Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

JBLM Construct CHP Building

Active
875900State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) building at Joint Base Lewis McChord, Washington. This Design-Bid-Build project involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems, including desiccant dehumidifying equipment and a dry pipe fire suppression system. The work must adhere to strict technical standards, including UFC 3-600-01, NFPA 13, and the 2021 International Building Code, with specific requirements for stormwater mitigation via an infiltration pond and compliance with the Buy American Act for fire alarm components. The contract is a Firm Fixed Price task order issued against a MATOC IDIQ with an estimated magnitude between 1 million and 5 million dollars, subject to a statutory limit of 5 million dollars. Award is based on a balanced evaluation of technical capability and price. The successful contractor must commence work within 10 calendar days of the notice to proceed and complete the project within 365 calendar days. Key requirements include providing a detailed task-oriented schedule, qualifying key personnel with a history of similar projects, and adhering to prevailing wage rates per General Decision Number WA20260111. Performance and payment bonds are required for awards exceeding 150,000 dollars, and all invoicing must be processed through the Wide Area Workflow system.

General Info

Small business set-aside for a CHP building at JBLM, budget 1-5 million dollars.

Documents

(8)

A24105.08 - CHP Building Foundation Structural Calculations

PDF•specifications

CHP Warehouse 'Warring' - 100% Construction Drawings

PDF•specifications

Controlled Humidity Preservation Building - Storm Drainage Plan (Feb 2025)

PDF•specifications

JBLM Controlled Humidity Preservation Warehouse - Design Narratives

PDF•specifications

Job 515240179 - Fire Protection Calculations

PDF•specifications

W912K325P003 - CHP Warehouse Project Manual

PDF•specifications

W912K3-26-R-A0001 - Controlled Humidity Preservation (CHP) Building

PDF•rfp

WA20260111 Mod 1 - Wage Determination

PDF•wage-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyBristol - JBLM → Bristol Alliance of Companies
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Construction of a 20,000 square foot, Pre-Engineered Steel, CHP Building following criteria and provided Design/Plans

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 70Z04726RPCN0018
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for Government Furnish, Government Installed equipment, classrooms, debriefing areas, administrative offices, and various support spaces such as electrical, mechanical, and telecommunications rooms. Site work includes the installation of sidewalks and landscaping while utilizing existing parking areas. The project is issued as a task order under the National Multiple Award Construction Contract III, Pool Two, with an estimated contract value of approximately 16 million dollars and a period of performance of 719 calendar days from award. The procurement utilizes a best-value tradeoff selection process, weighing price against non-price factors including planning, organization, communication, and the proposed construction approach. Technical requirements specify the use of Siemens Building Automation Systems for installation-wide compatibility and adherence to UFC 4-010-06 cybersecurity standards. All on-site personnel must be US citizens, and security clearance is managed via RAPIDGate. The project is subject to Davis-Bacon Act wage determinations for building and heavy construction in Pasquotank County. Quality control is mandated per FAR 52.246-12, with specific ASTM standards required for the testing of concrete, soil, and structural steel.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Bristol - JBLM → Bristol Alliance of Companies

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS