Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on September 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B-21: Squadron Ops/Bomber Generation Squadron, Dyess AFB, Texas

Closed
W9126G27R1CLVFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the project requires a full NFPA-compliant fire suppression system, replacement of electrical distribution and lighting, building automation controls, and site improvements including paving, drainage, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Award is based on the lowest price. Bidders must adhere to strict quality control standards, including a three-phase control process and specific certifications for welding and protective coatings. Compliance with the Davis-Bacon Act, the Buy American statute, and ADA accessibility guidelines is required. Invoicing must be processed through Wide Area WorkFlow with supporting NAVFAC documentation. Bonding requirements vary by proposal value, with bid, payment, and performance bonds required for proposals exceeding 150 thousand dollars.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
This Design-Build project involves the renovation and modernization of Facility #6594 (Transfer Facility) at SWFPAC Bangor, Washington, with an estimated project magnitude between $10 million and $25 million. The scope of work includes the demolition and replacement of deteriorated components and the construction of an approximately 400 square foot addition for forklift battery charging operations. A critical operational constraint requires the facility to remain mission-capable throughout the project, necessitating a two-phase construction approach with multiple mobilization and demobilization cycles. Phase 1 encompasses all primary renovation work and the completion of design documents for both phases, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contract is awarded based on price and MACC past performance, with a strict performance schedule requiring work to commence within 15 calendar days of award. The Base Bid (CLIN 0001) must be completed within 360 calendar days, and the Option (CLIN 0002) within 1082 calendar days, with liquidated damages applied for delays. Key requirements include compliance with the Davis-Bacon Act for certified payrolls, strict cybersecurity standards (NIST SP 800-171), and the provision of performance and payment bonds. Acceptance is contingent upon joint preliminary inspections and specialized testing for sound attenuation and electronic security systems.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring interior spaces damaged by water intrusion to return them to safe residential use. The scope of work includes repairs to sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas, specifically involving drywall installation, joint finishing, and painting for approximately 300 square feet of floor area. The contractor is responsible for all labor, materials, and equipment, including the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. Awardees must provide payment and performance bonding for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon successful system testing, debris removal, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 8 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Fort Worth District, is conducting market research via a Sources Sought notice to gauge industry interest and capability for the construction of a combined Squadron Operations and Bomber Generation Squadron Facility at Dyess Air Force Base, Texas. This FY 2029 MILCON project supports the B-21 program and consists of approximately 167,164 gross square feet, including a 108,339 square foot high bay maintenance hangar and a 58,825 square foot squadron operations facility. The project has a target fixed budget of 164,651,000 dollars, which includes a 5 percent contingency, with a total programmed amount of 177,000,000 dollars. The scope encompasses site preparation, utilities, roadways, and a 588-ton HVAC system, utilizing a structural steel frame and reinforced concrete drilled pier foundations to address local expansive soils. The government is evaluating various procurement paths, including Other Transaction Agreements, Progressive Design-Build, Construction Management at Risk, and Design-Build to Budget, with the ultimate goal of a fixed-price contract. The project must adhere to DoD Unified Facilities Criteria 1-200-01 and anti-terrorism standards per UFC 4-010-01, while incorporating ICD 705 Premium requirements and cybersecurity for facility control systems. The anticipated period of performance is 1,095 calendar days from the notice to proceed, with a required beneficial occupancy date of April 30, 2032. A two-phase selection process is planned, focusing first on technical capability, past performance, and collaborative history, followed by an evaluation of final technical and price proposals.

General Info

USACE seeking contractors for B-21 facility construction at Dyess AFB, budget 177 million.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Dyess AFB, TX, 79607, USA

Set-Aside

NONE

Documents

1
DOCX, High priority: read this firstrfi
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Ft Worth
Contacts2 people available
OfficeFORT WORTH, TX, 76102-6124, USA

Full Description

Show more

SUBJECT: Sources Sought Notice/RFI – B-21: Squadron Ops/Bomber Generation Squadron, Dyess AFB, Texas


DISCLAIMER: This Sources Sought (SS) is for planning and market research purposes only and does not constitute a Request for Proposals (RFP) or an Invitation for Bids (IFB). This notice is issued under the authority of 10 U.S.C. § 2808a (Other Transaction Authority for Construction and Repair) and is not subject to the Federal Acquisition Regulation (FAR). No solicitation is available at this time. The Government will not pay for any information submitted in response to this notice.


PURPOSE: The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection.


PROJECT DESCRIPTION


This project will construct a combined Squadron Operations and Bomber Generation Squadron Facility at Dyess Air Force Base, Texas, approximately 167,164 gross square, to support the B-21 program, with an estimated Construction Cost Limitation (CCL) of $164,651,000. A portion of this facility will be two-story construction while the remaining portion will be a high bay maintenance hangar. Construction includes reinforced concrete drilled pier foundation, structural steel frame, masonry and insulated metal panel walls, standing seam metal roof and interior finishes. Special foundation structures due to local expansive soils. Site preparation includes site grading, construction site establishment, demolition of existing pavements and demolition of underground utilities within the site. Site improvements include earthwork landscaping, concrete pads and other exterior appurtenances. Utilities include domestic and fire protection water, electrical, sanitary sewer, storm water, natural gas and communications systems, and a 588-ton HVAC capacity. Roadways, Sidewalks and Parking includes new access drives, sidewalks, truck unloading area, Government Owned Vehicle parking areas and Personally Owned Vehicle parking lots.


Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense anti-terrorism/force protection requirements per Unified Facility Criteria 4-010-01, DoD Minimum Anti-terrorism Standards for Buildings.


INSTRUCTIONS TO INDUSTRY


  1. Review Attached Project Information Packet (PIP):
    Interested firms are directed to review the attached document. This packet provides comprehensive project requirements, constraints, and the complete questionnaire reference.
  2. Submit Responses via Microsoft Forms:
    To streamline the collection and analysis of industry feedback, responses to the market research questionnaire must be submitted electronically via the following link:
    Online Feedback Form: https://forms.osi.apps.mil/r/rvvBByEVkA
  3. Response Due Date:
    All electronic responses must be submitted via the online form no later than October 6, 2026, at 2:00 PM Central Time (CT).

POINTS OF CONTACT


Contract Specialist: Christopher R. Preston II, Sign up to see this detail, Sign up to see this detail.


Contracting Officer: Dianne K. Grimes, Sign up to see this detail, Sign up to see this detail


More opportunities from Department Of Defense → W076 Endist Ft Worth

Same awarding agency

NAICS: 236220
New
Federal
91st Cyber Operations Center – Progressive Design-Build Other Transaction Agreement
Solicitation # W9126G27QA008
The U.S. Army Corps of Engineers, Fort Worth District, is soliciting a Design-Build Team for the construction of the 91st Cyber Operations Center at Joint Base San Antonio, Lackland Air Force Base, Texas. This mission-critical project involves the design and construction of an approximately 42,000-square-foot multi-story facility featuring command-and-control spaces, watch floors with raised access flooring, and ICD 705-accredited secure areas. The project includes comprehensive site development, privatized utilities, communications infrastructure, and two backup generators. The total program funding is capped at 96 million dollars. The acquisition utilizes a Progressive Design-Build delivery model executed under an Other Transaction Agreement pursuant to 10 U.S.C. 2808a. The project is divided into two phases: Phase 1 focuses on design and pre-construction services to refine requirements and validate costs, while Phase 2 consists of construction packages for site/civil work and final building construction. Selection is based on a two-step, qualifications-based process involving the submission of a white paper and subsequent pitch meetings. Evaluation factors include team experience, collaborative approach, and project innovation, with a strict go/no-go requirement for a single-project bonding capacity of at least 96 million dollars. Compliance requirements include adherence to Intelligence Community Directives 503/705, Unified Facilities Criteria, and the Cybersecurity Maturity Model Certification program. The project is subject to the Davis-Bacon Act and Buy American Act requirements. White papers must be submitted as a single searchable PDF by November 17, 2026, at 1400 Central Time, adhering to strict page limits and formatting guidelines.
Commercial and Institutional Building Construction

POSTED

about 19 hours ago

DEADLINE

in 5 days
View Details
NAICS: 113310
New
Federal
Invitation for Bids, Camp Navajo, Arizona, Salvage Contract
Solicitation # DACA63-9-26-0522
Solicitation DACA63-9-26-0522 is an Invitation for Bids issued by the Fort Worth District of the U.S. Army Corps of Engineers for a salvage contract involving the purchase and removal of Ponderosa Pine timber at Camp Navajo, Arizona. The property is sold on an as is and where is basis, requiring the successful bidder to provide all necessary labor, equipment, and supplies for harvesting and removal at their own expense. Bids are evaluated based on the per unit bid price and must be accompanied by a 1,000 dollar deposit. The contract requires the purchaser to begin operations within ten days of a written notice to proceed, with all designated timber removed by September 30, 2028. Operational requirements include mandatory Munitions of Explosive awareness and Cultural Resources training for personnel, as well as strict adherence to environmental protections to minimize stream pollution. Equipment must meet safety standards, including the use of mufflers or spark arresters and compliance with Arizona state trucking laws. The government prohibits the possession of marking equipment on the reservation to ensure the integrity of the Installation Forester's designations. Bidders must also provide a small business status certification if the estimated value exceeds 2,000 dollars and may provide a performance bond for 100 percent of the performance deposits to cover potential damages or defaults.
Logging

POSTED

7 days ago

DEADLINE

in 26 days
View Details
NAICS: 113310
New
Federal
Invitation for Bids, Camp Navajo, Arizona, Lump Sum Contract
Solicitation # DACA63-9-27-0509
The United States Army Corps of Engineers, Fort Worth District, is soliciting bids for a lump sum contract for the purchase and removal of Ponderosa Pine timber located at Camp Navajo, Arizona. Under solicitation DACA63-9-27-0509, the selected purchaser must harvest and remove all designated timber by December 31, 2029. The project requires strict adherence to marking guidelines, where unmarked trees are to be cut, while yellow or orange paint indicates leave trees and white paint or flagging designates avoidance areas. Performance standards require pine sawtimber to be utilized to a 6-inch top diameter inside bark, with stumps cut as low as practical and no higher than 12 inches on the uphill side. Bids must be submitted in sealed envelopes by 11:00 AM local time on December 9, 2026, and must include a bid deposit of $10,000, split equally between a performance deposit and pre-paid timber. Contractors must comply with all federal and state environmental regulations and Camp Navajo access rules, including providing employee identification and ensuring all internal combustion equipment is fitted with mufflers or spark arresters. The contract allows for termination for convenience by the Real Estate Contracting Officer with ten days' notice, and any factual disputes will be decided by the same officer. Bidders must also provide a Corporate Certificate and a Certificate as to Small Business Status if the estimated value exceeds $2,000.
Logging

POSTED

7 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS