Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Custom Metal Fabrication

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Custom Metal Fabrication involves the production of custom metal components, supports, and brackets for prime contractors working on Clackamas County WRRF projects in Oregon City. The scope of work requires shop fabrication using specific stainless steel and carbon steel materials, including ASTM A167, A666, A36, and A500, with all work based on field-verified dimensions and performed in accordance with AISC and AISI standards. The contract is managed by Clackamas County in Oregon under NAICS code 332312. Interested parties must submit their responses by the deadline of December 3, 2026. The selected subcontractor will be responsible for the fabrication and delivery of all metal assemblies and supports directly to the project site.

General Info

Place of Performance

Oregon City, OR, 97045, USA

Set-Aside

NONE

Documents

This scope was carved out of S-C01010-00018330.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

BID 2026-79 Tri-City WRRF Boiler Gas Feed

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → Clackamas County
ContactsNo contacts available
OfficeN/A
Organization / AgencyOregon → Clackamas County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates custom metal components, supports, and brackets for prime contractors on Clackamas County WRRF projects. Performs shop fabrication of metalwork using stainless steel (ASTM A167, A666) and carbon steel (ASTM A36, A500) based on field-verified dimensions. Adheres to AISC and AISI standards. Delivers shop-fabricated metal assemblies and supports to the project site.

Similar Contracts

Same NAICS industry code

More opportunities from Oregon → Clackamas County

Same awarding agency

NAICS: 238220
New
SLED
BID 2026-79 Tri-City WRRF Boiler Gas Feed
Solicitation # S-C01010-00018330
Solicitation S-C01010-00018330, titled BID 2026-79 Tri-City WRRF Boiler Gas Feed, is a public improvement contract issued by Water Environment Services in Clackamas County, Oregon. The project involves modifying existing stainless-steel digester gas piping at the Tri-City Water Resource Recovery Facility to enable combustible gas from anaerobic digesters to flow through gas conditioning units to fuel boilers. The scope of work includes purging gas lines, demolishing existing 6-inch and 8-inch stainless-steel piping, and installing new pipe assemblies, valves, and appurtenances. The contract will be awarded to the lowest responsive and responsible bidder. The project timeline requires substantial completion within three calendar months from the Notice to Proceed, with final completion due one month thereafter. Contractors must adhere to strict material handling and storage guidelines, including the use of designated lifting points for items over 100 pounds and specific environmental protections for equipment. Quality standards are rigorous, requiring compliance with SSPC painting standards, ASTM A262 for stainless steel fabrication, and ACI certifications for adhesive anchor installers. Performance and payment bonds are required, and the owner may utilize Electronic Funds Transfers for payments based on a submitted Schedule of Values. Bidders must register through Bid Locker and submit all required documentation, including subcontractor disclosures and Good Faith Effort forms for Historically Underrepresented Businesses, within two hours of the closing date. The contractor is solely responsible for site safety and must comply with various federal and state non-discrimination and labor laws, including Oregon Worker's Compensation requirements. Inspection and acceptance will be managed by the Engineer and Owner, with a mandatory 30-day operational period to verify equipment performance.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 14 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS