This Solicitation opportunity from California was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Avocado Heights San Jose Hills – Valley Boulevard

Closed
20260723029State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 9 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The project involves the reconstruction of approximately 2.5 miles of local roads along Valley Boulevard in the City of Industry and unincorporated areas of Avocado Heights and South San Jose Hills, with work extending to curb and gutter, medians, sidewalks, driveways, curb ramps, striping and pavement markings, traffic signal upgrades, removal of existing bollards, planters, and telephones within the public right-of-way, and installation of metal handrails. All work must comply with the Standard Specifications for Public Works Construction, 2021 Edition, and Caltrans Standard Plans, 2025 Edition, while adhering to environmental compliance requirements under Section EC, including emissions controls, Stormwater Pollution Prevention Plans, and CARB Executive Order certifications for all diesel-powered equipment. Performances must occur on-site or within 0.5 mile of the project limits, with a field office required to be located nearby, and completion must occur within 200 working days, with specific milestones such as 30 working days for intersection work. The award will be made to the lowest responsive and responsible bidder under a Lowest Price Technically Acceptable (LPTA) basis, with no value explicitly stated for the contract. Bids must be submitted electronically via BidExpress.com no later than 11:00 a.m. on August 18, 2026, with each file limited to 10 MB, and paper submissions are not accepted. All proposals must include mandatory forms such as the Bidder Information Sheet, Noncollusion Declaration, List of Subcontractors, Injury and Illness Prevention Plan Affidavit, CBE Participation Form, Criminal Convictions Certification, Debarments and False Claims Act disclosures, Labor Law/Payroll Violations forms, Zero Tolerance Policy on Human Trafficking Certification, Fair Chance Employment Certification, QSD/QSP Designation Form, and a Schedule of Prices. Contractors must demonstrate DBE and CBE participation goals, with a 25% CBE goal for non-federally funded contracts, and provide verified licensing and compliance with California Public Contract Code. Labor compliance requirements include prevailing wage adherence under California Labor Code, implementation of an Injury and Illness Prevention Program, jury service policy, and GAIN/GROW Program attestation. Legal obligations extend to notifying employees of the Newborn Abandonment Law and prohibiting campaign contributions to County officers for 12 months post-award. All inspections and final acceptance occur at the project site, governed by

General Info

Reconstruct 2.5 miles of roads in City of Industry with curb, sidewalk, signal upgrades, and handrail installation.

Place of Performance

Whittier, CA, 90601, USA

Set-Aside

NONE

Documents

3

ITB 04001 Avocado Heights San Jose Hills Road Reconstruction

PDF, High priority: read this firstitb
High

PLANS 04001 Avocado Heights San Jose Traffic Control and Construction Plans

PDF, High priority: read this firstspecifications
High

RMD1104001 Avocado Heights San Jose Hills - Notice Inviting Bids

PDF, High priority: read this firstnotice-inviting-bids
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Public Works
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Pre-Bid Questions Contact

Full Description

Show more
Bid #RMD1104001: The project involves the reconstruction of approximately 2.5 miles of local roads in the City of Industry and unincorporated areas of Avocado Heights and South San Jose Hills. The scope includes work on curb and gutter, medians, sidewalks, driveways, and curb ramps. It also encompasses striping and pavement markings, traffic signal upgrades, removal of existing bollards, planters, and telephones within the public right-of-way, and the installation of metal handrails.

More opportunities from California → Los Angeles County Public Works

Same awarding agency

NAICS: 237310
New
SLED
Hacienda Heights - Hacienda Boulevard Phase I
Solicitation # RMD1402001
Solicitation RMD1402001 is a project for the Los Angeles County Public Works agency involving roadway reconstruction and infrastructure improvements on Hacienda Boulevard in the unincorporated community of Hacienda Heights. The scope of work includes resurfacing, the installation of new bulb-outs, curb and gutter improvements, curb ramp installation, and sidewalk and driveway repairs. Additional requirements include tree removals, new median landscaping, signing and striping, continental crosswalks, and traffic loop restoration. The project is estimated to cost between 3.6 million and 5.3 million dollars and must be completed within 140 working days. The contract will be awarded to the responsible bidder with the lowest responsive bid. Bidders must submit proposals electronically via Bid Express and provide a bid bond equivalent to at least 10 percent of the contract price. Key requirements include a 25 percent goal for Certified Business Enterprise participation and adherence to prevailing wage determinations. Technical standards for the work are governed by the 2000 Los Angeles County Public Works Standard Plans, the 2021 Standard Plans for Public Works Construction, the 2024 Greenbook, and the 2025 Caltrans Standard Plans and Specifications. Specific material standards are mandated for signage, including the use of 6061-T6 or 5052-H38 aluminum alloy and hot-dipped galvanized steel for posts. Acceptance of detection systems requires a continuous quality of 98 percent or better over a seven-day period.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS