Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

S208--West Haven Grounds and Maintenance

Active
36C24127Q0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

561730 - Landscaping Services

Place of Performance

VAMC West Haven, West Haven, CT, 06516, USA

Set-Aside

SBA

Documents

10

Appendix F – Storm Drains Newington

PDF, Low priorityappendix
Low

Past Performance Document Template

DOCX, Low priority2 pages · past-performance
Low

36C24127Q0004.docx

DOCX

Appendix+A+Sidewalks+Entrances+and+Ramps.pdf

PDF

Appendix+B+Emergency+Equipment.pdf

PDF

Appendix+C+Grass+and+Mowing.pdf

PDF

Appendix+D+Lots+and+Roads.pdf

PDF

Appendix+E+Storm+Drains+West+Haven.pdf

PDF

P07_Newington+2015-4119+Rev+35.pdf

PDF

P07_West+Haven+2015-4127+Rev+36.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)
Contacts1 person available
OfficeTOGUS, ME, 04330, USA
Office AddressTOGUS, ME, 04330, USA
Contacts
Nathan LangoneContract Specialist

Full Description

Show more
COMBINED SYNOPSIS/SOLICITATION West Haven Grounds Maintenance VA Connecticut Healthcare System West Haven VAMC
Solicitation Number: 36C24127Q0004 Posted Date: October 20th, 2026 Response Deadline: October 29th, 2026, 10:00 AM Eastern Time Set-Aside: Total Small Business Set-Aside NAICS Code: 561730 Landscaping Services Size Standard: $9.5 Million Product Service Code (PSC): S208 Grounds Maintenance Contract Type: Firm-Fixed Price (FFP) Place of Performance: VA Connecticut Healthcare System, 950 Campbell Avenue, West Haven, CT 06516
1. GENERAL INFORMATION This is a combined synopsis/solicitation for commercial services prepared in accordance with the format prescribed in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued separately. This solicitation is issued as a Request for Proposal (RFP). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2026-01. This acquisition is set aside 100% for Small Business in accordance with FAR 19.502-2. Offerors must be registered and active in SAM.gov at the time of offer submission and at time of award.
2. REQUIREMENT OVERVIEW The Department of Veterans Affairs (VA), Network Contracting Office 1 (NCO 1), on behalf of the VA Connecticut Healthcare System, requires comprehensive grounds maintenance, snow and ice removal, and storm drain maintenance services at the West Haven VA Medical Center. Services are required to support 24/7 Medical Center access and operations for veterans and staff year-round.
3. STATEMENT OF WORK (SOW) 3.1 Background The VA Connecticut Healthcare System requires annual services for grounds maintenance, snow and ice removal, hauling, and treatment services at the West Haven VA Medical Center, located at 950 Campbell Avenue, West Haven, CT 06516. 3.2 Scope of Work The Contractor shall furnish all labor, materials, equipment, tools, supervision, disposal, and all incidentals necessary to perform grounds maintenance, snow and ice removal, and storm drain cleaning services as described herein. The Contractor shall coordinate all work with the VA COR and designated representatives of Facilities Management Service. 3.3 Contractor Qualifications To be eligible for award, the Contractor shall: Maintain a field service representative located within 200 miles of the West Haven Campus and capable of responding within two (2) hours. Possess proper equipment, materials, and support to provide all services under this contract. Provide, upon request, documentation of certification and training on specific equipment used under this contract. The CO and/or COR reserve the right to reject any Contractor personnel and refuse permission to work on-site based on credentials or conduct. 3.4 Description of Services 3.4.1 Snow and Ice Removal Snow Removal (SOW §1.1) The Contractor shall remove snow from all sidewalks, steps, stairs, stair and ramp landings, entrance ramps, roadways, roads, parking lots, and parking structures across the West Haven VA campus as delineated in Appendix A (Snow Removal Map) and Appendix D (Lots and Roads). All snow removal zones are considered high priority and shall be worked simultaneously. Snow piling will be in designated locations per the COR. Snow removal shall commence when on-site accumulation reaches one (1) inch and/or within one (1) hour after snowfall stops, whichever occurs first. Snow removal shall continue until all accumulation has ended and all covered surfaces are fully cleared. When snowfall is forecasted, the Contractor shall pretreat all snow removal zones at least two (2) hours prior to each forecasted event. Snow shall not be piled on paved areas (roads or parking lots). Piles shall maintain safety and maximize usable parking area. The Contractor shall clear all handicap access points throughout the campus at all times. Snow removal quantities are based on total snowstorm accumulation as reported by the National Weather Service https://www.weather.gov/ for West Haven, CT. Contract quantities include up to 50 inches of snow and 5,000 lbs of ice melt. Amounts exceeding contract quantities require Contracting Officer authorization via contract modification. Ice melt application shall be included with every snow and ice removal event. All ice and snow melt materials shall be provided by the Contractor. Snow removal shall cover the following areas: Roadways and Drives: Campbell Avenue Entrance, Spring Street Entrance, Lawson Road, Service Road, Building 1 Loading Dock, Building 2 Loading Dock, Building 2 Main Entrance, Building 5 Main Entrance, Ambulance Bay, Ring Road, Building 19, Building 16, and Veterans Drive. Parking Lots (1,378 regular spaces / 129 accessible spaces): Parking Lots 1, 2, 4, 5, 6, 7, 8, 10, 14, 15, 16, 18, 24, Emergency Room, and Fisher House. Sidewalks and Building Entrances (12,636 SF total): All areas as identified in the West Haven VA Medical Center Sidewalk/Walkway and Building Entrance Inventory. Ice Removal (SOW §1.2) The Contractor shall immediately treat and remove ice on all sidewalks, steps, stairs, ramp landings, and entrance ramps. Ice removal shall commence when any accumulation occurs and/or within one (1) hour after ice stops. Approved ice melt product for sidewalks: Calcium Magnesium Acetate (CMA) such as Inferno or equal. Sand is not permitted. Approved product for roads and parking lots: Salt or other COR-approved ice control products. Pretreatment shall occur at least two (2) hours prior to each forecasted ice/freezing precipitation event. The Government will provide a bulk salt storage area on-site for Contractor use. Personnel Management (SOW §1.3) The Contractor shall provide supervision for full utilization of staff and coordination with the VA COR. The Contractor shall provide standard log forms for COR review and approval prior to each option year and submit daily activity logs documenting all campus activities. Response Time and Hours of Operation (SOW §1.5) The Contractor shall provide 24/7 response to snow and ice events within one (1) hour. Parking Garage Snow Removal (SOW §1.6) Prior to each winter season (no later than November 1 of each contract year), the Contractor and COR shall conduct a pre-season walkthrough of the garage. The Contractor shall provide a written photographic damage report within 10 calendar days of the walkthrough. Snow removal from the garage roof deck shall use approved equipment only. Plow trucks shall not exceed 10,000 lbs fully loaded. Plow cutting edges contacting precast surfaces shall have well-maintained rubber tipper blades. Snow piling on the garage deck is not authorized; plows shall be held approximately 1 inch from the deck surface and approach seams at no greater than a 75-degree angle. Parking Garage De-Icing (SOW §1.7) Prior to the first freeze of each season, the Contractor shall submit the de-icing product intended for use, with at least one alternate, and shall walk the garage with the maintenance team to inspect drains and potential problem areas. Authorized products for precast concrete surfaces are limited to Calcium Magnesium Acetate (CMA) or Urea-Based deicers. Equipment weight limits for de-icing match snow removal requirements. Salt and De-Icing Products (SOW §1.8) All products used for snow removal and de-icing must be approved by the COR prior to use. The Contractor is responsible for providing all products required for pretreatment, snow melt, and de-icing. The Government will not provide any snow removal or de-icing products. 3.4.2 Grounds Maintenance Mowing (SOW §2.1) The Contractor shall mow approximately 30 acres of improved grounds at the West Haven VAMC (Appendix C). Grass height shall be maintained between 3 and 6 inches. Grass clippings shall be removed and disposed of offsite or mulched when visible after mowing. Clippings shall be removed from all paved surfaces. Portable high-CFM blowers shall not be used during normal working hours near personnel or parked vehicles. Edging (SOW §2.2) Sidewalks, driveways, curbs, and concrete or asphalt edges shall be edged at least every other mowing. Trimming (SOW §2.3) Grass and weeds shall be trimmed around all fixed obstacles (trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, and islands) concurrent with mowing. Trimming height shall match surrounding grass heights. Damage to trees or shrubs caused by the Contractor shall be repaired within 15 days of noticed or reported damage, including replacement with plants of the same size and type if necessary. Irrigation (SOW §2.4) The Contractor shall maintain and conduct spring turn-on and fall winterization of the irrigation system in front of Building 2 and within the island for the main flagpole near the parking garage. Fall Leaf Removal (SOW §2.5) Fallen leaves and branches shall be removed from all improved grounds areas (Appendix C) at intervals of not less than weekly between Labor Day and Thanksgiving each year, continuing until all tree leaves have fallen. All debris shall be disposed of offsite at an authorized disposal location in compliance with applicable local, state, and federal regulations. Repair of Damaged Areas (SOW §2.6) Improved ground areas damaged by Contractor vehicles or equipment shall be seeded or sodded to meet the standard of surrounding areas. All other areas shall be repaired and restored to match surroundings. Downed Tree and Limb Removal (SOW §2.7) The Contractor shall remove all downed tree limbs and fallen trees on-site. The Contractor must possess proper equipment to safely perform this work, including a bucket truck, chipper, and trained chainsaw crews. Note: Fertilization, pest control, soil aeration, and emergency/special event services are expressly excluded from this contract. 3.4.3 Storm Drain Maintenance Storm Drain Cleaning (SOW §4.1) The Contractor shall maintain and clean the full storm drain inventory as identified in Appendix E (West Haven) and Appendix F (Newington) on a bi-annual basis in April and October. Cleaning shall include removal of all debris from catch basins, drain pipes, and attaching structures; inspection of termination points; replacement of covers; and inspection of grates. Annual hydro jetting of all storm drain pipes shall be performed in either April or October, with a minimum of 335 days between consecutive hydro jetting events. The Contractor shall document and immediately notify the COR of any broken or defective catch basins or observations of discharges of sediments or pollutants into the stormwater system. A cleaning and inspection report including all deficiencies, inspection data, and photographs shall be submitted to the CO and COR within 14 calendar days of each cleaning. Disposal (SOW §4.2) All sediment, waste materials, and liquids shall be disposed of in compliance with the National Pollutant Discharge Elimination System (NPDES) MS4 Permit and applicable Department of Natural Resources and Environment regulations. Toxicity Characteristic Leaching Procedure (TCLP) testing, if required by the destination disposal facility, is the Contractor's responsibility. Decanting into the stormwater system or sanitary sewer is strictly prohibited. Disposal reports shall be submitted to the CO and COR within 30 calendar days of each scheduled cleaning. 3.5 Performance Standards Performance Objective SOW Reference Performance Standard Acceptable Quality Level Snow Removal §1.1 Snow removed; areas safe for pedestrian and vehicle traffic Customer complaints 2 per snow event Ice Control/Removal §1.2 Ice treated and removed; areas safe for traffic Customer complaints 2 per ice event Parking Garage Snow Removal §1.6 Snow removed per §1.6; areas safe for traffic Customer complaints 2 per snow event Parking Garage De-Icing §1.7 De-icing per §1.7; areas safe for traffic Customer complaints 2 per snow event Grounds Maintenance §2 Grass maintained at proper height; edging, trimming, leaf removal, and repairs completed per specifications Customer complaints 2 per month Storm Drain Maintenance §4.1 Drains cleaned bi-annually; report received within 14 days Customer complaints 1 per year Disposal §4.2 Disposal report submitted within 30 days Customer complaints 1 per year 3.6 Submittals and Deliverables Copy of equipment safety inspections submitted to the CO prior to use Copies of all personnel qualifications, training, and applicable licenses Electronic copy of all services performed submitted to the CO, COR, and Facilities Management Service Maintenance Supervisor within 48 hours of services provided Standard daily activity log forms for COR approval prior to each contract year Pre-season parking garage walkthrough report with photographs within 10 calendar days of walkthrough Storm drain cleaning and inspection reports within 14 calendar days of each cleaning Disposal reports within 30 calendar days of each scheduled cleaning Safety Plan submitted to COR prior to commencement of work 3.7 Hours of Work and Parking Work shall be coordinated with the COR. Snow and ice removal services shall be available 24 hours a day, 7 days a week. One Contractor vehicle is permitted to park on-site Monday through Friday, 6:00 AM to 5:00 PM. Outside those hours, Contractor vehicles may park on-site only when work is actively being performed. Parking within the parking garage or patient-designated areas is strictly prohibited at all times. Parking passes for work vehicles shall be issued by the VA Police Office. 3.8 Sign-In/Badging All Contractor personnel, subcontractors, and representatives visiting VA sites shall sign in upon arrival at Building 15 and retain a temporary VA badge prominently displayed at all times. Each individual shall record their name, company name, VA project title, reason for visit, and times of arrival and departure. After-hours site visits must be arranged in advance during normal working hours. 3.9 Safety Requirements The Contractor shall develop and submit a Safety Plan to the COR prior to commencing work, in accordance with the latest editions of applicable VA guidelines, NFPA, and all applicable federal and state codes, including TJC requirements. Per VA Directive 1805, smoking, vaping, and smokeless tobacco are prohibited on all VA grounds, including in vehicles. No photography of VA premises is permitted without written authorization from the Contracting Officer. Patients and staff shall not be photographed at any time. The Contractor shall confine all operations and material storage to areas authorized by the CO or COR. 3.10 NARA Records Management The Contractor shall comply with all applicable federal records management requirements, including 44 U.S.C. Chapters 21, 29, 31, and 33; the Freedom of Information Act (5 U.S.C. 552); the Privacy Act (5 U.S.C. 552a); and 36 CFR Parts 1222 and 1228. All deliverables are the property of the U.S. Government. No records shall be retained, sold, or destroyed without prior written consent of the Contracting Officer.
4. CONTRACT CLAUSES AND PROVISIONS Provisions (Pre-Award) FAR 52.212-1 Instructions to Offerors Commercial Products and Commercial Services FAR 52.212-3 Offeror Representations and Certifications Commercial Products and Commercial Services (Complete annually via SAM.gov) FAR 52.204-7 System for Award Management FAR 52.204-16 Commercial and Government Entity Code Reporting FAR 52.215-1 Instructions to Offerors Competitive Acquisition FAR 52.219-1 Small Business Program Representations Clauses (Post-Award) FAR 52.212-4 Contract Terms and Conditions Commercial Products and Commercial Services FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders Applicable subparagraphs include: 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards 52.219-6 Notice of Total Small Business Set-Aside 52.219-28 Post-Award Small Business Program Rerepresentation 52.222-21 Prohibition on Segregated Facilities 52.222-26 Equal Opportunity 52.222-36 Equal Opportunity for Workers with Disabilities 52.222-41 Service Contract Labor Standards (Wage Determination No. 2015-4127, Revision 36 [West Haven] and Wage Determination No. 2015-4119, Revision 35 [Newington] apply and are incorporated herein) 52.222-50 Combating Trafficking in Persons 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving 52.225-13 Restrictions on Certain Foreign Purchases 52.232-33 Payment by Electronic Funds Transfer System for Award Management FAR 52.217-8 Option to Extend Services FAR 52.217-9 Option to Extend the Term of the Contract FAR 52.232-18 Availability of Funds FAR 52.237-3 Continuity of Services FAR 52.246-4 Inspection of Services Fixed Price VAAR 852.203-70 Commercial Advertising VAAR 852.232-72 Electronic Submission of Payment Requests VAAR 852.237-70 Contractor Responsibilities
5. CLIN STRUCTURE / PRICE SCHEDULE Offerors shall complete the following price schedule in full. All prices shall be inclusive of labor, materials, equipment, supplies, disposal, travel, overhead, and profit unless otherwise noted. No additional charges beyond those quoted below will be accepted. BASE YEAR November 30, 2026 November 29, 2027 CLIN Description Qty Unit Unit Price Total Price 0001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 0002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 0003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 0004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 0005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 0006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ BASE YEAR TOTAL: $__________
OPTION YEAR 1 November 30, 2027 November 29, 2028 CLIN Description Qty Unit Unit Price Total Price 1001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 1002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 1003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 1004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 1005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 1006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ OPTION YEAR 1 TOTAL: $__________
OPTION YEAR 2 November 30, 2028 November 29, 2029 CLIN Description Qty Unit Unit Price Total Price 2001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 2002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 2003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 2004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 2005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 2006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ OPTION YEAR 2 TOTAL: $__________
OPTION YEAR 3 November 30, 2029 November 29, 2030 CLIN Description Qty Unit Unit Price Total Price 3001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 3002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 3003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 3004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 3005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 3006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ OPTION YEAR 3 TOTAL: $__________
OPTION YEAR 4 November 30, 2030 November 29, 2031 CLIN Description Qty Unit Unit Price Total Price 4001 Snow Removal in accordance with the Statement of Work 50 Inch $__________ $__________ 4002 Ice Melt/Sanding provided and applied in accordance with the Statement of Work 20 Job $__________ $__________ 4003 Fall Clean-Up consisting of leaf removal and disposal off site per clean up 12 Job $__________ $__________ 4004 Grass Cutting and Trimming per cut 12 Job $__________ $__________ 4005 Bi-Annual Campus Storm Drain Cleaning West Haven (Annual Total) 2 Job $__________ $__________ 4006 Bi-Annual Campus Storm Drain Cleaning Newington (Annual Total) 2 Job $__________ $__________ OPTION YEAR 4 TOTAL: $__________
TOTAL EVALUATED PRICE (Base Year + Option Years 1 4): $__________ Options will be evaluated in accordance with FAR 52.217-5. The Government is not obligated to exercise any option. Options may be exercised within the timeframes specified in FAR 52.217-9. There will be a line item for Emergency and Unanticipated Grounds Services DO NOT PROVIDE PRICING FOR THIS LINE ITEM, PRICING WILL BE REQUESTED POST AWARD AS EMERGENCIES OCCUR.
6. EVALUATION CRITERIA This acquisition will be evaluated using Simplified Acquisition Procedures in accordance with FAR Part 13. Award will be given to the Lowest Priced Technically Acceptable (LPTA) offeror whose proposal meets all the following criteria: Technical Acceptability Offeror demonstrates the capability to perform all services described in the SOW, including 24/7 snow and ice response, grounds maintenance, and storm drain cleaning; confirms field service representative within 200 miles of West Haven, CT; and provides evidence of required equipment, personnel qualifications, and licenses Past Performance Acceptability Offeror provides a minimum of three (3) references for contracts of similar scope and complexity performed within the last five (5) years; past performance will be evaluated on a Go/No-Go basis as either Acceptable or Unacceptable. Price Offeror submits a complete and realistic price schedule for all CLINs (Base Year + Option Years 1 4); award will be made to the lowest total evaluated price among all technically acceptable offerors The Government will not make an offeror whose price is determined to be unreasonably low or unbalanced.
7. PROPOSAL SUBMISSION REQUIREMENTS Offerors shall submit the following in two separate volumes: Volume I Technical and Past Performance Technical Capability Statement (no more than 10 pages) describing: Experience performing grounds maintenance, snow/ice removal, and storm drain services at a comparable facility (healthcare, institutional, or large campus) Equipment inventory, including snow removal and storm drain cleaning equipment Staffing plan and key personnel qualifications Management approach and quality control plan Confirmation of field service representative within 200 miles of West Haven, CT Past Performance Minimum three (3) references for contracts of similar scope and complexity performed within the last five (5) years, including contract number, agency/company name, POC and contact information, period of performance, contract value, and description of work Volume II Price Completed CLIN pricing schedule (Base Year + Option Years 1 4) Completed Representations and Certifications (via SAM.gov or attached) Proposals shall be submitted electronically to: Contracting Specialist: Nathan Langone Email: Nathan.Langone@va.gov Network Contracting Office 1 (NCO 1) Proposal Deadline: October 29th, 2026, 10:00 AM Eastern Time Late proposals will not be accepted.
8. ADDITIONAL INFORMATION All offerors must be registered and active in SAM.gov at time of proposal submission and award. This acquisition is set aside for Small Business per FAR 19.502-2. Offerors must represent themselves as a small business under NAICS 561730 at time of offer. This contract is subject to the Service Contract Labor Standards (Service Contract Act) per FAR 52.222-41. The following Wage Determinations are incorporated into this solicitation and will be incorporated into the resulting contract: Wage Determination No. 2015-4127, Revision 36 West Haven, CT Wage Determination No. 2015-4119, Revision 35 Newington, CT Offerors are responsible for reviewing both applicable wage determinations on SAM.gov prior to submission and ensuring proposed prices reflect the required wage rates for each location. Questions shall be submitted in writing to the Contracting Specialist no later than October 26th, 2026, 10:00 AM Eastern Time. Questions received after this date may not receive a response. The Government reserves the right to make award without discussions. The Government reserves the right to cancel this solicitation at any time. The Government reserves the right to exercise option years subject to availability of funds and satisfactory contractor performance.
This solicitation is for commercial services as defined under FAR Part 2 and FAR Part 12.
END OF COMBINED SYNOPSIS/SOLICITATION

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and over 35 buildings, requiring the contractor to provide all labor, equipment, and materials for mowing, string trimming, edging, and cleanup. Turf must be maintained between 3 and 4 inches in height, and any identified deficiencies must be corrected within 48 hours at no additional cost. The contract consists of an initial one-year term with options for four additional one-year renewals, contingent upon funding and satisfactory performance. This is a small business set-aside opportunity open to various SBA-certified categories, including VOSB, SDVOSB, WOSB, and HUBZone small businesses. Award will be granted to the responsible offeror who is technically acceptable and provides the lowest price. Technical acceptability requires evidence of Kentucky state registration and licensure, verification of eligibility via the SAM portal, and the submission of a detailed technical proposal, safety program, and equipment list. Contractors must adhere to the Federal Acquisition Regulation and Davis-Bacon Act labor standards, including the submission of weekly certified payroll and a signed Statement of Compliance with every invoice. Additionally, contractors must provide proof of insurance and the ability to secure performance and payment bonding. All quotes must be submitted electronically to the designated purchasing email by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 3 hours ago

DEADLINE

in 9 days
View Details
NAICS: 561730
New
MI 2026-10 Landscaping Services
Solicitation # MI 2026-10
Adams and Associates, Inc., operating on behalf of the U.S. Department of Labor, is soliciting bids for landscaping services at the Miami Job Corps Center in Florida. The scope of work involves the maintenance of a 15-acre lot, including lawn cutting for the school front and outer perimeter, weed killer treatment for planting beds and sidewalks, bush trimming, and the maintenance of baseball and volleyball fields. The period of performance is scheduled from November 1, 2026, to October 31, 2027. Bids must be submitted by October 23, 2026, and will be evaluated based on the most responsible bidder rather than the lowest cost alone. Eligible vendors must be registered in SAM.gov with a valid Unique Entity ID and possess all necessary business and employee licenses for the State of Florida. Required bid documentation includes a vendor questionnaire, W9, Authority to Commit, and a list of references for those without prior experience with the Center. Contractors must maintain comprehensive general liability insurance of $1,000,000 per occurrence, along with workers compensation and automobile liability insurance. The contract is subject to the Service Contract Act and Davis-Bacon Act, requiring adherence to specific wage determinations and payroll submission for service incidents exceeding $2,500. Additionally, personnel must comply with strict security protocols, including searches and a no-fraternization policy with students. Payment terms are NET 30 days from the date of invoice.
Miami Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 1 day
View Details
NAICS: 561730
New
SLED
Dinner Island Ranch WMA Canal Cleaning and Maintenance
Solicitation # FWC 26/27-27
The Florida Fish and Wildlife Conservation Commission is soliciting competitive bids for canal cleaning and maintenance services at the Dinner Island Ranch Wildlife Management Area in Hendry County. The project encompasses over 50 miles of canals, with a primary focus on main drainage canals connected to reservoirs and those upstream of discharge points. The scope of work includes cleaning canals, clearing right-of-way vegetation, and the chemical spraying of aquatic vegetation to improve water quality, minimize sediment buildup, and ensure continued maintenance access. The resulting contract will have a three-year term, with a budget of 150,000 dollars for the current fiscal year. The contract will be awarded to the responsive and responsible bidder offering the lowest total price based on combined unit prices per tenth of a mile for the three primary services. Bidders must be registered in the MyFloridaMarketPlace and SunBiz systems. Required submission documents include a signed ITB Acknowledgement Form, a Price Sheet, and a References Form, all delivered in a sealed envelope by the deadline of October 16, 2026. Notably, subcontracting is strictly prohibited. Performance is subject to specific restrictions, including a ban on work during quota hunts, and must adhere to the South Florida Water Management District’s Best Management Practices and various state and federal regulations, including the Davis-Bacon Act and Build America, Buy America provisions.
Florida Fish and Wildlife Conservation Commission

POSTED

about 13 hours ago

DEADLINE

in 2 days
View Details
NAICS: 561730
New
SLED
City of Norton - Mowing and Care of Public Land
Solicitation # 49256
The City of Norton is soliciting proposals for the mowing and care of public land, covering approximately 33.78 acres across various city properties, including the City Building Complex, several municipal parks, and cemeteries. The contract is for a one-year term beginning in 2027, with two optional one-year renewals. The mowing season runs from April 1 through November 31, requiring weekly mowing, trimming, and edging for general turf, while athletic fields require twice-weekly service during peak spring and autumn windows. Contractors must adhere to strict quality standards, maintaining grass heights between 2 and 2.5 inches and removing all cuttings to an approved composting facility. An alternate bid is also requested for the on-call removal of tall grass and weeds. Sealed proposals must be submitted in person to the City Administration building by 10:00 a.m. on November 4, 2026, as online submissions will not be accepted. The contract will be awarded to the lowest and best bidder who provides a complete proposal, including all required bid forms, an equipment list, and references. Bidders must provide a bid bond for 100 percent of the bid or a certified check for 10 percent. Additionally, the selected contractor must maintain comprehensive general liability and auto liability insurance with a 1 million dollar combined single limit, provide workers compensation insurance, and ensure all operations meet OSHA safety standards and the Ohio Manual of Uniform Traffic Control Devices.
City of Norton

POSTED

about 14 hours ago

DEADLINE

in 14 days
View Details
NAICS: 561730
New
SLED
IT, Lot Cleanup, Vegetation Control, Debris Removal, and Metal Product Decommissioning and Removing
Solicitation # RFP-Lot-Cleanup-CCT-IT-10_15.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for comprehensive lot cleanup, vegetation control, debris removal, and metal product decommissioning services for designated lots in Nespelem and Omak, Washington. The scope of work requires the contractor to provide all necessary labor, equipment, and transportation to perform grass cutting, weed and vegetation control, and the removal of loose garbage and abandoned materials. Additionally, the contractor is responsible for the decommissioning and removal of designated products, equipment, and fixtures, ensuring all waste is transported to authorized disposal or recycling facilities in compliance with local, state, and federal regulations. A final site inspection is required to ensure properties are left in a clean, safe, and orderly condition, with a mandate to immediately report any discovered hazardous or contaminated materials. Proposals must be submitted by 3:00 p.m. PST on November 5, 2026, and should not exceed 30 single-spaced pages. Evaluation is based on a 100-point scale considering reliability, effectiveness, and budget, with a specific preference for responsible Indian Offerors whose prices are within 10 percent of the lowest non-Indian bid. The contract term is for an as-needed period of up to three years, subject to yearly tribal appropriations and funding availability. Selected contractors must provide proof of insurance, professional resumes for key personnel, and a certification regarding debarment and suspension. Furthermore, contracts exceeding 100,000 dollars require a performance bond; otherwise, a 25 percent retainage will be applied.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Department Of Veterans Affairs → 241-NETWORK Contract Office 01 (36C241)

Same awarding agency

NAICS: 561730
New
Federal
S208--Landscaping and Snow Removal Services
Solicitation # 36C24127Q0019
Solicitation 36C24127Q0019 is a combined synopsis and request for quotations issued by the Department of Veterans Affairs for landscaping and snow removal services at the Providence VA Medical Center, the VA Facility at 500 Valley Street, and the Harwood Center in Providence, Rhode Island. This procurement is a total set-aside for Veteran-Owned Small Businesses under NAICS code 561730. The contract structure consists of one base year and four option years, with an estimated start date of November 1, 2026. The scope of work encompasses comprehensive grounds maintenance, including lawn mowing, trimming, edging, and debris removal for approximately 5.28 acres, as well as snow removal, ice control for pedestrians and roads, and off-site snow hauling limited to 500 cubic yards annually. The government will utilize a comparative evaluation process to determine the best benefit, considering technical quality, past performance, and total evaluated price, including a six-month extension under FAR 52.217-8. Key deliverables include a snow removal logistics plan and strict adherence to acceptable quality levels, with 100 percent compliance required for snow and ice control services. Offerors must submit their responses by October 21, 2026, and must include a signed VA Notice of Limitations on Subcontracting Certificate of Compliance to be eligible for award. Invoicing is to be processed through the Tungsten Network. Amendment 0001 further refined the performance work statement, pricing structure, and provided industry clarifications regarding weather reporting and equipment protocols.
Landscaping Services

POSTED

2 days ago

DEADLINE

in about 10 hours
View Details
NAICS: 561720
New
Federal
S201--Janitorial Services CBOC'S
Solicitation # 36C24127Q0022
The Department of Veterans Affairs, Network Contracting Officer 1 New England, is soliciting quotes for janitorial services for four Community-Based Outpatient Clinics (CBOCs) located in Portsmouth, Conway, Tilton, and Somersworth, New Hampshire. This procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 561720. The contractor will be responsible for providing all labor, supplies, chemicals, equipment, and supervision to perform routine cleaning tasks, including restroom sanitation, trash removal, dusting, vacuuming, mopping, and disinfection. The anticipated period of performance includes a base year starting December 1, 2026, with four subsequent one-year options extending through November 30, 2031. Award will be determined through a comparative evaluation of quotes based on price, technical capability, and past performance. To be rated acceptable, offerors must demonstrate corporate experience with at least one similar project within the last four years, provide a detailed technical approach and staffing plan, and submit three relevant references. Compliance with OSHA, JCAHO, and National Center for Patient Safety standards is required, and specific security credentialing guidelines apply to the Portsmouth location. Invoices must be submitted electronically via the Tungsten Program. Responses are due by November 3, 2026, at 10:00 AM EST.
Janitorial Services

POSTED

6 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS