Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on September 15, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Area Radiation Monitors

Closed
SB1341-15-RQ-0652Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334519
New
SLED
RFID Stick Readers
Solicitation # 554-27-003
The Texas Animal Health Commission is soliciting bids under solicitation number 554-27-003 for the procurement of low frequency RFID stick readers for livestock applications. The required equipment must include the RFID stick reader, a rugged padded case, a USB data transfer cable, and a charging cable with an adapter, with the capability to display multiple types of data simultaneously. This is an Invitation for Bids (IFB) process, typically awarding to the lowest responsive and responsible bidder. Bids must be submitted in a sealed envelope to the Purchasing Department in Austin, Texas, by 2:00 p.m. Central Time on December 3, 2026. Electronic or facsimile submissions will be rejected, and failure to properly label the envelope or complete the Information and Certifications Form will result in disqualification. The contract is governed by the laws of the State of Texas and the Texas Government Code. Award is expected in December 2026, with payments processed within 30 days of satisfactory delivery in accordance with the Texas Prompt Payment Act. Vendors must certify compliance with various state and federal regulations, including HUB status, antitrust laws, and cybersecurity training requirements. The Texas Animal Health Commission maintains the authority to monitor performance through document reviews and on-site audits, providing a ten-day window for corrective action if non-compliance is identified. Primary administrative and bidding contact is Bryan Krugman.
Texas Animal Health Commission

POSTED

about 8 hours ago

DEADLINE

in about 1 month

General Info

NAICS

334519 - Other Measuring and Controlling Device Manufacturing

Place of Performance

100 Bureau Drive, GAITHERSBURG, MD, 20899, USA

Set-Aside

NONE

Documents

9

ConduitTrough_Wall.jpg

JPG

Detector__1_Location.jpg

JPG

Detector__2_Location.jpg

JPG

Final_Statement_of_Work.docx

DOCX

Network_Hub_location.jpg

JPG

Processing_Units_%2812%29_Location.jpg

JPG

Revised_SB1341-15-RQ-0652.docx

DOCX

Revised_Statement_of_Work.docx

DOCX

SB1341-15-RQ-0652.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 10, 2015 to Sep 14, 2015. The notice description changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA
Contacts
Joni L. LasterContract Specialist
Patrick K StainesContracting Officer

Full Description

Show more
Amendment V: The above referenced solicitation is hereby amended to address vendor questions and answers and to extend the due date for quotations as follows: Questions/Answers: Question: Statement of Work, Section 4.1, Design drawings to be submitted 30 days after award, are these the proposed installation/facility drawings based on site drawings supplied by NIST, or the hardware drawings showing dimensions of the system to be installed? Will NIST revise its own site drawings to show as-installed system upon completion of the installation? If by the supplier, will NIST supply electronic AUTOCAD site drawings for revision by the supplier? Answer: These shall be proposed installation/facility drawings based on site drawings supplied by NIST. NIST will provide electronic AutoCAD site drawings for revision. Question: Statement of Work, Section 3.4.1, a) Does NIST incorporate cyber security protocols on its LAN which will require NIST IT personnel to assist in connecting remote PC(s) to the area monitor system? b) How many remote PC computers on the NIST LAN require access to the new area monitor system? c) Are the PC computers existing? d) Is it acceptable to include a PC workstation, to be located in the location of Processing Units #1 and #2, and it would be connected to the NIST LAN, or does NIST require direct LAN connection to the Processing Units? Answer: NIST will provide its own pc and necessary network configuration settings for the area monitors to establish connection. A single PC will connect to the area monitors for remote control. Supplier must provide monitor units that are "able to communicate through an Ethernet based network or be adaptable to Ethernet-based network. Provide either a twisted wire internet, RS-232 or an RS-422 connection port for remote PC communication". Question: Statement of Work, Section 3.5.3, IEEE STD 323, please define Harsh Environments. Answer: IEEE 323 Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations defines harsh environment "An environment resulting from a design basis event, i.e., loss-of-coolant accident (LOCA), high-energy line break (HELB), and main steam line break (MSLB). Also see IEC 60780 "Nuclear power plants - Electrical equipment of the safety system - Qualification ". In this case a large primary coolant line break is considered. Question: Statement of Work, Section 3.5.5, Should the stated IEC60901-3 be IEC60951-3? Answer: Shall be IEC60951-3 "Nuclear power plants - Instrumentation important to safety - Radiation monitoring for accident and post-accident conditions - Part 3: Equipment for continuous high range area gamma monitoring" Question: Statement of Work, Sections 3.2.5 and 10.4, 100 meters of detector cable is stated, however Figure 1 indicates a total distance of 233 feet. In an effort to reduce cost, does NIST require 100 meters for each detector cable, or can the length of cable be determined and supplied? Answer: The length of cable can be determined and supplied Question: Option Line Item, 0003, TRAINING, Is it acceptable to provide the training session to NIST personnel at the time of set-up and operation of the equipment in Bldg 245 in preparation of the Verification and Acceptance testing? This would allow NIST personnel to operate and test the equipment with a full level of expertise and thereby eliminate the need for a technician be present during the testing. Answer: Yes, if Option Line Item 0003 is exercised, training of NIST personnel can be at the time of set-up and operation of the equipment in Bldg 245 in preparation of the Verification and Acceptance testing. The due date for quotations is hereby extended as follows: FROM: September 10, 2015 @ noon EST TO: September 14, 2015 @ noon EST All other solicitation terms and conditions remain unchanged.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 484230
New
Federal
Combined Synopsis/Solicitation for Spent Fuel Cell Shipment(s)
Solicitation # 1333ND27QNB610AMD
The National Institute of Standards and Technology Center for Neutron Research seeks a qualified contractor to provide packaging and shipping services for spent fuel elements from its facility in Gaithersburg, Maryland, to the Department of Energy Savannah River Site in South Carolina. This firm-fixed-price requirement consists of one base shipment of up to 84 fuel sections to be completed by December 31, 2028, and an optional second shipment of up to 84 fuel sections to be completed by December 31, 2030. The contractor is responsible for providing all project management, labor, and specialized equipment, including shipping casks, transfer casks, baskets, and necessary rigging and lifting machinery. All operations must strictly adhere to Nuclear Regulatory Commission, Department of Transportation, and OSHA regulations, with packaging activities monitored by NIST Health Physics representatives to ensure radiation exposure is kept as low as reasonably achievable. Award will be made to the lowest priced, technically acceptable quoter based on a technical evaluation of the proposed approach and price reasonableness. Quotations must be submitted in two volumes, covering technical capability and pricing, by November 23, 2026. The contract incorporates various federal acquisition regulations, including specific security prohibitions and requirements for custom-built lift safety factors.
Specialized Freight (except Used Goods) Trucking, Long-Distance

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236210
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

11 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS