The contract involves the screening and crushing of a concrete and dirt stockpile at the California Street Landfill. The contractor is responsible for mobilizing and demobilizing equipment necessary to process the heterogeneous stockpile, which contains a mix of concrete chunks, some with reinforcing metal, and an estimated 35% to 45% dirt content. Crushing must reduce the concrete to pieces no larger than ¾ inch for use in landfill road building. Operations must be coordinated with the Landfill Manager to avoid disrupting daily landfill activities, and all activities must comply with environmental regulations including stormwater pollution prevention. The contractor’s mobilization price must cover all associated fees and rentals, and equipment movement is generally limited to landfill operating hours, with exceptions allowed upon approval. Payment is based on a per-ton rate for screened and crushed material, with quantities verified via onsite scales or volume surveys, and tonnage reports submitted daily to the Landfill Manager. The contractor must certify all materials are free from asbestos, hazardous wastes, or other contaminants, with rejection and removal of unsuitable materials at the contractor’s expense. Explosives and blasting are prohibited. The contract term is three years, with prices fixed as per the bidder’s schedule, and adjustments to the volume of work may be made by the landfill depending on need and funding. The contractor agrees to provide all labor, materials, and services necessary for complete performance under the contract.
General Info
Agency
NAICS
Place of Performance
2151 Nevada St. Redlands CA 92373, CA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Set up of equipment and the processing/crushing operation shall be coordinated with the Landfill Manager. The project shall be set up or operated in a location where it shall not interfere with daily operations of the Landfill.
Mobilization of Equipment
Contractor shall quote a lump sum price to mobilize & demobilize appropriate equipment to screen the existing stockpile of concrete/dirt into various sizes and to crush larger pieces into ¾ inches. This price shall be inclusive of any and all permit, fees and/or rentals needed to stage the equipment at the Landfill. The Landfill operating hours for moving equipment in and out are typically 6:00 a.m. to 2:30 p.m. For the purpose of this Bid item, assume that mobilization/demobilization can take outside of the normal working hours, including on Saturday, provided appropriate arrangements are made in advance with the Landfill Manager.
Concrete Stockpile Screening
Contractor shall provide a per ton yard rate for the labor and equipment the contractor deems necessary to screen/segregate concrete from the stockpile at the California Street Landfill. Upon further examination it appears that the current stockpile is heterogenous and contains estimated 35% to 45% dirt in and a wide variety of concrete chunk sizes, with and without reinforcing metal. It is expected that the Contractor, upon examination of the current stockpile, will be able to identify the most effective means of processing the stockpile.
Explosives and blasting are not permitted in the performance of the pre-processing work. Work shall comply with the Landfill’s Storm Water Pollution Prevention Plan. Residual metal concrete reinforcement materials that are recovered shall be managed by the City of Redlands Landfill staff.
The Contractor shall ensure the work area affected by the stockpile screening will not allow ponding of water.
Concrete Crushing
Concrete pieces regardless of size are to be crushed. Concrete is to be crushed to produce one size of material for use in landfill road building. The Landfill fill desires material that is the following size:
• ¾ inches
The estimated quantity used for bidding is not a guarantee on the amount of material that is actually on site. The Landfill may, at its discretion based on need and/or available funding, increase or decrease the quantity of material to be produced.
Payment will be on a per ton basis. Total tons produced shall be documented by the contractor. The Landfill reserves the right to verify tonnage and quantities via the on-site landfill scales and/or volumetric survey of the final product piles. Daily belt scale tickets are to be provided to the Landfill Manager.
The Contractor shall document and certify any material provided under this bid item is not contaminated by nor contains asbestos, asbestos containing materials, solid waste, infectious waste, hazardous waste or construction/demolition material (i.e. wood, shingles, drywall, etc.). The landfill reserves the right to reject any material which may contain the appearance of containing said contaminants. Removal of any rejected material from the Landfill and the appropriate handling/disposition of such materials shall be at the sole expense of the Contractor.
Pursuant to and in compliance with your Notice Inviting Bids, and the other documents relating thereto, the undersigned Bidder, having familiarized themselves with the terms of the bid, the local conditions affecting the performance of the work and the cost of the work at the place where the work is to be done, and with the plans thereto, hereby proposes and agrees to perform within the time stipulated, the work, including all of its component parts and everything required to be performed, and to provide and furnish any and all of the labor, materials, tools, equipment and all utility and transportation services necessary to perform the contract.
Notes: CONTRACT TERM: Service Period
This solicitation is for a three (3) year commitment. The term of the contract is for three (3) years with the same terms and conditions. The bid price for the three (3) years shall follow the bid schedule pricing provided in the bid by the Bidder.
More opportunities from California → Facilities & Community Services Department of City of Redlands
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS