Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Bristol - JBLM was posted on October 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

JBLM Construct CHP Building

Closed
W912K3-26-R-A0001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 8 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a project to repair and modernize the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, exterior wall systems, interior reconfiguration, and new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act, the Buy American Act, and ADA accessibility guidelines. Quality control will be managed through a three-phase system, and final acceptance requires a series of inspections, including functional operating tests for exhaust systems and potential destructive testing for firestopping.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a subcontracting opportunity for the Grafton Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project requires comprehensive water damage restoration in Building 17 in North Grafton, Massachusetts, following a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, flooring replacement with Luxury Vinyl Plank and rubber wall base installation, as well as electrical repairs and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA, and local Massachusetts building codes. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. Award will be based on Best Value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit a single lump sum proposal with a detailed cost breakdown by November 17, 2026. Required submissions include a W9, a completed vendor questionnaire, and certification of conformity to local wage rate decisions. The contract mandates Net 30 payment terms and requires a one-year guarantee of workmanship. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 6 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in the mechanical room, along with the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, and must provide a minimum one-year workmanship warranty upon final acceptance by CSD. This solicitation is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing by room and trade, a detailed work plan addressing occupied-building protection, and evidence of relevant experience. Additionally, the selected contractor must provide payment and performance bonding for the full project value within ten days of award, and maintain general liability insurance of at least 1 million dollars per occurrence and 3 million dollars general aggregate.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 9 days

AI Contract Overview

Show more

Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside, Design-Bid-Build project for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope includes the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems including desiccant dehumidifying equipment and a dry pipe fire suppression system. The facility will also be solar-ready, featuring conduit installed below the roof structure for future photovoltaic panels. The estimated project magnitude is between 1 million and 5 million dollars, with a statutory cost limit of 5 million dollars. The contract will be awarded as a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical requirements include a task-oriented project schedule with a total completion date no later than 360 days after the Notice to Proceed, and documented qualifications for key personnel. Performance must adhere to strict standards, including UFC 3-600-01 and NFPA 13 for fire protection, and 2021 IBC and ASCE 7-16 for structural foundations. The contractor is responsible for all site-based sampling and testing via an accredited laboratory, with final validation provided by the USACE Material Testing Center. Payment will be processed through Wide Area Workflow (WAWF), and the project is subject to Davis-Bacon Act prevailing wage rates for Pierce County.

General Info

Small business contract for a 20,000 sq ft CHP building at Joint Base Lewis-McChord.

Place of Performance

JBLM, JBLM, WA, 98433, USA

Set-Aside

Small Business Set-Aside

Documents

8
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBristol - JBLM → Bristol Alliance of Companies
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Construction of a 20,000 square foot, Pre-Engineered Steel, CHP Building following criteria and provided Design/Plans

More opportunities from Bristol - JBLM → Bristol Alliance of Companies

Same awarding agency

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
The WH Ford RTC Fueling System Repairs project is a design-build effort located in Greenville, Kentucky, managed by the Bristol Alliance of Companies. This firm-fixed-price contract involves comprehensive upgrades and repairs to the fueling infrastructure, including upgrading tank automatic tank gauges, repairing dispenser and offload island concrete, installing emergency fuel shut-off systems, and mounting leak detector probes on diesel aboveground storage tanks. Additional requirements include replacing canopy and fuel pipe coatings, installing concrete circulation pavement and splash blocks, replacing tank vents and roof penetration boot seals, and modifying tank access platforms and grounding systems. All work must adhere to UFC, NFPA, and ASTM standards, as well as ADA and ABA accessibility guidelines. The project is being awarded based on the Lowest Price Technically Acceptable (LPTA) source selection process, evaluating offerors on relevant experience, a detailed Gantt chart covering preconstruction, on-site construction, and post-construction phases, and a well-defined construction methodology. Proposals must be submitted in two separate volumes, with a technical volume and a price volume. The period of performance requires work to commence within 10 days of the Notice to Proceed, with a final completion date of June 18, 2027. Contractors must implement a rigorous quality control system featuring a three-phase control process and a final acceptance inspection involving the Contracting Officer and Client representatives.
Oil and Gas Pipeline and Related Structures Construction

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
SLED
Install Pier D High Pressure Air System, NSBREM-724-A
Solicitation # N4425527RB003
Solicitation N4425527RB003 is a design-build project for the installation of a permanent high pressure air (HPA) system at Pier D, B724A of Naval Base Kitsap in Bremerton, Washington. This 100% set-aside for 8(a) businesses in SBA Region X involves the design, construction, and commissioning of a system that incorporates existing HPA cross connections from compressors at the south end of Pier D to provide air to shore risers at five specific bollard locations. The project requires the expertise of a Designer of Record to ensure compliance with Unified Facilities Criteria (UFC), ASME, and other DoD and Navy design codes, with the most stringent requirements governing in the event of discrepancies. The estimated magnitude of construction is between $1,000,000 and $5,000,000. The contract is a firm-fixed-price task order under an 8(a) Multiple Award Construction Contract (MACC) with a period of performance of 538 calendar days from award. Award will be based on price and MACC past performance. Key requirements include adherence to EM 385-1-1 safety standards, Davis-Bacon wage rates, and strict security protocols for base access and the handling of government data. Deliverables include comprehensive control system documentation, as-built sequence of operations, and the completion of final acceptance and operational tests. Contractors must provide a bid guarantee of 20% of the bid price or $3 million, whichever is less, and furnish performance and payment bonds within 10 days of award.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 1 hour ago

DEADLINE

in 21 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS