plans - Page 6.jpg

JPG

Plans - Page 7.jpg

JPG

Plans - Page 8.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 106.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 125.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Bellevue
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → City of Bellevue
Office AddressN/A
ContactsNo contact information available

Interested Companies (11)

Fury Site WorksNorth Bend, WA
Northwest BarricadeEverett, WA
Oldcastle InfrastructureWilsonville, OR

See All 11 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Work contemplated to be performed under this contract is as follows:
• This project includes two sites, located on tributaries (north and south) to Idylwood Creek within Ardmore Park. A precast concrete type-2, 72-inch flow control structure will be installed at the north tributary site and an HDPE tee energy dissipator will be installed at the south tributary site. The north tributary is located east of the intersection of NE 28th Street and 169th Avenue NE. The south tributary is located east of the intersection of 169th Avenue NE and NE 25th Street.
• Approximately 9 LF of 30-inch CMP culvert pipe removal
• Approximately 13 LF of 30-inch PVC storm sewer pipe installation.
• Approximately 40 LF of 26-inch HDPE storm sewer pipe installation.
• Connection for dissimilar culvert pipe installation.
• Approximately 20 TN of riprap installation.
• Splash pad consisting of 12-inch streambed cobbles, outfall ballast, and gravel backfill for pipe zone bedding installation.
• Approximately 105 TN of crushed surfacing installation.
• Tree protection measure installation.
• Temporary traffic control during construction.
• Landscape plantings (trees and shrubs).
• Clearing and grubbing, tree removal, removal of structures and obstructions, stormwater bypassing, and water pollution/erosion control.
• Property restoration including removal and salvage of landscape features on private property.
Pre-Bid Meeting: 6/3 @ 10:00 am at the project site (accessed from 2508 169th Ave NE)

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS