Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 28, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

AS 40 LONG LEAD TIME MATERIAL PROCUREMENT

Awarded
N00033-09-R-7503Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
SLED
F&W, 2018 Munson Packman Boat Repower project
Solicitation # 2018 Munson Packman Boat Repower
The Confederated Tribes of the Colville Reservation Fish and Wildlife Department is seeking a factory-certified marine contractor to perform a complete propulsion repower and helm system integration on a 30 foot Munson Packman landing craft. The project involves the decommissioning and removal of two existing Honda BF250A outboard engines and legacy iST components, followed by the installation of two new Honda BF250D Drive-by-Wire outboards. The scope of work includes comprehensive digital rigging, the installation of new Honda iST electronic control heads at dual helm stations, integration with the existing NMEA 2000 backbone and SeaStar Power Assist steering system, and a full fuel system overhaul using USCG Type A1-15 lines. The project concludes with factory diagnostic checks and a minimum two hour sea trial to validate performance and safety protocols. To ensure quality and warranty coverage, the contractor must be an authorized Honda Marine Dealer or Service Center and employ technicians with at least five years of experience with commercial aluminum vessels and complex marine networks. Proposals must be submitted as a PDF by November 13, 2026, and must provide a firm-fixed price. Award selection is based on a 100 point evaluation criteria, with a preference for responsible Indian Offerors. The contract requires the contractor to maintain significant insurance coverages, including 1 million dollars per occurrence in general liability, and mandates a 25 percent retainage or a performance bond for contracts exceeding 100,000 dollars. All disputes are subject to the jurisdiction of the Colville Tribal Court and tribal law, and contractors must comply with the Colville Tribal Employment Rights Ordinance.
Confederated Tribes of the Colville Reservation

POSTED

about 15 hours ago

DEADLINE

in 15 days
NAICS: 336611
New
DIBBS
TRAINING SET, FIRE FIGH
Solicitation # SPE8E6-27-T-0421
Solicitation SPE8E6-27-T-0421 is a fixed-price procurement by the Defense Logistics Agency for 39 kits of Fire Fighting and Damage Control training sets, identified by NSN 6930-01-585-8179. The contract is designated as a Service-Disabled Veteran-Owned Small Business Set-Aside, though some sections of the documentation contain conflicting notes regarding small business status. Key delivery requirements include a 76-day delivery window after award, with a need ship date of October 9, 2026, and an original required delivery date of March 30, 2027. Shipping is FOB Origin, with the destination being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, specifically MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Palletization must comply with DLA requirement RP001. Special material restrictions are in place, prohibiting the intentional addition of mercury or mercury-containing compounds, except where functionally required and specified by NAVSEA. The contract incorporates various federal regulations, including the Buy American and Balance of Payments Program, safeguarding of covered defense information, and hazardous material labeling per 29 CFR 1910.1200. Inspection and acceptance will occur at the destination, and all invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

about 23 hours ago

DEADLINE

in 11 days
NAICS: 336611
New
DIBBS
LAMINATED CONDUCTO
Solicitation # SPE7M2-27-T-0463
Solicitation SPE7M2-27-T-0463 is a small business set-aside issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 13 units of Laminated Conducto, identified by NSN 6145-01-524-6075. The requirement is classified under NAICS code 336611. Key delivery milestones include a need ship date of April 26, 2027, and an original required delivery date of January 5, 2028, with a delivery lead time of 167 days after receipt of order. Shipping is designated as FOB Origin, with the destination for both inspection and acceptance being the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically referencing RA001, RC001, RP001, and RQ011. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow RP001. A critical environmental restriction prohibits the intentional addition of mercury or mercury-containing compounds to the hardware, except for specific functional exceptions. Administrative requirements include the use of the Wide Area WorkFlow system for electronic invoicing and payment. The solicitation incorporates various FAR and DFARS clauses covering cybersecurity, the Buy American Act, and the prohibition of covered defense telecommunications equipment.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 23 hours ago

DEADLINE

in 11 days
NAICS: 336611
New
DIBBS
LADDER, EXTENSION
Solicitation # SPE8E9-27-T-0349
Solicitation SPE8E9-27-T-0349, issued by the Department of Defense DLA Troop Support Construction and Equipment MRO SVC I, is for the procurement of one extension ladder under NSN 5440-01-537-4071. The delivery is required within 167 days after receipt of order, with a need ship date of April 26, 2027, and a final delivery date of September 24, 2027. The item is to be delivered to the DLA Distribution Depot at Hill AFB, Utah. All quotes must be submitted via the DLA Internet Bid Board System by November 9, 2026. The contract mandates strict adherence to quality and packaging standards, requiring compliance with ASTM D3951 for packaging, MIL-STD-129 for marking, and MIL-STD-130N for identification. Manufacturers must maintain an inspection system complying with SAE AS9003 or ISO 9001. Inspection and acceptance will occur at the origin. Due to the nature of the technical data, eligible offerors must possess an approved US/Canada Joint Certification Program certification and approval from the DLA controlling authority to access export-controlled data subject to ITAR or EAR regulations. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. The procurement is subject to various federal regulations, including the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Evaluation for award may include a HUBZone price evaluation preference, and offerors must certify their small business status and compliance with prohibitions on covered defense telecommunications equipment.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

about 23 hours ago

DEADLINE

in 11 days
NAICS: 336611
New
Federal
Preserve, Passage In 4-10-6-1-L
Solicitation # N6264927Q0036
Solicitation N6264927Q0036 is a firm-fixed-price requirement issued by the Navsup Flt Logistics Ctr Yokosuka for the preservation of Passage 4-106-1-L on the USS RUSHMORE (LSD-47) in Sasebo, Japan. The scope of work is driven by corrosion identified during assessment and includes the replacement of 18 square feet of lightweight concrete deck covering, the preservation of 270 square feet of bulkheads and overhead surfaces, and the replacement of 35 square feet of insulation and lagging. All work must adhere to specific military standards for epoxy primers, fiberglass insulation, adhesives, and tape. The period of performance is scheduled from January 11, 2027, to July 31, 2027, with inspection and acceptance occurring at the destination. The government intends to make a single award to the responsible offeror who provides the lowest total priced proposal, provided they quote on all items and demonstrate compliance with DFARS 252.225-7042. Eligible offerors must possess or agree to execute a Master Ship Repair Agreement (MSRA) or ABR in the Japan Region. Proposals must be submitted electronically via email and include a breakdown sheet priced in Japanese Yen. Key administrative requirements include the use of Wide Area WorkFlow (WAWF) for invoicing, compliance with 29 CFR 1915 safety standards, and strict adherence to the safeguarding of controlled unclassified information and cybersecurity protocols under DFARS 252.204-7012.
Navsup Flt Logistics Ctr Yokosuka

POSTED

1 day ago

DEADLINE

in 13 days
NAICS: 336611
New
Federal
Fuel Injection Pump Overhaul
Solicitation # N5005427Q0016
Solicitation N5005427Q0016 is a combined synopsis and solicitation for the overhaul of 32 LPD-17 class MPDE Fuel Injection Pumps for the USS San Antonio. The Department of Defense, through the Mid Atlantic Regional Maintenance Center in Norfolk, Virginia, intends to award this contract on a sole source basis to Fairbanks Morse under the authority of FAR 13.106-1(b)(1)(i). The work must be performed at the OEM facility in accordance with OEM procedures and the MPDE maintenance handbook, including joint inspections of disassembled components and a final receipt inspection upon return to the SIMA Diesel shop. The period of performance is scheduled from November 9, 2026, to November 30, 2026, with delivery to MARMC in Norfolk, Virginia. This procurement is conducted using Simplified Acquisition Procedures for commercial items under FAR Part 13 and FAR 12.6. Interested parties must be registered in the System for Award Management and submit quotes via email to the primary point of contact by November 2, 2026. Required quote elements include pricing, business size, payment terms, and a demonstration of technical capability to meet all specifications. The contract incorporates various federal and defense clauses, including Buy American certifications, cybersecurity requirements under DFARS 252.204-7012, and FOB Destination shipping terms.
Mid Atlantic Reg Maintenance Ctr

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Military Sealift Command (MSC) is set to assume operation of the USS FRANK CABLE, a submarine tender, in February 2010. Following this transition, the vessel will undergo a significant modification period, known as an availability, to adapt the ship for MSC operational requirements. Since the ship is homeported in Guam, these modifications are planned to take place locally. To support this extensive work, MSC intends to procure long-lead time material (LLTM), which includes critical components and materials necessary ahead of the main availability period. The procurement contract for the LLTM will be issued as a sole-source award to Guam Shipyards under a Justification and Approval (J&A) for ship-related availability work and materials. The goal is to ensure timely delivery and coordination of supplies to support the retrofit process. The solicitation for this contract, titled "AS 40 LONG LEAD TIME MATERIAL PROCUREMENT," is expected to be released between late July and early August 2009. The contracting office handling this procurement is based in Norfolk, Virginia, under the Military Sealift Command, part of the Department of Defense. Key points of contact have been designated to manage the acquisition process.

General Info

MSC to operate USS FRANK CABLE, contracting Guam Shipyards for long-lead materials procurement.

Contract Value

$1,257,455.86

NAICS

336611 - Ship Building and Repairing

Place of Performance

VA, GUM

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Military Sealift Command
Contacts2 people available
OfficeNORFOLK, VA, 23511-2419, USA
Office AddressNORFOLK, VA, 23511-2419, USA
Contacts
Elyssa J ParanaContracting Officer
Stephen T. HughesContract Specialist

Full Description

Show more
The Military Sealift Command will be assuming operation of the USS FRANK CABLE, a submarine tender, in February of 2010. Shortly thereafter, the CABLE will undergo an extensive availability to modify the ship for MSC operation. The CABLE is homeported in Guam; therefore, the availability is planned to be accomplished in Guam. In preparation for that availability and due to the extensive amount of material that is required, MSC plans to issue a contract for the procurement of long-lead time material (LLTM) in support of the USS FRANK CABLE CIVMOD. The contract will be issued sole-source to Guam Shipyards under a J&A for work and material relating to ship availabilities. The RFP for the LLTM is expected to be released by the end of July or early August 2009.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS