Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Asbestos Abatement and Hazardous Material Removal

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was necessitated by a sprinkler system failure and requires the remediation of mold throughout the entire building, as well as the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with a specific requirement to achieve interior humidity levels of 50 percent or less. Key deliverables include the provision of a Certified Industrial Hygienist for verification and daily site visits, a detailed remediation plan featuring HEPA filtration and negative air pressure, and a final clearance walkthrough. The contract will be awarded based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at a site visit on October 27, 2026, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must provide specific automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Work is expected to commence within 14 days of the Notice to Proceed, with payment issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the complete identification, containment, and removal of asbestos-containing materials from an existing restroom structure prior to its demolition. The scope includes conducting thorough air monitoring to ensure safe working conditions and full compliance with all regulatory requirements related to hazardous material abatement. This work is essential to prevent asbestos exposure risks during the demolition phase and to meet safety and environmental standards. Issued by the Department of Defense through the W2SD Endist New England agency, this subcontract opportunity is designated as a Total Small Business Set-Aside under FAR 19.5, targeting qualified small businesses within NAICS code 562910. The solicitation was posted on June 2, 2026, with a response deadline of June 17, 2026, highlighting the need for timely proposals. While specific location and contact details are not provided, the contract emphasizes adherence to strict federal regulations governing asbestos and hazardous material removal to ensure safe and compliant project execution.

General Info

Asbestos abatement and air monitoring before restroom demolition, small business subcontract opportunity.

NAICS

562910 - Remediation Services

Place of Performance

MA

Set-Aside

SBA

Documents

This scope was carved out of W912WJ26QA109.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Restroom Demolition and Installation of New Concrete Restroom Facility, Lake Siog, East Brimfield Lake, Holland, MA

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Complete identification, containment, and removal of asbestos-containing materials (ACMs) from the existing restroom structure prior to demolition, including air monitoring and regulatory compliance.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
Other Heavy and Civil Engineering Construction

POSTED

about 21 hours ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS