Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Cherryville-Welches Area Chip Seal Project

Open
2026-83State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

OR, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Clackamas County
Contacts1 person available
OfficeUSA
Organization / AgencyOregon → Clackamas County
Office AddressUSA
Contacts

Full Description

Show more
CLACKAMAS COUNTY
NOTICE OF PUBLIC IMPROVEMENT CONTRACT OPPORTUNITY
INVITATION TO BID #2026-83
Cherryville-Welches Area Chip Seal Project
November 5, 2026
Clackamas County (“County”) through its Board of County Commissioners is accepting sealed bids for the   Cherryville-Welches Area Chip Seal Project until December 9, 2026, 2:00 PM, Pacific Time, (“Bid Closing”) at the following location:
Bidding Documents can be downloaded from the state of Oregon procurement website (“OregonBuys”) at the following address: https://oregonbuys.gov/bso/view/login/login.xhtml, Document No.S-C01010-00018361.
Prospective Bidders will need to sign in to download the information and that information will be accumulated for a Plan Holder's List. Prospective Bidders are responsible for obtaining any Addenda from Website listed above.
Submitting Proposals: Bid Locker
Proposals will only be accepted electronically thru a secure online bid submission service, Bid Locker. Email submissions to Clackamas County email addresses will no longer be accepted.
A.     Completed proposal documents must arrive electronically via Bid Locker located at https://bidlocker.us/a/clackamascounty/BidLocker.
B.      Bid Locker will electronically document the date and time of all submissions. Completed documents must arrive by the deadline indicated in Section 1 or as modified by Addendum. LATE PROPOSALS WILL NOT BE ACCEPTED.
C.      Proposers must register and create a profile for their business with Bid Locker in order to submit for this project. It is free to register for Bid Locker.
D.     Proposers with further questions concerning Bid Locker may review the Vendor’s Guide located at  https://www.clackamas.us/how-to-bid-on-county-projects .
Engineers Estimate: $1,455,000.00
Contact Information
Procurement Process and Technical Questions: Tralee Whitley at contact@example.gov
Bids will be opened and publicly read aloud at the above Delivery address after the Bid Closing. Bid results will also be posted to the OregonBuys listing shortly after the opening.
To be eligible for award under this Invitation to Bid, bidders (prime contractors) must submit a prequalification application (either ODOT or County) to the County at least two business days prior to the Bid Closing.  County will reject bids from bidders who are not prequalified for the class of work indicated prior to the Bid Closing. Bidders must be prequalified in Asphalt Concrete Paving & Oiling (ACP) and Temporary Traffic Control (TTC).
State Prevailing Wage
Prevailing Wage Rates requirements apply to this Project because the maximum compensation for all Owner-contracted Work is more than $50,000. Contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870, relative to Prevailing Wage Rates. The Bureau of Labor and Industries (BOLI) wage rates and requirements set forth in the following BOLI booklet (and any listed amendments to that booklet), which are incorporated herein by reference, apply to the Work authorized under this Agreement:
PREVAILING WAGE RATES for Public Works Contracts in Oregon, July 5, 2026 and amended on October 5, 2026, which can be downloaded at the following web address: http://www.oregon.gov/boli/WHD/PWR/Pages/pwr_state.aspx The Work will take place in Clackamas County, Oregon.
Clackamas County encourages bids from Minority, Women, and Emerging Small Businesses.

More opportunities from Oregon → Clackamas County

Same awarding agency

NAICS: 237310
New
SLED
BID 2026-83 Cherryville-Welches Area Chip Seal Project
Solicitation # 2026-83
Clackamas County is soliciting bids for the Cherryville-Welches Area Chip Seal Project, a public improvement contract focused on resurfacing 25 miles of roadway across 54 rural roads. The scope of work involves placing approximately 330,000 square yards of chip seal using County-furnished aggregate, removing thermoplastic pavement markings, and managing temporary work zone traffic control. The project is governed by the 2024 Oregon Standard Specifications for Construction and requires the delivery of as-built drawings as a condition for final payment. On-site work is scheduled to begin no earlier than July 1, 2027, with substantial completion due by September 3, 2027, and final completion by December 31, 2027. The procurement process is managed via the Bid Locker portal, with a response deadline of December 9, 2026. Bidders must comply with Oregon prevailing wage rates and provide a First-Tier Subcontractor Disclosure Form. To be considered responsive, bidders must submit specific reporting forms within two hours of the closing date and demonstrate a good faith effort to engage historically underrepresented business subcontractors. The contract requires performance and payment bonds, as well as certification of compliance with Oregon Worker's Compensation Law. Jon Sparks is designated as the Owner's Authorized Representative, and the contract explicitly prohibits steel material price escalation or de-escalation.
Highway, Street, and Bridge Construction

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
SLED
BID 2026-79 Tri-City WRRF Boiler Gas Feed
Solicitation # S-C01010-00018330
Solicitation S-C01010-00018330, titled BID 2026-79 Tri-City WRRF Boiler Gas Feed, is a public improvement contract issued by Water Environment Services in Clackamas County, Oregon. The project involves modifying existing stainless-steel digester gas piping at the Tri-City Water Resource Recovery Facility to enable combustible gas from anaerobic digesters to flow through gas conditioning units to fuel boilers. The scope of work includes purging gas lines, demolishing existing 6-inch and 8-inch stainless-steel piping, and installing new pipe assemblies, valves, and appurtenances. The contract will be awarded to the lowest responsive and responsible bidder. The project timeline requires substantial completion within three calendar months from the Notice to Proceed, with final completion due one month thereafter. Contractors must adhere to strict material handling and storage guidelines, including the use of designated lifting points for items over 100 pounds and specific environmental protections for equipment. Quality standards are rigorous, requiring compliance with SSPC painting standards, ASTM A262 for stainless steel fabrication, and ACI certifications for adhesive anchor installers. Performance and payment bonds are required, and the owner may utilize Electronic Funds Transfers for payments based on a submitted Schedule of Values. Bidders must register through Bid Locker and submit all required documentation, including subcontractor disclosures and Good Faith Effort forms for Historically Underrepresented Businesses, within two hours of the closing date. The contractor is solely responsible for site safety and must comply with various federal and state non-discrimination and labor laws, including Oregon Worker's Compensation requirements. Inspection and acceptance will be managed by the Engineer and Owner, with a mandatory 30-day operational period to verify equipment performance.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

2 days ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS