Avenue 50 Bridge Over Coachella Valley Stormwater Channel Improvement Project

Active
20260708017State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Coachella is soliciting bids for the Avenue 50 Bridge Over Coachella Valley Stormwater Channel Improvement Project, a public works initiative to transform Avenue 50 from a two-lane road into a four-lane arterial facility. The scope includes constructing a new five-span bridge over the Coachella Valley Stormwater Channel, realigning Tyler Street, installing a traffic signal at the intersection, and reconstructing Concrete Slope Protection and the CV/Link multimodal pathway. Additional work encompasses new waterlines, concrete curb and gutter, hot mix asphalt paving, traffic signs, pavement markings compliant with the California MUTCD, and all associated utilities and infrastructure. The contract requires completion within 550 working days from the Notice to Proceed, with all work performed at the project site in Coachella, California, 92236. Bids must be submitted as sealed physical packages to the City’s engineering offices by 2:00 P.M. on August 19, 2026, with electronic submissions not accepted. Bidders are required to be registered with the California Department of Industrial Relations, hold a valid Class A contractor license, and comply with prevailing wage laws as determined for Riverside County, including posting wage rates on-site and submitting electronic certified payroll records under SB854. A 10% bid security in the form of cash, certified check, or bid bond is mandatory, and failure to meet this requirement renders the bid non-responsive. Upon award, the successful bidder must furnish performance and payment bonds totaling 100% of the contract value, issued by a California-admitted surety. The City will award the contract to the lowest responsive and responsible bidder using a Lowest Price Technically Acceptable evaluation method, with no trade-off analysis between cost and technical factors. All contract documents, including plans and specifications, are available exclusively through PlanIT Planroom, and bidders are solely responsible for obtaining all addenda. No formal FAR clauses, accounting codes, invoicing systems, COR/COTR designations, or contract type specifications are included, as this is a municipal procurement governed by California Public Contract Code and Labor Code provisions.

General Info

Widen Avenue 50 to four lanes, build bridge, realign Tyler Street, install traffic signal, upgrade infrastructure in Coachella, CA.

Agency

California → City of CoachellaView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Coachella, CA, 92236, USA

Set-Aside

NONE

Documents

(1)

ST-69 Avenue 50 Bridge Improvement Project Notice Inviting Bids

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Coachella
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Coachella
View Agency Profile
Office AddressN/A
Contacts
Brianna GreenwoodConstruction Project Coordinator

Full Description

Show more
Bid #ST-69: The project consists of the realignment and widening of Avenue 50 from a two-lane roadway to a four-lane arterial facility. The work includes the construction of a new five-span bridge over the Coachella Valley Stormwater Channel (CVSC), realignment of Tyler Street, and installation of a new traffic signal at Avenue 50 and Tyler Street. Additional scope includes removal and reconstruction of Concrete Slope Protection (CSP), reconstruction of the CV/Link multimodal pathway, installation of new waterlines, concrete curb and gutter, hot mix asphalt paving, and all related traffic signs, pavement markings, and striping.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Coachella

Same awarding agency

NAICS: 237310
SLED
Avenida De Platina Neighborhood Pavement Rehabilitation Project
Solicitation # ST-135
The Avenida De Platina Neighborhood Pavement Rehabilitation Project involves the full removal of four inches of asphalt, aggregate base, and subgrade, followed by the placement of a new four-inch thick asphalt layer across the neighborhood. The scope extends to the removal and reconstruction of speed humps, upgrades to traffic signage and pavement striping, and the adjustment of manholes, cleanouts, and water valves to match the final grade. All work must be performed in a professional and workmanlike manner to the satisfaction of the City of Coachella. The project is governed by California state statutes rather than federal FAR clauses, requiring strict compliance with the Public Contract Code, Labor Code provisions including prevailing wage rates under Sections 1725.5 and 1771.1, and SB 854 mandates for electronic certified payroll submissions to the Department of Industrial Relations. Contractors must hold an active California license in Class A, C-32, or C-12 and be registered with DIR for the duration of the project. A 10% bid security in the form of cash, certified check, or bid bond is mandatory, and successful bidders must furnish performance and payment bonds each equal to 100% of the contract price, issued by a surety admitted in California. The contract will be awarded on a Lowest Price Technically Acceptable basis to the lowest responsive and responsible bidder who meets all legal, licensing, and bonding requirements. Performance is limited to 30 working days from the Notice to Proceed, with time being of the essence. All contract documents must be obtained through PlanIT Print Works, and sealed bids must be physically delivered to the City’s Engineering Office by 10:00 a.m. on August 19, 2026. No electronic submissions are permitted, and failure to comply with any mandatory requirement will render a bid non-responsive. The City of Coachella, through Leonard R. St. Sauver, serves as the primary point of contact for all project inquiries and oversight.
Highway, Street, and Bridge Construction

POSTED

23 days ago

DEADLINE

in 3 days
View Details