This Solicitation opportunity from Texas was posted on October 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Harris County is soliciting competitive sealed proposals for the turnkey modernization of one hydraulic elevator serving two floors at the Annex 9 Courthouse in Houston, Texas. With an estimated budget of $275,000, the project is expected to begin on January 17, 2027, and has a performance timeline of 180 calendar days. The scope of work includes upgrading to non-proprietary equipment, installing emergency lowering devices and pit flood alarms, and ensuring full compliance with ASME, ADAAG, and NFPA standards. Payments will be distributed based on a milestone schedule: 10 percent for design, 40 percent for manufacturing, 15 percent for delivery, 25 percent for substantial completion, and 10 percent for final operation.
Contractors must adhere to strict compliance and safety mandates, including the Harris County Contractor Minimum Wage Policy requiring a minimum wage of $21.65 per hour for eligible workers. Mandatory requirements include providing proof of Texas Workers Compensation coverage, maintaining minimum insurance limits, and submitting a safety record questionnaire regarding OSHA compliance. Bidders must also submit a compliant M/WBE Utilization Plan and Letters of Intent to meet established participation goals; failure to do so or provide documentation of good faith efforts will result in bid rejection. Additionally, a bid guaranty of 5 percent of the bid amount is required, with the successful awardee needing to provide a performance and payment bond within ten days of the award.
General Info
Harris County seeks proposals for Annex 9 Courthouse elevator modernization costing $275,000.
HighAI Summary for Addendum No. 1 - Job No. 26/0289 Annex 9 Courthouse Elevator Modernization: Addendum No. 1 issued October 23, 2026, for the Annex 9 Courthouse Elevator Modernization project (Job No. 26/0289). The document provides a comprehensive Q&A section addressing technical specifications, HUB goals, equipment details, and code compliance requirements. It establishes a submission deadline of November 9, 2026.
PDF
PDF, High priority: read this first6 pages · specifications
HighAI Summary for Annex 9 Courthouse Elevator Modernization Project Specifications: Technical specifications for a Harris County Competitive Sealed Proposal (CSP) regarding the turnkey modernization of one hydraulic elevator at the Annex 9 Courthouse. The scope includes upgrading to non-proprietary equipment, installing pit flood alarms, and emergency lowering devices. The document details site protection, material inventory, barricade installation, demolition requirements, and compliance with ASME, ADAAG, and NFPA standards. Project timeline is 180 calendar days.
PDF
PDF, High priority: read this firstbid-guaranty-performance-bond
HighAI Summary for Bid Guaranty and Performance Bond Requirements for Harris County: This document outlines the bid guaranty and performance/payment bond requirements for bidders submitting bids to Harris County. It specifies that a guaranty must be submitted with each bid, either as a bid bond or a bank cashier's check for 5% of the bid amount. The successful bidder must provide a performance/payment bond within ten days after contract award, executed by an authorized surety company. The bond amount equals the contract payment amount unless otherwise stated. Failure to submit the required bond documents within ten days may render the award ineffective. Verification of bond validity is required before payments are made.
PDF
PDF, High priority: read this first7 pages · rfp
HighAI Summary for General Requirements for Proposals - Harris County RFP Instructions: This document outlines the general requirements and instructions for proposals submitted to Harris County for advertised requests for proposals (RFPs). It includes critical information on access to records, ACH vendor payment, addenda, assignment restrictions, award criteria, bond requirements, certification of interested parties (Form 1295), debarment and suspension certifications, compliance with federal, state, and local laws, ethical conduct reporting, contract obligations, renewals, and transition procedures. The document emphasizes the responsibility of vendors to understand and comply with all specifications and legal requirements. It serves as a foundational guide for vendors responding to Harris County solicitations, ensuring adherence to procedural and legal standards.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for General Requirements for Proposals - Texas Workers' Compensation Coverage: This document outlines mandatory requirements for contractors and subcontractors regarding Texas Workers' Compensation coverage for building or construction contracts. It defines key terms such as certificate of coverage and duration of the project, and specifies the contractor's obligations to provide and maintain coverage for all employees providing services on the project. The document details the need for certificates of coverage before contract award, during the project, and retention of these certificates for one year after project completion. It also mandates notification procedures for changes affecting coverage and requires posting notices at project sites. The contractor must ensure all subcontractors comply similarly. Non-compliance constitutes a breach of contract, allowing the governmental entity to void the contract if not remedied within ten days.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County Contractor and Worksite Safety Policies (Amended 8.6.26): This document outlines the safety record and worksite safety policies for construction projects contracted by Harris County, Texas. Amended August 6, 2026, it establishes certification requirements, scope of applicability for prime and subcontractors, and the use of Safety Record Questionnaires to evaluate contractor safety records during the award process.
PDF
PDF, High priority: read this first5 pages · wage-determination
HighAI Summary for Harris County Contractor Minimum Wage Policy FAQ: An FAQ document detailing the Harris County Contractor Minimum Wage Policy. It establishes a minimum wage of $21.65 per hour for workers on eligible contracts solicited after October 1, 2025, with annual adjustments based on the MIT Living Wage Calculator. The policy applies to contracts valued over $100,000, with specific exemptions for sole source, emergency, and certain professional services. It outlines compliance requirements, including self-certification and record-keeping, and specifies that the highest applicable wage (including Davis-Bacon or prevailing wages) must be paid.
PDF
PDF, High priority: read this first5 pages · special-notice
HighAI Summary for Harris County Contractor Minimum Wage Policy FAQ December 2025: This document is the Harris County Contractor Minimum Wage Policy FAQ as of December 2025. It explains the policy establishing a minimum wage of $21.65 per hour for workers on eligible Harris County contracts solicited after October 1, 2025, with annual adjustments based on the MIT Living Wage Calculator. The FAQ covers who is covered, wage applicability, exemptions, compliance requirements, reporting violations, and how the policy interacts with prevailing wage laws and federally funded contracts. It also details enforcement actions and vendor notification procedures.
PDF
PDF, High priority: read this firstgeneral-conditions
HighAI Summary for Harris County General Conditions for Building Construction and Related Work - August 4, 2025: This document titled 'General Conditions for Building Construction and Related Work & Roads, Bridges and Related Work' dated August 4, 2025, issued by Harris County, outlines the contractual terms and conditions governing building construction projects. It includes definitions of terms, preliminary matters, payment procedures, schedule and completion requirements, change orders, warranties, contractor responsibilities, indemnification, insurance, regulatory requirements, materials inspection, subsurface conditions, termination clauses, dispute resolution, and additional legal provisions. The document serves as a foundational contract component detailing the rights, duties, and obligations of the contractor and county for construction and related work projects.
PDF
PDF, High priority: read this first6 pages · rfp
HighAI Summary for Harris County Job No. 26/0322 Special Requirements/Instructions: This document outlines the special requirements and submission instructions for a Competitive Sealed Proposal (CSP) issued by Harris County (Job No. 26/0322). It specifies a five-section proposal format including a transmittal letter, scope of service narrative, pricing information (including bid bond requirements), organizational qualifications, and miscellaneous exceptions. The procurement is governed by Texas Government Code §2269, utilizing a best-value selection process.
PDF
PDF, High priority: read this first9 pages · specifications
HighAI Summary for Harris County Minimum Insurance Requirements (2026): This document outlines the minimum insurance requirements for contractors performing work for Harris County. It specifies mandatory coverage and limits for Workers’ Compensation, Commercial General Liability, Business Automobile Liability, and Pollution Liability, including required ISO forms, endorsement requirements, and subrogation waivers.
PDF
PDF, High priority: read this first6 pages · wage-determination
HighAI Summary for Harris County Minimum Wage Policy for Contract Workers: This policy document establishes a minimum wage floor of $21.65 per hour (adjusted annually via the MIT Living Wage Calculator) for workers on contracts solicited by Harris County on or after July 1, 2025. It applies to prime contractors and all tiers of subcontractors, with specific exemptions for interlocal agreements, sole source contracts, emergency contracts, and contracts valued under $50,000 per year.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County M/WBE Goal Participation and Utilization Plan: This document outlines the Minority- and Woman-Owned Business Enterprise (M/WBE) participation requirements for Harris County procurements (Rev. 12/2025). It details the mandatory submission of an M/WBE Utilization Plan, the criteria for 'Significant Local Presence,' and the definition of 'Commercially Useful Function.' It includes a tip sheet for bidders to ensure compliance and lists accepted certifying agencies.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County M/WBE Special Requirements and Utilization Plan Tip Sheet: This document outlines the Minority- and Woman-Owned Business Enterprise (M/WBE) goal participation requirements for Harris County procurements (Rev. 12/2025). It specifies the necessity of a compliant M/WBE Utilization Plan, the requirement for 'Significant Local Presence', and the criteria for 'Commercially Useful Function'. It includes a tip sheet for bidders on how to submit a compliant plan, including required certifications and Letters of Intent.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Harris County M/WBE Utilization Commitment Form and Plan: This document is a Minority- and Woman-Owned Business Enterprise (M/WBE) Utilization Commitment Form and Plan for Harris County. It requires bidders to commit to specific M/WBE participation goals, provide a detailed utilization plan, disclose certified subcontractors, and document good faith efforts if goals are not met.
PDF
PDF, High priority: read this firstsafety-record-questionnaire
HighAI Summary for Harris County Safety Record Questionnaire for Prime Contractors: This document is the Safety Record Questionnaire for Prime Contractors bidding on Harris County construction or maintenance projects valued at $500,000 or more. It requires certification of compliance with OSHA regulations and safety policies, including no severe violations, sanctions, or criminal offenses related to workplace safety within specified timeframes. Contractors must confirm that employees have OSHA 10 or OSHA 30 certifications and that subcontractors meet the same safety requirements. The form must be submitted with the bid and includes a certification section for the prime contractor to attest to the accuracy and completeness of the information. Failure to comply or provide truthful answers results in bid disqualification for this project.
PDF
PDF, High priority: read this firstsafety-record-questionnaire
HighAI Summary for Harris County Safety Record Questionnaire for Subcontractors: This document is the Safety Record Questionnaire for Subcontractors required by Harris County for construction and related projects with contract values of at least $500,000 (or $50,000 for subcontracts). It includes multiple certifications regarding OSHA violations, safety training certifications (OSHA 10 and OSHA 30), and criminal convictions related to workplace incidents. Subcontractors must submit this questionnaire to the prime contractor with their bids, certifying the truthfulness of their safety records. The document outlines the requirements, certifications, and consequences of false statements, emphasizing compliance with the County's Safety Record Policy. It also includes a formal certification section to be signed by an authorized representative of the subcontracting entity.
PDF
PDF, High priority: read this first4 pages · amendment
HighAI Summary for Job No. 26/0289 Annex 9 Courthouse Elevator Modernization - Addendum No. 1: Addendum No. 1 dated October 23, 2026, for the Annex 9 Courthouse Elevator Modernization project (Job No. 26/0289). The document provides a detailed Questions and Answers section addressing technical specifications, including HUB goals, equipment capacities, machine room requirements, fire alarm modifications, and the use of non-proprietary components. It establishes a submission deadline of November 9, 2026.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Job No. 26/0289 Annex 9 Courthouse Elevator Modernization Project - Addendum No. 2: Addendum No. 2 issued on October 23, 2026, for the Annex 9 Courthouse Elevator Modernization Project (Job No. 26/0289). This document provides revised specifications for Section 11 regarding the Payment Schedule, detailing a milestone-based payment structure (10% design, 40% manufacturing, 15% delivery, 25% substantial completion, and 10% final operation). It also outlines warranty requirements and post-completion support. Bids are due by November 9, 2026.
PDF
PDF, High priority: read this first9 pages · supporting-documents
HighAI Summary for M/WBE Utilization Commitment Form and Plan: A Harris County procurement form (Rev. 12/2025) requiring bidders to commit to Minority and Woman-Owned Business Enterprise (M/WBE) participation goals. It includes a commitment statement, a detailed utilization plan for tracking certified subcontractors, and requirements for documenting Good Faith Efforts if goals are not met.
PDF
PDF, Low priority1 page · other
LowAI Summary for Bid Bond and Bid Check Authorization Form: This document is the Bid Bond Confirmation and Bid Check Return Authorization Form for Harris County. It outlines the procedures for submitting a cashier's check in lieu of a bid bond through Bonfire, including physical drop-off instructions and requirements for the bid check amount and payee. The form includes sections for bid bond and cashier's check details, as well as bidder contact information. It also explains the conditions under which bid checks are retained or returned by the County Clerk or Office of the Purchasing Agent. The form authorizes Harris County to return bid checks via regular mail under specified conditions. The document is intended for use by bidders and county officials managing bid check processing.
PDF
PDF, Low priorityacknowledgment
LowAI Summary for Competitive Sealed Proposal Acknowledgment: This document is a Competitive Sealed Proposal (CSP) Acknowledgment form. It requires a corporate officer, partner, or proprietor to certify that the proposal is made without collusion or fraud and that they understand and agree to abide by all conditions of the CSP. The form includes fields for project job number, project description, authorized signature, representative name, company details, and contact information. It is intended for use in the proposal submission process to affirm the integrity and accuracy of the proposal.
PDF
PDF, Low priorityother
LowAI Summary for Harris County M/WBE Trucking Procedure Compliance Guidance: This document from the Harris County Department of Economic Equity and Opportunity outlines the procedures and requirements for M/WBE trucking firms to comply with contract goals. It details responsibilities such as ownership and operation of trucks, exclusive use and control, subcontracting rules, leasing arrangements, and required submittal documentation including W-9, insurance, and proof of ownership. The document also provides information on courtesy utilization plan reviews and contact details for further questions. The purpose is to ensure Commercially Useful Function (CUF) and proper credit toward M/WBE participation goals.
PDF
PDF, Low priority1 page · other
LowAI Summary for Harris County Tax Form/Debt/Residence Certification for Advertised Projects: This document is a tax form, debt, and residence certification for advertised projects in Harris County, Texas. It collects taxpayer identification, company information, taxable property details, any debts owed to Harris County, and certifies bidder residency status pursuant to Texas Government Code §2252.001. The form is intended to verify compliance with state residency requirements and disclose any outstanding county debts relevant to contracting.
PDF
PDF, Low priority1 page · special-notice
LowAI Summary for Heat Protection Safety Requirement Guidance: This document provides guidance on heat protection safety requirements for workers during adverse weather conditions, including extreme heat and cold. It mandates that the project Safety Plan include provisions to prevent heat and cold-related illnesses, with specific measures such as a Heat Awareness Plan when temperatures exceed 90 degrees. The Prime Contractor must provide necessary accommodations during extended adverse weather. Vendors agree to comply by signing the Competitive Sealed Proposal Acknowledgement.
PDF
PDF, Low priority1 page · subcontractor-listing
LowAI Summary for Subcontractor Listing Form for Harris County Contract: This document is a Subcontractor Listing Form for a Harris County contract. It requires the contractor to provide details about any potential subcontractors, including company name, industry, DUNS number, principal name, contract value, contract duration, certification status, and description of work. The form also includes a declaration for contractors not subcontracting any portion of the contract. The contractor must ensure subcontractors are properly licensed and approved by the County. A final listing is required prior to contract award, with updates submitted if changes occur during the contract term.
Project involves turnkey modernization of one (1) hydraulic elevator serving two floors at Annex 9 Courthouse located at 1001 S. Sgt Marcario Garcia Dr., Houston, TX 77011. This project is estimated to begin January 17, 2027
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.