AVAIO Pittsburg Backup Generating Facility

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The AVAIO Pittsburg Backup Generating Facility project, identified by solicitation number 24-SPPE-01, involves the design and construction of a 347,740 square foot three-story data center and an associated emergency backup power facility in the City of Pittsburg, California. The facility will feature thirty-seven 3 MW diesel-fired generators providing a total capacity of up to 92 MW to ensure uninterruptible power for tenant servers and life safety services during utility power losses. The project scope also includes an onsite project substation, a Pacific Gas and Electric Company switching station, and an onsite transmission line. The California Energy Commission granted a Small Power Plant Exemption for the facility on December 8, 2025, following an environmental review process. A Mitigated Negative Declaration and an Environmental Impact Report concluded that the project would not have significant environmental effects, provided that specific mitigation measures for air quality, biological resources, and greenhouse gases are implemented. Key regulatory requirements include compliance with the California Environmental Quality Act and the appointment of a Qualified Professional Paleontologist to oversee ground disturbance activities. Project management is coordinated through the California Energy Commission and the City of Pittsburg Planning Division.

General Info

Design and construction of a 92MW backup power facility in Pittsburg, California.

Agency

California → Energy Commission

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Pittsburg, CA, 94565

Set-Aside

NONE

Documents

(8)

Notice of Determination for AVAIO Pittsburgh Backup Generating Facility

PDFnotice-of-determination

AVAIO Pittsburgh Backup Generating Facility Notice of Completion

PDFnotice-of-completion

AVAIO Pittsburgh Backup Generating Facility Mitigated Negative Declaration 24-SPPE-01

PDFmitigated-negative-declaration

Notice of Intent to Adopt Mitigated Negative Declaration for AVAIO Pittsburgh Backup Generating Facility

PDFnotice-of-intent

2025100607_CDFW_Comment on AVAIO Pittsburgh Backup Generating Facility IS/MND

PDFcomment-letter

AVAIO Pittsburgh Backup Generating Facility Environmental Summary

PDFenvironmental-summary

Pittsburgh Data Hub Notice of Determination 12-12-25

PDFnotice-of-determination

2025 Environmental Document Filing Fee Cash Receipt - 2025100607

PDFreceipt

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts3 people available
OfficeN/A
Organization / Agency
California → Energy Commission
Office AddressN/A
Contacts
Alison SpellsSenior Planner
Ali JahaniProject Manager
John DeLacioProject Manager

Full Description

Show more
The proposed Pittsburg Data Hub (PDH) project includes commercial design review of a three-story data center building (347,740 square foot), backup generators to support the data center building, an onsite project substation, a Pacific Gas and Electric Company switching station, and an onsite transmission line. The backup generators would only serve the Data Hub, by providing up to 92 MW of emergency generation to replace the maximum electricity needs of the Data Hub in case of a loss of utility power. On December 8, 2025, the Applicant for the Pittsburg Data Hub received a Small Power Plant Exemption from the CEC for the PDH Backup Generating Facility.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Federal
FY27 SPECIAL PROJECT USNH YOKOSUKA ALTERATION, JAPAN
Solicitation # N4008427R1027
This is a sources sought notice issued by the Naval Facilities Engineering Systems Command Far East for a major renovation project at U.S. Naval Hospital Yokosuka in Japan, with a projected scope valued between $100 million and $250 million. The notice is not a solicitation for proposals but a market research effort to identify qualified contractors capable of performing a Design-Bid-Build construction project involving three interrelated packages: Package A, the base electrical infrastructure work requiring 578 calendar days; Package B, alterations to Buildings 1400 and 1407 at 1,627 calendar days; and Package C, renovation of the operating room in Building 1400 at 986 calendar days. Package A must be completed before work on Packages B and C can commence, and those two are optional, subject to future funding and exercise after award. The work encompasses extensive civil, structural, architectural, mechanical, electrical, plumbing, fire protection, cybersecurity, hazardous material abatement, antiterrorism, and sustainability measures across multiple hospital departments including the Emergency Department, Inpatient Pharmacy, Radiology, Sterile Processing, Surgery Suites, and Laboratory, requiring full compliance with UFC and NFPA standards, ABA accessibility standards, MHS World Class Checklist, and Japanese regulations. Contractors must be legally authorized to conduct business in Japan, possess a valid construction license issued by the Ministry of Land, Infrastructure and Transport or a prefectural authority, and be capable of executing complex renovations within an active military medical facility without disrupting critical operations. The U.S. Government will not extend United States Official Contractor status or civilian component certification under the U.S.-Japan Status of Forces Agreement, meaning contractors and their personnel must operate under local Japanese law without U.S. diplomatic protections. Responses must be submitted electronically via the designated Contractor Information Form, limited to 12 single-sided pages or six double-sided pages with 12-point font, including up to five detailed project examples that demonstrate relevant experience, capability, and capacity. All submissions must be received by 1530 JST on August 10, 2026, and no reimbursement will be provided for response costs. Proprietary information will be safeguarded and used solely for acquisition planning; no contract award will result from this notice, no evaluations or feedback will be issued, and no binding obligations are formed regardless of the substance of submissions. The contract type, when awarded, will be firm-fixed-price with performance occurring entirely on the
Navfacsyscom Far East

POSTED

about 1 hour ago

DEADLINE

in 15 days
View Details
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, Project 7190530, involves upgrading the life health safety systems in Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs within an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 380 calendar days after the award. The basis for award is the lowest price, and the successful offeror will be issued a task order under MACC contract N4008525D. Key administrative requirements include the submission of proposals by September 24, 2026, at 3:00 PM local time. Bonding requirements are tiered based on proposal value, with bid, payment, and performance bonds required for proposals exceeding 150,000 dollars. The contract is subject to the Davis-Bacon Act and the Buy American Act, and it mandates specific paid sick leave for employees. Invoicing must be processed through Wide Area WorkFlow, and the contractor is required to maintain a comprehensive quality control system covering both onsite and offsite operations. Final acceptance is contingent upon a series of inspections, including punch out, pre-final, and final acceptance inspections.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS