Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

As-Built Surveying and Drafting

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for As-Built Surveying and Drafting involves providing specialized documentation services for prime contractors working on roadway projects within Clackamas County, Oregon. The selected provider will be responsible for recording precise field measurements of underground services and utilities, as well as any changes in location or dimension, utilizing GPS and Total Station equipment. The scope of work requires the drafting of legible as-built drawings that accurately reflect both vertical and horizontal datums, culminating in the delivery of a complete set of certified drawings. This opportunity is associated with NAICS code 541370 and is centered in Oregon City, with a response deadline set for December 9, 2026.

General Info

As-built surveying and drafting for Clackamas County roadway projects, due December 9, 2026.

Place of Performance

Oregon City, OR, 97045, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-83.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BID 2026-83 Cherryville-Welches Area Chip Seal Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Clackamas County
ContactsNo contacts available
OfficeN/A
Organization / AgencyOregon → Clackamas County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs as-built documentation for prime contractors on Clackamas County roadway projects. Records field measurements of underground services, utilities, and changes in dimension or location using GPS and Total Station equipment. Drafts legible as-built drawings showing vertical and horizontal datums. Delivers a complete set of certified as-built drawings.

Similar Contracts

Same NAICS industry code

More opportunities from Oregon → Clackamas County

Same awarding agency

NAICS: 237310
New
SLED
BID 2026-83 Cherryville-Welches Area Chip Seal Project
Solicitation # 2026-83
Clackamas County is soliciting bids for the Cherryville-Welches Area Chip Seal Project, a public improvement contract focused on resurfacing 25 miles of roadway across 54 rural roads. The scope of work involves placing approximately 330,000 square yards of chip seal using County-furnished aggregate, removing thermoplastic pavement markings, and managing temporary work zone traffic control. The project is governed by the 2024 Oregon Standard Specifications for Construction and requires the delivery of as-built drawings as a condition for final payment. On-site work is scheduled to begin no earlier than July 1, 2027, with substantial completion due by September 3, 2027, and final completion by December 31, 2027. The procurement process is managed via the Bid Locker portal, with a response deadline of December 9, 2026. Bidders must comply with Oregon prevailing wage rates and provide a First-Tier Subcontractor Disclosure Form. To be considered responsive, bidders must submit specific reporting forms within two hours of the closing date and demonstrate a good faith effort to engage historically underrepresented business subcontractors. The contract requires performance and payment bonds, as well as certification of compliance with Oregon Worker's Compensation Law. Jon Sparks is designated as the Owner's Authorized Representative, and the contract explicitly prohibits steel material price escalation or de-escalation.
Highway, Street, and Bridge Construction

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
SLED
BID 2026-79 Tri-City WRRF Boiler Gas Feed
Solicitation # S-C01010-00018330
Solicitation S-C01010-00018330, titled BID 2026-79 Tri-City WRRF Boiler Gas Feed, is a public improvement contract issued by Water Environment Services in Clackamas County, Oregon. The project involves modifying existing stainless-steel digester gas piping at the Tri-City Water Resource Recovery Facility to enable combustible gas from anaerobic digesters to flow through gas conditioning units to fuel boilers. The scope of work includes purging gas lines, demolishing existing 6-inch and 8-inch stainless-steel piping, and installing new pipe assemblies, valves, and appurtenances. The contract will be awarded to the lowest responsive and responsible bidder. The project timeline requires substantial completion within three calendar months from the Notice to Proceed, with final completion due one month thereafter. Contractors must adhere to strict material handling and storage guidelines, including the use of designated lifting points for items over 100 pounds and specific environmental protections for equipment. Quality standards are rigorous, requiring compliance with SSPC painting standards, ASTM A262 for stainless steel fabrication, and ACI certifications for adhesive anchor installers. Performance and payment bonds are required, and the owner may utilize Electronic Funds Transfers for payments based on a submitted Schedule of Values. Bidders must register through Bid Locker and submit all required documentation, including subcontractor disclosures and Good Faith Effort forms for Historically Underrepresented Businesses, within two hours of the closing date. The contractor is solely responsible for site safety and must comply with various federal and state non-discrimination and labor laws, including Oregon Worker's Compensation requirements. Inspection and acceptance will be managed by the Engineer and Owner, with a mandatory 30-day operational period to verify equipment performance.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS