Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Asbestos Abatement

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

DC, USA

Set-Aside

NONE

Documents

This scope was carved out of DCAM-27-CS-RFP-0003.

The full solicitation package (42 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

LANGLEY ELEMENTARY SCHOOL MODERNIZATION

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → DCPS (C&P)
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs hazardous material removal and remediation for prime contractors on District of Columbia Government (DGS/DCPS) school modernization projects. Removes asbestos-containing pipe insulation and ceiling tiles per the Asbestos Management Plan. Requires licensed asbestos abatement certification. Delivers certified asbestos-free environment and disposal reports.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
SLED
REBID: Sink Undercoating Abatement
Solicitation # COC-RWR-FY26-31100A
The City of Cambridge is soliciting bids for the removal of approximately 41 classroom sinks with asbestos-containing undercoatings at the former Kennedy-Longfellow School located at 158 Spring Street and Ahern Field. The scope of work requires the establishment of regulated mini-enclosures and the maintenance of engineering controls to perform abatement in accordance with the project Asbestos Work Plan and applicable federal and state regulations. Faucets must be removed as a complete unit with the sinks, and all work must be performed while the school remains unoccupied. The project must be completed within two months of the Notice to Proceed, with work commencing within seven days of said notice. Contractors must adhere to strict waste packaging and labeling standards, including the use of leak-tight locking containers lined with 6-mil poly sheeting and transport in sealed vans with airtight barriers. Compliance with OSHA-approved safety and health training and the Americans with Disabilities Act is mandatory. Evaluation factors include the submission of three customer references from the last five years and a firm price proposal. Final acceptance is contingent upon a no visible suspect dust or debris standard, verified by third-party monitoring and clearance air sampling using Phase Contrast Microscopy or Transmission Electron Microscopy. Required financial protections include performance and payment bonds, with a 50% payment bond required for contracts exceeding $25,000, and a wage bond covering one year of gross wages for all employees.
Capital Buildings Projects

POSTED

about 16 hours ago

DEADLINE

in 20 days
View Details

More opportunities from District of Columbia → DCPS (C&P)

Same awarding agency

NAICS: 236220
New
SLED
LANGLEY ELEMENTARY SCHOOL MODERNIZATION
Solicitation # DCAM-27-CS-RFP-0003
The Langley Elementary School Modernization project, solicitation DCAM-27-CS-RFP-0003, is a design-build contract for the District of Columbia Public Schools to modernize a historic 1923 facility into an approximately 100,373 square-foot school including a Child Development Center. The scope involves a combination of renovation and new construction, specifically focusing on preserving the central auditorium and maximizing existing space to create a gymnasium compliant with DCPS Educational Specifications. The project also requires the design of new outdoor play areas, educational spaces, parking, loading facilities, and site fencing. A critical objective is resolving site safety and traffic concerns near the McKinley Tech entrance and improving accessible pedestrian pathways between the school, the parking lot, and the Harry Thomas Recreation Center field. The project is divided into design/preconstruction and construction phases, with a strong emphasis on retaining recent upgrades such as the 2024 HVAC and roof replacements and the 2022 elevator. Proposals are evaluated on a 112-point scale, with the highest weight placed on the Project Management Plan and Schedule. Award decisions are based on the most advantageous offer to the Department, with preferences given to Certified Business Enterprises (CBE) and Small Business Enterprises (SBE). Technical requirements include strict adherence to ADA accessibility, NFPA electrical and flammable storage standards, and ACI concrete tolerances. Financial allowances include $800,000 for permits, $500,000 for public art, and $400,000 for utilities. All submissions must be received by December 21, 2026.
Commercial and Institutional Building Construction

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS