Ardmore Outfall Stabilization

Closed
26049State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 13 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualifications from Design Build Entities for the design and construction of eight new pickleball courts with lighting at Garden Grove Park. This project, estimated to cost between 1,000,000 and 1,200,000 dollars, includes all labor, materials, engineering, and construction services, including site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to California Public Contract Code Section 20164 and Garden Grove Municipal Code. While the contractor is responsible for most testing and inspections, the City will retain a third-party consultant specifically for soil compaction testing. The procurement follows a two-step process where the City will first shortlist the three highest-scoring firms based on experience, technical capabilities, safety records, and financial capacity. These shortlisted firms will then be invited to submit a proposal for final selection based on best value. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a Certification Form, a Firm Information Form, and a Surety Declaration Form confirming the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 13 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Ardmore Outfall Stabilization project, solicited under Bid #26049 by the City of Bellevue Utilities, involves comprehensive stormwater infrastructure improvements at two tributary sites north and south of Idylwood Creek within Ardmore Park. Work includes installing a precast concrete type-2, 72-inch flow control structure at the north tributary near NE 28th Street and 169th Avenue NE, and an HDPE tee energy dissipator at the south tributary near 169th Avenue NE and NE 25th Street. Additional scope encompasses removal of approximately 9 linear feet of 30-inch CMP culvert pipe, installation of 13 linear feet of 30-inch PVC storm sewer pipe and 40 linear feet of 26-inch HDPE storm sewer pipe, along with connections for dissimilar culvert pipe, 20 tons of riprap, a splash pad featuring 12-inch streambed cobbles, outfall ballast, and gravel backfill, and 105 tons of crushed surfacing. The project also requires tree protection for 31 trees, removal of up to five trees, clearing and grubbing, erosion and water pollution controls, stormwater bypassing, temporary traffic control, landscape plantings of 326 one-gallon shrubs and 15 five-gallon trees, compost and topsoil installation, and full property restoration including removal and salvage of private landscape features. All work must be completed within 60 calendar days from the Notice to Proceed, with a contractor-supplied delivery time certification required for any materials with a lead time exceeding 30 days. The contract mandates compliance with federal and state regulations, including Title VI of the Civil Rights Act, Title 49 CFR Part 21, OSHA, and WISHA, with shoring required for all street excavations over four feet in depth. Prevailing wages must be paid per Washington state law, and contractors must submit certified payroll and prevailing wage documentation. Bidders must be licensed in Washington, possess a City of Bellevue business license, hold a UBI number, and provide proof of industrial insurance. Bid submission requires execution of Forms I through IX, including a notarized Noncollusion Certificate, Wage Payment Compliance Certification, and an Affidavit of Equal Opportunity Compliance. A bid deposit of at least 5% of the total bid is required, with awards going to the lowest responsible bidder

General Info

Stabilization work at two Idylwood Creek tributaries in Bellevue, including culvert replacements and erosion control.

Documents

1

Ardmore Outfall Stabilization Bid #26049 Contract Specifications

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Bellevue
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → City of Bellevue
Office AddressN/A

Full Description

Show more
Work contemplated to be performed under this contract is as follows: • This project includes two sites, located on tributaries (north and south) to Idylwood Creek within Ardmore Park. A precast concrete type-2, 72-inch flow control structure will be installed at the north tributary site and an HDPE tee energy dissipator will be installed at the south tributary site. The north tributary is located east of the intersection of NE 28th Street and 169th Avenue NE. The south tributary is located east of the intersection of 169th Avenue NE and NE 25th Street. • Approximately 9 LF of 30-inch CMP culvert pipe removal • Approximately 13 LF of 30-inch PVC storm sewer pipe installation. • Approximately 40 LF of 26-inch HDPE storm sewer pipe installation. • Connection for dissimilar culvert pipe installation. • Approximately 20 TN of riprap installation. • Splash pad consisting of 12-inch streambed cobbles, outfall ballast, and gravel backfill for pipe zone bedding installation. • Approximately 105 TN of crushed surfacing installation. • Tree protection measure installation. • Temporary traffic control during construction. • Landscape plantings (trees and shrubs). • Clearing and grubbing, tree removal, removal of structures and obstructions, stormwater bypassing, and water pollution/erosion control. • Property restoration including removal and salvage of landscape features on private property. The Engineer's Estimate Range is $250,000 to $350,000.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS