Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on June 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Asphalt Paving and Striping

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
International
Buckinghamshire Highways Works Open Framework
Solicitation # BC/0002075
The Buckinghamshire Highways Works Open Framework, solicitation BC/0002075, is a procurement by Buckinghamshire Council to establish an Open Framework Scheme for highway-related construction, capital-funded maintenance, and improvement schemes. The framework is designed to enhance the operation and serviceability of highway assets and is divided into seven discrete lots, with the intention of appointing a maximum of four suppliers per lot. The total estimated value of the contract ranges from £126,030,000 excluding VAT to £151,236,000 including VAT, with a maximum total duration of eight years from the commencement of the initial framework agreement, estimated to end by April 1, 2035. The procurement process is conducted in two stages, beginning with a Pre-Qualification Stage (PSQ) that evaluates financial standing, health and safety policies, and data protection. Bidders must meet specific insurance requirements, including £20m for both Employer’s and Public Liability Insurance and £5m for Professional Indemnity Insurance. Award decisions are based on the most advantageous tender, weighted 60% on price and 40% on quality. Quality assessments focus on technical capability, service delivery, the NEC4 delivery model, innovation, social value, and sustainability. Performance will be monitored through five core Key Performance Indicators (KPIs) and additional call-off KPIs. There is no set-aside status for this solicitation.
Buckinghamshire Council

POSTED

about 18 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Curtiss Park Trail State Project No. 128-158
Solicitation # E26-01
The Town of Simsbury is soliciting bids for the Curtiss Park Trail project, State Project No. 128-158, which involves the construction of approximately 3,000 linear feet of bituminous concrete multi-use trail. The trail will run along the north side of Tariffville Road, crossing the Farmington River via an existing sidewalk on the Tariffville Road bridge, and extending to Curtiss and Pattison Parks. The scope includes the construction of a boardwalk section within and adjacent to wetlands in the Farmington River riparian corridor. This project is funded through the Transportation Alternatives Program and is administered by the Connecticut Department of Transportation. The contract will be awarded to the lowest responsive and responsible bidder who is properly licensed, adequately staffed, and experienced in the required work. Bidders must provide a CTDOT contractor prequalification certificate and submit a physical bid package including a non-collusion affidavit, bid security, and a hold harmless and indemnification agreement. Key technical requirements include adherence to CTDOT Standard Specifications and Connecticut Guidelines for Soil Erosion and Sediment Control. Revised bid quantities include 1,172 cubic yards of earth excavation and 1,710 tons for the disposal of controlled materials. There is no set-aside status for this solicitation, and the DBE participation goal is zero percent. Bids are due by November 24, 2026, at 2:00 PM.
DAS Procurement

POSTED

about 21 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Amador County in California is seeking a subcontractor for an asphalt paving and striping project located in Pioneer, zip code 95666. The scope of work involves the installation of 5,000 square feet of asphalt paving and 200 linear feet of traffic striping to establish access and parking areas. The solicitation was posted on June 19, 2026, and the deadline for responses is July 23, 2026, at 8:30 PM. This project falls under NAICS code 237310 for highway, street, and bridge construction.

General Info

Amador County seeks subcontractor for asphalt paving and striping in Pioneer, CA.

Place of Performance

Pioneer, CA, 95666, USA

Set-Aside

NONE

Documents

This scope was carved out of 25-05.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Amador County Pioneer Park Improvement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 5 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 9 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Amador County
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Amador County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 5,000 SF of asphalt paving and 200 LF of traffic striping for access and parking areas.

More opportunities from California → Amador County

Same awarding agency

NAICS: 237210
SLED
Tentative Parcel Map No. 2907 Jess Project
Solicitation # TPM 2907 Jess Project
The Tentative Parcel Map No. 2907 Jess Project, managed by the Amador County Planning Department, involves the division of a 215.46-acre parcel located at 6780 Martin Lane in Ione, California, into two separate parcels of approximately 22 and 193.46 acres. This land use action includes a General Plan Amendment to change the designation from Agricultural to Industrial, a Zone Change from Exclusive Agriculture to Special Use and vice versa, and an amendment to California Land Conservation Act Contract #412. The project has undergone environmental review under the California Environmental Quality Act, resulting in a Mitigated Negative Declaration and a Notice of Determination filed on September 22, 2026, confirming that the project will not have a significant effect on the environment provided specific mitigation measures are implemented. Key requirements for the project include the submission of a final parcel map and public report, as well as surveys conducted by a licensed land surveyor or registered civil engineer. The applicant must provide irrevocable offers of dedication for a 25-foot fee right-of-way along Iristown Road and Spagnoli Mine Road, and establish utility easements per County Code. Environmental compliance mandates include biological and rare plant surveys prior to construction, the establishment of avoidance zones for special-status species, and the implementation of erosion control best management practices to protect wetlands. Additionally, the project must adhere to California Health and Safety Code Section 7050.5 regarding the discovery of human remains. Monitoring and oversight are distributed across the Amador County Building Department, the Surveyor's Office, and the Department of Transportation and Public Works.
Land Subdivision

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Tentative Parcel Map No. 2935 Smith
Solicitation # PM 2935 Smith
Tentative Parcel Map No. 2935 Smith is a project managed by the Amador County Planning Department to divide a 33.56-acre parcel located at 10846 Sunset Drive in Jackson, California, into three separate parcels measuring approximately 5 acres, 5.64 acres, and 22.92 acres. The property is split-zoned as R1A for Single-family Residential and Agricultural and T2 for Mobile Home Park - Camp District, with a General Plan Designation of Agricultural Transition. The project was approved on August 11, 2026, following a public hearing and the filing of a Mitigated Negative Declaration under the California Environmental Quality Act, which determined that potential environmental impacts would be reduced to less than significant levels through specific mitigation measures. The project is subject to the California Subdivision Map Act and requires the applicants, Jerad and Kristin Smith, to fulfill several deliverables, including the submission of a Parcel Map, a Public Report, and a Preliminary Title Report as evidence of ownership. Additional requirements include the payment of Department of Fish and Wildlife filing fees and the provision of an updated Parcel Map Guarantee at the time of recording. Compliance is monitored through a Mitigation Monitoring and Reporting Program, and any future construction or substantial earthmoving requires a grading permit and building inspections, with a minimum of 48 hours' notice provided to the county inspector. Coordination is handled by Nicole Sheppard of the Amador County Planning Department and Matt Toma of Toma and Associates.
Land Subdivision

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 236220
SLED
UP-25;9-1 Calvary Chapel of Amador County
Solicitation # UP-25;9-1
Use Permit UP-25;9-1 authorizes Calvary Chapel of Amador County to amend its existing Use Permit and Master Plan for the property located at 18400 Ridge Road in Pine Grove, California. The project scope includes the construction of a 16,800 square-foot sanctuary building with a capacity of up to 500 seats on the current gravel parking lot, the addition of a paved parking lot providing 270 spaces, and the reconfiguration of the existing multi-purpose building. The Amador County Planning Commission approved the project on August 12, 2025, following a CEQA review that resulted in a Mitigated Negative Declaration, confirming that no significant environmental impacts are expected provided specific mitigation measures are implemented. The project is subject to strict compliance with county codes and environmental standards, including noise levels not exceeding 65 decibels at the property line and the use of fully-shielded, downward-directed lighting with a color temperature of 3000K or less. Key infrastructure requirements include the dedication of a right-of-way along Ridge Road, the construction of a left turn lane to Public Works specifications, and the payment of traffic mitigation fees. Financial obligations include a five percent improvement cost deposit with the Water Resources Department and the payment of actual costs for plan checking, inspection, and testing. Oversight is managed by the Amador County Planning, Building, and Environmental Health departments to ensure construction aligns with approved plot plans and sewage disposal certifications.
Commercial and Institutional Building Construction

POSTED

12 months ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS