Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Veterans Affairs was posted on July 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

B506-- Facility Scanning and Modeling

Closed
36C24125Q0367Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive facility scanning and modeling services across multiple buildings at the VA campus, with a focus on creating accurate, facility-wide BIM models that include both interior and exterior spaces. The scope excludes confined spaces and only covers above-ceiling scans in accessible areas, performed via existing access panels or by removing and reinstalling ceiling tiles, with an emphasis on minimal disruption and adherence to safety standards. The contractor is responsible for proposing a detailed project schedule within 10 business days of the notice to proceed, utilizing their preferred project management software, and ensuring all deliverables meet a Level of Development 200 standard. The project duration is initially set for 120 days, with a possibility of extension to 180 days, and includes tasks such as LiDAR scanning, model development, and staff training, with a focus on industry-standard accuracy and data parameters like COBie. Coordination with VA staff is essential, especially in patient-care areas where off-hours work may be necessary, and security procedures such as badge access and escort requirements will be in place. The contract specifies that the contractor will perform ceiling tile removal and replacement, with assumptions about tile types and replacement percentages provided for bidding purposes. Deliverables should be in accessible formats suitable for executive review, with no expectation of 2D drawings unless explicitly requested. Temporary control markers are permitted to aid in accurate scanning, and the contractor must ensure that any facility damage is repaired post-work. The project emphasizes safety, accuracy, and thorough documentation, with the VA providing available floor plans and manuals as they become available.

General Info

Provide 3D scans and BIM-compliant models of VA buildings with detailed asset data, within 120-180 days.

Contract Value

$56,237.26

NAICS

541370 - Surveying and Mapping (except Geophysical) Services

Place of Performance

ME

Set-Aside

NONE

Award Issued Date

Documents

9

608-24-902 Facility Scanning and Modeling SOW

PDF, High priority: read this firstsow
High

Manchester VAMC Space Plan 2025

PDF, High priority: read this firstspecifications
High

36C24125Q0367+0001.docx

DOCX

36C24125Q0367+0002.docx

DOCX

36C24125Q0367+0003.docx

DOCX

36C24125Q0367+0004.docx

DOCX

36C24125Q0367+0005.docx

DOCX

36C24125Q0367+0006.docx

DOCX

36C24125Q0367_1.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Jun 17, 2025 to Jun 20, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 20, 2025 to Jun 27, 2025. The notice description changed.

Notice updated

Response deadline changed from Jun 27, 2025 to Jul 11, 2025. The notice description changed.

Notice updated

Response deadline changed from Jul 11, 2025 to Jul 18, 2025. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Office AddressTOGUS, ME, 04330, USA
Contacts
Jeffrey S FlemingContractor

Full Description

Show more
36C24125Q0367-Facility Scan Questions The SOW states No confined spaces are to be included and above-ceiling scans only in already-exposed areas. Q1) May we access limited attic or ceiling-plenum areas via existing access panels, or must we exclude all above-ceiling areas entirely? Answer: Answer: Scanning is to be performed above-ceiling when said space is accessible by access panel and/or removal and subsequent reinstallation of drop-ceiling tiles. For further information, see Solicitation Amendment 001 Per-Building Fee Assumptions Fee proposals must be broken out for each individual building, in addition to an overall fee. Q2) Aside from square footage, are there any unique site conditions such as restricted access hours, specialized mechanical rooms) per building that could affect our unit scanning rates? Answer: Answer: Scanning of many/most locations on campus will not require anything further than typical COR-facilitated coordination with occupants. However, buildings 1, 15, and 18 all have patient-care spaces, which will require further and more detailed coordination. While COR believes that coordination for scanning of most patient-care areas (including CLC/nursing home, etc.) is possible during normal working hours (7:00-3:30), it is likely that some off-hours work will be required to scan some patient-care areas, given the possibility of misalignment of work schedule and patient-care schedules. Definition of Off-Hours The SOW allows off-hours work, as needed, to facilitate scans of high-traffic areas. Q3) How does VA define off-hours (e.g., nights, weekends)? Answer: Off-hours work is defined as work taking place outside of normal working hours (7:00-3:30), or on federal holidays. Q4) Are there labor-rate differentials or security escort requirements during these periods? Answer: The Service Contract rates apply, See response to question 20 regarding escort. Q5) What's the preferred method or time to capture scan data with permanent residents (I.E nursing home etc). Answer: See response to question 2. Q6) Will VA provide a template or example Gantt overview, or should we propose our own format and level of detail? Answer: Contractor is required to propose and supply a project schedule. VA will not provide templates. Additionally, VA requires a schedule to be submitted within 10 business days of NTP. Q7) Our Method is Autodesk Construction Cloud (ACC). Is this acceptable? Answer: Contractor is authorized to use whichever Project Management Software is preferred, provided that the ultimate submission requirements are met. Q8) Will model substitutions be allowed for any content current not available in a BIM format? Answer: Model substitutions will be allowed, as necessary, as long as they accurately reflect existing conditions. Q9) Will there be any Technical submittals and or manuals for maintainable assets to populate the COBie Data? Answer: Manchester VA currently has no COBie data on maintainable assets to supply to the contractor but will provide submittals/manuals as they are available. Q10) Are there preferred output formats (e.g., equirectangular JPEG, Matterport), minimum resolution specifications, or hosting-platform requirements? Answer: Output formats should be chosen and submitted such that they are easily viewable with minimal software required to be installed on the viewing machine (i.e. formats that can be emailed to, for example, the Executive Leadership Team and could be viewed, shared, and understood by them with little/no CAD experience/software). Q11) Should Omniclass parameters be filled in only for maintainable assets, or for all model elements? Answer: Omniclass parameters will be utilized for all maintainable assets. 120 days from NTP includes all scanning, modeling, and final deliverables including training of staff, correct? Answer: Correct. Though the Period of Performance (PoP) is able to be reevaluated as necessary (with discussion and concurrence from CO), VA currently expects that the project and all deliverables will be completed by the end of the PoP. Are floor plans available for distribution? Understanding the sensitivity/security, it would allow for a more accurate estimation of scanning and deliverables Answer: See attached floorplans. This is only an SF1449 submission, correct? Can we supply a cover letter, brief synopsis of capabilities, and any assumptions with the submission? Answer: SF 1449 line item pricing and acknowledgement of amendments. You can provide any documentation to support your quote. To assist with maintaining accuracy throughout the campus, we recommend placing temporary control markers on walls or floors, is this acceptable to the VA? Targets will be less than 6"x6" Answer: Temporary control markers are acceptable, provided they present no hazard to building occupants (e.x. secure sticker, strip of painter s tape, etc.). Contractor will, upon completion of work, ensure that any and all damage done to facility by temporary control markers or by any other work performed under this contract is repaired and VA facilities are returned to their prior state. Is the scan and model interior only or do we include exterior as well? Answer: As part of deliverable 5.2.5 from SOW, VA expects a complete, facility-wide model. This includes exterior scans of each building, as well as a common reference frame that is accurately shared between interior spaces. What accuracies are expected to be obtained within the LiDAR collection? Answer: VA expects accuracies to align with VA BIM Manual and with industry-standard modelling tolerances. Is there existing control through the scope areas? If not, what type of physical control markers are acceptable? Answer: No physical control markers currently exist onsite. See response to question 15 regarding use of temporary control markers. Is it a correct assumption all Revit models are to maintain spatial relationships between each other? (1 defined coordinate system for entire campus). Answer: See response to question 16. Are escorts required or will badge access be given along with NTP and any required on site trainings are completed? Answer: Flash badges will be provided to contractors at the start of each working day and will ease necessity of VA escort. Some spaces (locked spaces, patient-care spaces, etc.) may still require escort, but COR or alt-COR will provide and/or coordinate required escorts. Are there any 2D deliverables required? If so can you provide expectations for those deliverables. Answer: No 2D deliverables are expected. The BIM Manual refers to data needing to be exported in COBie format. Please provide a list of parameters or list of desireable data to be captured and inputted into the model. Answer: Desirable COBie data includes, but is not necessarily limited to, manufacturer, model number, serial number, location information, etc. Per the BIM Manual, what is the Level of Development (LOD) required for the model? See below descriptions of each Level of Development (LOD). Answer: Contractor will meet LOD 200 requirements for model submissions. The SOW states "contractor shall not include removal and replacement of ceiling tiles in fee proposal." Amendment 2 clarifies that 90% of the square footage is above drop ceiling and states to carry 20% ceiling tile replacement. Could you clarify if the contractor is to perform the removal and replacement of the ceiling tiles for the scanning procedure, and if so, what ICRA requirements will be required. Answer: Contrary to the originally-solicited SOW, the contractor will indeed be performing removal and replacement of the ceiling tiles. As long as the contractor is able to remove only one tile at a time, ICRA requirements will be almost negligible (i.e. typical housekeeping procedures will be all that is necessary, in addition to typical coordination with space occupants and patients). Can you provide a breakdown of the 2x2 vs 2x4 tiles? - We are assuming 90% the facility has drop ceilings and 20% of those tiles will need replacement per your instructions. Contractor to bid assuming 20% ceiling-tile replacement (due to damage when removing/reinstalling). Facility standard ceiling tiles are: 2x2: Armstrong 824 Cortega FireGuard Square Lay-in with 15/16 white grid 2x4 Armstrong 823 Cortega FireGuard Square Lay-in with 15/16 white grid Answer: For bidding purposes, contractor is to assume that 60% existing ceiling tiles are 2x2 and 40% existing ceiling tiles are 2x4. Should we assume half of the ceiling is 2x2 and half 2x4 for pricing purposes? See response, above. PWS provides the information on the building names and number. Where can we find floor plans or as-builts or campus maps for those buildings? I would appreciate if you could point us in the right direction. We were able to access the attached pdf's but would like to confirm we have the correct information on the buildings. See attached Space Plans. Amendment 2 clarifies that 90% of the square footage is above drop ceiling and states to carry 20% ceiling tile replacement. Could you clarify if the contractor is to perform the removal and replacement of the ceiling tiles for the scanning procedure, and if so, what ICRA requirements will be required. Answer: Contrary to the originally-solicited SOW, the contractor will indeed be performing removal and replacement of the ceiling tiles. As long as the contractor is able to remove only one tile at a time, ICRA requirements will be almost negligible (i.e. typical housekeeping procedures will be all that is necessary). Could you please extend the period of performance of 120 from award to 180 days from award? Answer: COR has no objection to extending PoP from 120 to 180 calendar days.

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 811310
New
Federal
H146--Hach Water Quality Monitoring Service
Solicitation # 36C24127Q0031
The Department of Veterans Affairs Networking Contracting Office intends to enter into a sole source procurement with Hach Company under FAR 6.302-1 for water quality monitoring services at the VA Medical Center in White River Junction, Vermont. This requirement is designated under NAICS code 811310. The scope of work involves the inspection, maintenance, repair, and annual calibration of ten Hach water quality monitoring instruments located across several facility buildings, as well as the annual calibration of one colorimeter. The contract includes two scheduled visits per 12-month period, 24/7 emergency service, and monthly reagent refills. These services are critical for ensuring the supply of safe drinking water and generating the daily data reports required by the State of Vermont Drinking Water Protection Division. The procurement is awarded to Hach Company because the equipment and services are proprietary, and the manufacturer does not authorize other organizations to perform repairs or recalibrations. Because the work is performed within a functioning hospital, the contractor must adhere to strict infection control practices and submit an Infection Control Plan, Activity Hazard Analysis, and Material Safety Data Sheets for approval. All work must comply with NFPA, OSHA, EPA, and specific VA specifications and handbooks. The government retains all rights to data and electronic records produced under the contract, and the contractor must comply with the Privacy Act of 1974 and the Freedom of Information Act. Interested parties must submit their capabilities to Kenya Mitchell by the specified deadline to determine if competitive procedures are feasible.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

1 day ago

DEADLINE

in 2 days
View Details
NAICS: 561730
New
Federal
S208--West Haven Grounds and Maintenance
Solicitation # 36C24127Q0004
The Department of Veterans Affairs, Network Contracting Office 1, is soliciting proposals for a firm-fixed-price contract to provide comprehensive grounds maintenance, snow and ice removal, and storm drain cleaning services at the West Haven VA Medical Center in Connecticut. This total small business set-aside under NAICS 561730 includes a base year and four option years, with a total duration not to exceed five years. The scope of work requires 24/7 availability for snow and ice events, with a mandatory response time of one hour and the requirement for a field service representative located within 200 miles of the campus. Key services include mowing 30 acres of improved grounds, fall leaf removal, bi-annual storm drain cleaning for both West Haven and Newington campuses, and specialized snow removal for parking garages. Fertilization, pest control, and soil aeration are expressly excluded from the contract. Award will be granted to the Lowest Priced Technically Acceptable (LPTA) offeror. Technical acceptability is based on the capability to perform all services, equipment inventory, and personnel qualifications, while past performance is evaluated on a go/no-go basis requiring at least three references from the last five years. Proposals must be submitted in two volumes, consisting of a technical capability statement and a completed CLIN pricing schedule, by October 29, 2026, at 10:00 AM Eastern Time. Performance is monitored via specific acceptable quality levels based on customer complaints, and the contractor must adhere to Service Contract Labor Standards for the West Haven and Newington areas.
Landscaping Services

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 561730
New
Federal
S208--Landscaping and Snow Removal Services
Solicitation # 36C24127Q0019
Solicitation 36C24127Q0019 is a combined synopsis and request for quotations issued by the Department of Veterans Affairs for landscaping and snow removal services at the Providence VA Medical Center, the VA Facility at 500 Valley Street, and the Harwood Center in Providence, Rhode Island. This procurement is a total set-aside for Veteran-Owned Small Businesses under NAICS code 561730. The contract structure consists of one base year and four option years, with an estimated start date of November 1, 2026. The scope of work encompasses comprehensive grounds maintenance, including lawn mowing, trimming, edging, and debris removal for approximately 5.28 acres, as well as snow removal, ice control for pedestrians and roads, and off-site snow hauling limited to 500 cubic yards annually. The government will utilize a comparative evaluation process to determine the best benefit, considering technical quality, past performance, and total evaluated price, including a six-month extension under FAR 52.217-8. Key deliverables include a snow removal logistics plan and strict adherence to acceptable quality levels, with 100 percent compliance required for snow and ice control services. Offerors must submit their responses by October 21, 2026, and must include a signed VA Notice of Limitations on Subcontracting Certificate of Compliance to be eligible for award. Invoicing is to be processed through the Tungsten Network. Amendment 0001 further refined the performance work statement, pricing structure, and provided industry clarifications regarding weather reporting and equipment protocols.
Landscaping Services

POSTED

2 days ago

DEADLINE

in about 4 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS