AWTP-(2) 1000 Hp Reservoir Vertical Turbine
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Macon Water Authority is soliciting sealed bids for the installation and replacement of two 1000 HP motors at the Amerson Water Treatment Plant Reservoir Pump Station in Macon, Georgia. This lump sum project requires the winning contractor to provide all labor, materials, and equipment, including crane services for the removal and replacement of the pump house roof and the transport of existing motors to on-site storage. Technical requirements include the provision and laser alignment of new couplings for each unit, all electrical disconnections and reconnections, and the installation of a vibration system. The contractor must also perform vibration analysis both before and after the motor installation. Eligible bidders must attend a mandatory pre-bid meeting on November 3, 2026, and submit all questions by November 9, 2026. Sealed bids are due by 2:00 P.M. on November 17, 2026. To be eligible, bidders must purchase the contract documents, hold a Utility Contractor License, and commit to self-performing at least 51 percent of the work. Bids must be accompanied by a bid bond for 10 percent of the bid amount, and the successful contractor will be required to provide performance and payment bonds each valued at 100 percent of the contract price. The project is expected to be completed within 180 consecutive calendar days from the effective date.
General Info
Place of Performance
Set-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- CBP#4282 Pump and Hydraulic System RepairsOpen now, due in 11 days
- Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)Open now, due in 12 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The Project consists of furnishing all labor, materials, equipment, tools and incidentals required for the installation (replacement) of two (2) 1000 HP motors at the Amerson Water Treatment Plant (AWTP) Reservoir Pump Station. Winning bidder must provide, install and laser-align the motors. Installation will include providing a crane, removing and replacing the pump house roof, existing motor removal and transport to on-site storage location, providing provisions for vibration detectors 90 degrees apart with ¼-28 UNF tapped hole to mount our sensors, providing (and laser aligning shafts) a new coupling for each unit, making all electrical disconnections and reconnections, installing a vibration system (and ensuring proper operation), performing vibration analysis before and after new motor installation, and all other tasks, requirements, and specifications outlined in the contract documents. The Owner reserves the right to reject any or all Bids. The Owner reserves the right to waive informalities and technicalities. The Macon Water Authority Michel Wanna Executive Director & President
More opportunities from Georgia → Macon Water Authority
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS