Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

B221 Substation Switchgear Replacement

Active
b221-substation-switchgear-replacement

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Sauer Construction is soliciting bids for the B221 Substation Switchgear Replacement project located in Texas. This contract focuses on essential electrical upgrades and includes necessary architectural improvements to support the infrastructure. The opportunity is designated as a set-aside for various small business categories, including Small Disadvantaged, Women-Owned, HUBZone, and Veteran-Owned Small Businesses. Interested parties must submit their responses by October 15, 2026, and can coordinate with the primary point of contact, Adam Houck.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySauer Construction
Contacts1 person available
OfficeN/A
Organization / AgencySauer Construction
Office AddressN/A
Contacts

Full Description

Show more
Electrical upgrades, project includes architectural improvements.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems including desiccant dehumidifying equipment and a dry pipe fire suppression system. The facility will also be solar-ready, featuring conduit installed below the roof structure for future photovoltaic panels. The estimated project magnitude is between 1 million and 5 million dollars, with a statutory cost limit of 5 million dollars. The contract will be awarded as a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical requirements include a task-oriented project schedule with a completion date no later than 360 days after the Notice to Proceed and the submission of qualifications for key personnel. Performance must adhere to strict standards, including UFC 3-600-01 and NFPA 13 for fire protection, and the 2021 International Building Code for structural foundations. The contractor is responsible for all site clearing, grade work, and erosion control, with final acceptance subject to USACE Material Testing Center validation. All offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a Membrane Bioreactor (MBR) system, UV disinfection, SCADA, and support buildings; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. The total duration for completion is 915 calendar days, and the existing plant must remain operational during the first two phases of construction. Managed by C. Overaa & Co., this solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and SDB. Bids are due by October 28, 2026, following a mandatory pre-bid meeting on October 5, 2026. Key requirements for subcontractors include the use of the Textura electronic invoicing system, adherence to Overaa standard agreements, and the provision of a 100 percent faithful performance and labor bond. Additionally, the project emphasizes local hiring, seeking a workforce where 50 percent of labor hours are performed by residents of Monterey, San Benito, and Santa Cruz counties, while encouraging participation from DBE, DVBE, MBE, WBE, and SBE firms.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
SLED
Conner Lab Corridor Structural Improvement - FDACS Project No. 1116
Solicitation # ITB DOA 26 27 40
The Florida Department of Agriculture and Consumer Services is soliciting competitive bids for structural repairs and improvements within the Connor Complex Laboratory Corridor in Tallahassee, Florida, under Project No. 1116. The scope of work includes the removal and phased replacement of all corridor flooring to maintain handicap access, the installation of a six-inch wall base, and the replacement of ceiling tiles damaged during construction. The project is estimated at $843,485 and is governed by Chapter 255 of the Florida Statutes and Florida Building Codes. Bidders must hold an active General Contractor or Certified General Contractor license and provide a bid bond of five percent for bids exceeding $100,000. The contract will be awarded to the responsive and responsible bidder offering the lowest total price for the base bid or the base bid combined with selected additive alternates, which include storefront unit replacement and concrete bench repairs. The total performance period is 180 calendar days, with substantial completion required within 150 days of the Notice to Proceed, followed by a 30-day close-out period. Award preferences are given to certified Business Enterprises and those with a certified drug-free workplace program. Sealed bids must be physically delivered by October 21, 2026, as electronic submissions are not accepted.
Department of Agriculture and Consumer Services

POSTED

about 13 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS