Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B-2 Engine Auxiliary Inlet Door (EAID) PBL

Closed
SPRHA1-26-R-B2EAIDFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336413
New
DIBBS
INDICATOR, BYPASS
Solicitation # SPE4A7-26-R-0755
Solicitation SPE4A7-26-R-0755 is a sealed bid for a Firm Fixed Price, Indefinite Quantity Contract (IQC) issued by DLA Aviation for the procurement of Bypass Indicators (NSN 2915-01-313-4615). The contract encompasses a five-year base period with a guaranteed minimum quantity of 20 units and an estimated annual requirement of 80 units. This item is designated as an Air Force Critical Safety Item (CSI) and is source-controlled, requiring manufacture and testing in accordance with specific limited rights data and basic drawing 99167 5907808. Due to the proprietary nature of the technical data package, only vendors with existing access to the data or traceability to approved sources are eligible to quote. The contract mandates strict quality and security compliance, including SAE AS9100 higher-level quality requirements and Cybersecurity Maturity Model Certification (CMMC) Level 2. Inspection and acceptance are conducted at the origin, with sampling performed according to MIL-STD-1916 or ASQ H1331, requiring zero non-conformances for acceptance. Packaging must adhere to MIL-STD-2073-1E and RP001, while marking must comply with MIL-STD-129, including the contractor and manufacturer CAGE codes and part numbers. Delivery is specified as FOB Destination with a lead time of 308 days after receipt of order. Award determination will be based on a comparative assessment of price, past performance, and other evaluation factors, with SPRS assessments weighted most heavily within the past performance category.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 14 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The U.S. Air Force, through the 423rd Supply Chain Management Squadron and the 429th Enterprise Commodity Council, is pursuing a Performance-Based Logistics (PBL) strategy to sustain the Engine Auxiliary Inlet Door (EAID) system on the B-2 Spirit bomber through 2058. The EAID is a critical component that manages boundary layer air intake to preserve engine efficiency and maintain the aircraft’s low-observable characteristics, and current supply chain and depot repair constraints have caused a complete deferral of mandatory replacement tasks since 2019. This initiative aims to eliminate these delays by establishing a long-term, fixed-price contract with a ten-year duration—five years base plus a five-year option—managed by a single product support integrator. The strategy prioritizes outcomes over inputs, using Key Performance Indicators such as Material Availability, Reliability, and On-Time Delivery, with payments potentially indexed to operational metrics like flying hours or landings rather than unit repairs. The contract will require full transparency of Air Force demand data, comprehensive Bill of Material accuracy, and proactive management of Diminishing Manufacturing Sources and Material Shortages through the development of new, engineering-approved supply sources. Northrop Grumman Corporation, as the original equipment manufacturer, is being consulted to shape this strategy, with expectations for deep involvement in engineering support, tooling restoration, and process innovation. The approach integrates public-private partnerships, technology insertion, reliability-centered maintenance, and depot workforce preservation to enhance throughput at the Ogden Air Logistics Complex. The contractor must ensure complete material support for all AF/DLA-managed items, update technical data and repair procedures, and facilitate First Article Testing through approved facilities—either USAF, third-party, or manufacturer sites with DCMA oversight. The solicitation emphasizes long-term pricing stability and seeks industry input on performance measurement structures, incentive schemes, and methods to broaden the supplier base and mitigate obsolescence risks. All responses are due by email to the contracting officer and program manager by July 22, 2026, with no formal contract clauses, pricing data, packaging requirements, or evaluation weighting details yet finalized—these will be determined based on industry feedback gathered through this request for information. The ultimate goal is to achieve sustained mission readiness by aligning contractor incentives with warfighter outcomes, ensuring the EAID remains fully supportable across the B-2’s extended service life.

General Info

Long-term PBL contract to ensure B-2 EAID readiness through 2058 with performance-based metrics and Northrop Grumman collaboration.

Agency

Department Of Defense → Ut DLA Aviation At Ogden

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment ManufacturingView NAICS

Place of Performance

UT

Set-Aside

NONE

Documents

(1)

NSN and NIIN Part Number Listing

XLSXother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Ut DLA Aviation At Ogden
Contacts2 people available
OfficeHILL AIR FORCE BASE, UT, 84056-5820, USA
Organization / Agency
Department Of Defense → Ut DLA Aviation At Ogden
Office AddressHILL AIR FORCE BASE, UT, 84056-5820, USA
Contacts
Justin Rogers
Nathan Flinders

Full Description

Show more

Program: B-2 Main Engine Auxiliary Inlet Door (EAID) Performance Based Logistics (PBL) Strategy


Organization: 423rd Supply Chain Management Squadron (SCMS), and 429 SCMS/Enterprise Commodity Council (ECC)


Scope


The ECC has developed a Cross-Functional Team (CFT) comprised of members of the 423rd SCMS, B-2 AFLCMC Program Office, and 531 CMXG squadron. The B-2 EAID team is seeking information towards developing a PBL support strategy to improve supply chain efficiencies, material availability, and supplier base of the B-2 EAID and its subcomponents. The CFT plans to utilize Key Performance Indicators (KPI) to measure Contractor performance to meet critical goals in support of the warfighter mission.


Background


The EAIDs are vital components of the B-2 Spirit and are used to prevent air flow separation to reduce power loss at low aircraft speeds. Ahead of each air intake inlet is a serrated slit-like auxiliary inlet which removes the turbulent boundary layer air, preventing it from entering the engine. This boundary layer air is then mixed with the exhaust to cool its temperature and reduce the infrared signature of the aircraft, part of its low observable system. The B-2 is a multi-role, long-range, high-altitude bomber, capable of flying intercontinental missions without refueling, then penetrating present and predicted sophisticated enemy defenses.


Current EAID end-item depot activation and repair constraints are impacting 100% of scheduled aircraft Program Depot Maintenance (PDM). A 100% PDM task to replace EAIDs with serviceable assets was signed in 2017 but has been deferred since 2019. The B-2 Spirit is scheduled to be in service through 2058.


Developing Strategy


The objectives of this PBL contract are to: (1) improve and sustain readiness; (2) Improve piece part supportability; (3) Activate, increase throughput, and maximize capability within the OO-ALC depot; (4) Improve demand planning and forecast collaboration, and (5) Gain increased OEM end item and tooling engineering support.


Under a performance-based approach, end-item sustainment is managed through integrated packages driven by output performance metrics (availability and reliability) rather than input-based measures. To establish clear accountability, this strategy will be structured under a single product support integrator. Flexible sustainment that incorporates direct vendor delivery, technology insertion, reliability-centered maintenance, process improvement engineering, and public/private partnering will be needed to achieve mission support objectives outlined above.


It is anticipated the performance-based support and measurement will be tracked on an end-item level to include 100% of the material needed to successfully overhaul each B-2 EAID end-item.


The CFT seeks to develop a contract that will support the following strategic requirements:


  • Complete material support for AF/DLA managed items
  • 10-year Long-Term Contract (LTC), fixed price agreement (five-year base with one five-year option)
  • Develop and maintain an accurate Bill of Material (BOM)
  • OEM Engineering, technical, and tooling support
  • Specific incentives/disincentives applied to OEM performance
  • Enhanced and preserved depot workforce
  • Full transparency of AF demands and depot repair requirements
  • Update technical data procedures and specifications
    • Improve repair/testing processes
    • Repair and restore tooling
  • Improved demand planning & forecast collaboration
  • Increased end-item availability and reliability
  • Increase potential vendor base to alleviate DMSMS constraints

As part of this requirement, it is expected the Contractor will accept the responsibility of identifying and developing new (AF engineering approved) sources of manufacture and working with the 423rd SCMS, B-2 AFLCMC Program Office, and 531 CMXG maintenance squadron to ensure all parts are available upon demand.


The CFT is asking for feedback from the OEM, Northrop Grumman Corporation (NGC), representatives regarding the performance-based support for the B-2 EAID and components through the construct of a US Air Force (USAF)/DLA contractual relationship. The CFT is looking to NGC to help shape the strategy of this effort through their open comments/feedback on the topics/questions below.


Questions:


  1. Please provide the following business information for your company and for any teaming and joint venture programs:
    1. Company Name
    2. Address
    3. Point of Contact
    4. Cage Code
    5. Phone Number
    6. E-mail Address
    7. Web Page URL
    8. Size of Business and North American Industry Classification (NAICS) Code
  2. What is your experience in identifying DMSMS issues and what solutions can you implement to improve the availability of engineering approved manufacturing sources?
  3. What rights to technical data does your company possess regarding the manufacture or repair of the attached NSN list?
  4. Does your company have repair capability for the population of NSNs (see attachment) associated with this program, or are third parties used? If so, what level of rights is given to other companies?
  5. A potential piece of this program is to establish some level of a Public Private Partnership (PPP). What experience do you have with PPPs, and how can that experience assist in providing solutions to the B-2 EAID issues described above?
  6. To help alleviate current overhaul issues, what solutions do you recommend implementing to increase the successful throughput and repair of B-2 EAID end-items?  How do you anticipate maintaining the health of the tooling on a long-term basis?
  7. How many suppliers/manufacturers does your company purchase B-2 EAID parts from?
    1. How many of these suppliers/manufactures have long-term supply agreements with your company?
    2. What is the average lead-time with these suppliers?
  8. What is your current process for forecasting demand to ensure parts availability?
  9. What do you see as the major concerns for this performance-based effort, and do you have recommendations for mitigation of those concerns?
  10. Do you prefer contracts with award terms or option years?
    1. Would you manage your business differently based on one or the other? Explain.
  11. The current Contractor performance metrics under consideration are Material Availability, Reliability, and On Time Delivery to Customer.
    1. What are your thoughts on the considered Contractor performance metrics?
    2. Would industry suggest additional metrics or a different group of metrics? Please explain.
  12. What commercial best practices and/or depot process improvements do you feel could be incorporated in a performance-based strategy such as this?
  13. Some items may require First Article Testing (FAT) be completed at the USAF testing facility.
    1. What are the perceived risks with utilizing USAF facilities for FAT evaluations?
    2. What are your thoughts on the ability to utilize third party FAT facilities?
    3. What are your thoughts on the ability to utilize manufacturing FAT labs with government oversight (DCMA)?
    4. What suggestions can you provide to improve the FAT evaluation process and how the suggestion will affect risk associated with using USAF facilities or non-USAF facilities?
  14. Is long-term pricing feasible for this effort? If not, what are the constraints hindering long-term pricing? Are there ways to mitigate these constraints?
  15. Is NGC currently involved with any strategic type arrangements (Government or Commercial) that are outcome based as opposed to traditional type manufacture/remanufacture (eaches) contracts? If so, can you provide high-level details as to how the contract is structured (i.e. length, payment approach, performance measurements, etc.)?
  16. Under most performance-based strategies, payment is not tied to the traditional support of NSNs by “eaches” and is typically indexed to applicable operational activities such as flying hours, landings, demand bands, etc. What is NGC position on using aircraft flying hours and/or other B-2 operational activities to index payment to and what are the risks (if any)? Is NGC aware of any other operational activities in which payment could be indexed to? If yes, please explain.
  17. In the past, AF performance-based contractual payment structures have been designed to calculate the contract year’s total payment to the Contractor and then divide that total into periodic payments. What is NGCs position/thoughts on periodic payments received throughout the year for Contractor support and what are the pros/cons associated with that payment structure?

The government is accepting responses to this request for information via email only. Please provide written responses to the Contracting Officer and Program Manager by 22 July 2026 at the following email addressed:



Justin Rogers


Contracting Officer


justin.rogers.28@us.af.mil



David Olson


Lead Program Manager


david.olson.25@us.af.mil


Attachments:


  1. B2 EAID Identified Parts List

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS