Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Connecticut was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Backfilling and Compaction

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between 80 million and 100 million dollars, with a solicitation expected around March 15, 2027. Construction is slated to begin in September 2027 and span approximately two years, divided into two dredging seasons ending August 31, 2029. The scope involves the mechanical dredging of approximately 5.5 million cubic yards of material using closed clamshell buckets. The work is divided into two primary sequences. First, the contractor must construct a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, which includes digging an access channel and excavating 3.2 million cubic yards of material for disposal at four designated sites. Second, the contractor will perform maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth, removing approximately 2.3 million cubic yards of material to be placed in the newly constructed CAD cell. Strict operational requirements include maintaining a production rate of 300,000 cubic yards every 30 calendar days, working 24 hours a day, 7 days a week. All activities must adhere to prescribed environmental windows to protect aquatic wildlife, and extensions to these windows are not permitted. Interested firms must demonstrate experience with mechanical dredging at the required production rate and open water placement in New England during winter months. Capabilities packages are due by December 3, 2026.
W2SD Endist New England

POSTED

about 5 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract requires the backfilling of utility trenches using suitable material that must be compacted in controlled lifts to ensure proper settlement prevention and compliance with inspection standards. This work is critical to maintaining the structural integrity of the infrastructure and ensuring long-term performance of buried utilities. All materials and compaction methods must meet specified engineering requirements to pass regulatory and project inspections. This is a subcontract solicitation issued by DAS Procurement under the Connecticut agency, with a NAICS code of 237990, indicating it falls under other heavy and civil engineering construction. The solicitation was posted on June 5, 2026, with a response deadline of June 18, 2026, at 2:00 PM. The place of performance is unspecified but will be within Connecticut, and all bids must be submitted through the official DAS Procurement portal.

General Info

Backfill and compact utility trenches in Connecticut per engineering specs by June 18, 2026, via DAS Procurement.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → DAS Procurement
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Backfilling of utility trenches with suitable material and compaction in lifts to prevent settlement and meet inspection standards.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS