Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

B309 CAC Office Reno

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Mid-AtlanticView Agency

NAICS

N/A

Place of Performance

ML: PENNS, USA

Set-Aside

8A

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Mid-Atlantic
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
We will need to have a meeting to discuss office space layout, we are open to removing any walls in this space to maximize floor space. Demolition: want to remove all items that are not reused to include abandoned in place equipment. Hallway-break room floor: the existing rubberized hallway floor will be removed, bays A-B18, bay C16 to C22. This area was tested by NAVFAC and it did not have asbestos masking or tile. New floor options, epoxy, stained concrete or whatever is approved in the UFC. Looking for something durable and little maintenance. Maybe some type of walk off carpet squares in Bay A18 will be good to keep down dirt in the hallway. HVAC: New RTU: Direct drive blowers, stainless steel drain pans, hot gas reheat for dehumidification, heat pump, high efficiency, hinged access doors, low leak economizer, convenience outlet, merv 13 filters, air cleaning device like global plasma solutions ionization. Colby performed roof support calculations as part of the structural study. New supply diffusers aluminum with induction vanes, return diffusers ¾” linear slot, no egg crate or small hole grilles. New equipment will be tied into the existing Siemens building automation controls. Lunch Room: new RTU heat pump, exhaust. CAC: New RTU heat pump, if it needs zoned VAV with electric SCR heat. Office space: New RTU heat pump, zoned VAV with electric SCR heat. Electric: CAC and office space new electrical panel will be fed from the MDP located in room 210A. New panel will be in Bay B16. CAC – Office Space will be fed from the HQ 480V system. New lighting will be LED with battery backup, new lights will match what we use in HQ spaces. Ceiling: Any ceiling that is being touched as part of the project will have the insulation removed that is laying the ceiling tile, it is not needed. Remove drop ceilings and in ... NOTE: description has been truncated, please see Project Note for full description.