Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on October 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Baird Middle School Administration Building Alterations

Closed
State & Local
Submission Closed
Solicitation #
27-12

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
DB Major M&R Sector Lake MIchigan, INTERNAL
Solicitation # 70ZS0127RCLEV00018
The Bristol Alliance of Companies is soliciting design-build services for major maintenance and repairs at the U.S. Coast Guard Sector Lake Michigan in Milwaukee, Wisconsin. This firm fixed-price project, estimated between $5 million and $10 million, involves a comprehensive scope of work including the remodel of the Sector Command Center with a redundant HVAC system and independent emergency power, building envelope repairs featuring the replacement of brick and masonry veneer with insulated metal panels, and the replacement of roof and window systems. Additional requirements include HVAC reconfiguration at the Sector Building, roof and boiler replacement at the Station/UPH Building, and the reconfiguration of UPH restroom facilities. The contractor must utilize an architecture and engineering firm licensed in the State of Wisconsin and adhere to strict security standards, including valid security clearances for personnel handling classified information. The project has a projected period of performance of 350 calendar days, with on-site work commencing within 10 days of the notice to proceed. Award will be granted to the lowest total priced responsive offeror, with proposals due by December 17, 2026. Key administrative details include liquidated damages of $222.29 per day for delays and a requirement for performance and payment bonds within 10 business days of award. All work must comply with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) and applicable International Building Codes. There is no set-aside status for this solicitation.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new plumbing fixtures and partitions, updating doors and life-safety components, and repainting interior surfaces. Key technical upgrades involve installing new raised flooring and electrical distribution to support classroom needs, replacing variable air volume (VAV) systems using Automated Logic Corporation components, and correcting plumbing deficiencies. The project is a Total Small Business Set-Aside and is structured as a Firm Fixed Price contract. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three factors of equal importance: Past Performance, Corporate Relevant Experience, and Price. Contractors must provide payment and performance bonds, adhere to Davis-Bacon Act wage determinations, and comply with ADA accessibility guidelines. Deliverables include four electronic and one hard copy of Operation and Maintenance manuals submitted within 30 days of the Beneficial Occupancy Date. The solicitation is managed by the Department of Homeland Security, with a final proposal deadline of December 02, 2026.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 involves the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Site improvements encompass paving, drainage upgrades, and hazardous materials abatement. The project is estimated to cost between $10M and $25M with a completion period of 730 days, and the award will be based on the lowest price. The project is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Proposals are due by December 2, 2026. Bond requirements vary by proposal value, with those $150K and greater requiring bid, payment, and performance bonds. Key personnel requirements specify that the Quality Control Manager must be a stand-alone position, though the Superintendent and Site Safety and Health Officer roles may be combined. All work must adhere to NFPA 70, UL standards, and 36 CFR 1191 for accessibility. This solicitation is not set aside for any specific category.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, issued by NAVFAC Northwest ROICC Kitsap, focuses on repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at Naval Base Kitsap in Bremerton, Washington. The scope of work includes addressing a Risk Assessment Code Level 4 deficiency by extending fire sprinklers to Building 719, installing a code-compliant locking system for sprinkler control valves in the basement elevator pits of Building 290, and installing missing backflow preventers on wet pipe sprinkler system risers. The contractor is responsible for producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials, labor, and performance testing. The project is an 8(a) Multiple Award Construction Contract (MACC) with a Firm Fixed-Price structure and an estimated magnitude between $1 million and $5 million. The period of performance is 440 days from the date of award. Evaluation for the award will be based on price and MACC past performance. Key technical requirements include compliance with NFPA 13 standards, UFC 4-010-06 cybersecurity standards for facility-related control systems, and specific hazardous waste handling and labeling protocols. Proposals must be submitted via the PIEE portal by December 16, 2026.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 involves a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated to have a construction magnitude between $10 million and $25 million. The scope is divided into two critical phases, requiring the facility to remain operational and mission-capable throughout the process. Phase 1 focuses on engineering design and general renovations, while Phase 2 involves the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contractor must manage multiple mobilization and demobilization cycles to accommodate operational constraints. The project requires strict adherence to NAVFAC, UFC, and IBC standards, with specific requirements for cybersecurity (ATO), fire protection, and electronic security system acceptance testing. The basis of award is Price Only with MACC Past Performance. The period of performance requires work to commence within 15 calendar days of award, with the base bid (CLIN 0001) due within 360 days and an option (CLIN 0002) due within 1082 days. Proposals must be submitted via the PIEE portal, and the contract incorporates various DFARS and FAR clauses regarding cybersecurity, domestic material preferences, and labor regulations.
Bristol Alliance of Companies

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
Federal
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
Solicitation 26-144 is for a full roof replacement of the 1963 LBJ building at the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams & Associates for the U.S. Department of Labor. The project is necessitated by persistent leaks and storm damage, including missing shingles and a damaged roof ridge cap. This is a Small Business set-aside opportunity open to SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. A mandatory site visit is scheduled for December 3, 2026, at 11:00 AM, and proposals must be submitted by December 14, 2026. The contract will be awarded based on best value, evaluated on a 100-point scale covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum contract with a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, and certification of compliance with Davis Bacon Act wage rates. Required documentation includes a W9, vendor questionnaire, and proof of a valid Indiana state contractor's license. The contractor must adhere to EPA and OSHA regulations, as well as state and local building codes. Insurance requirements include automobile liability coverage of at least $200,000 per person and $500,000 per occurrence, and workers compensation meeting state statutory limits. The project includes a one-year workmanship guarantee and a two-year manufacturer's product warranty. Payment terms are Net 30, and the center is tax-exempt.
Atterbury Job Corps – Adams & Associates

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
Federal
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the P084 Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additional site improvements include an underground stormwater retention system, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking, and exterior lighting. Option 1 includes the construction of a separate 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. The solicitation is issued by J&J Contractors, Inc. and is designated as a Small Business set-aside, including Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, and Veteran Owned Small Business designations. The project is based on Davis Bacon Wage Rates and is exempt from sales tax. Bidding is open for various trades including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, and plumbing. Interested parties should contact Rahul Maheshwari to receive bid invitations and documents via Building Connected.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in about 10 hours

AI Contract Overview

Show more

Fresno Unified School District is soliciting sealed bids for Bid No. 27-12, regarding alterations to the Baird Middle School Administration building and associated site modifications. The project is estimated at approximately 273,064 dollars and must be completed within 120 calendar days. To be considered responsive, prime contractors must hold a valid Class B Contractor License and attend a mandatory pre-bid conference and job-walk held on October 16, 2026, at the school site. All bids must be submitted electronically via the Procureware portal by 4:00 P.M. on October 29, 2026. Submissions must include a certified check, cashier's check, or bidder's bond for at least ten percent of the total bid amount payable to Fresno Unified. The district reserves the right to accept or reject any bids and will provide preliminary results through the online portal following the unsealing process. Questions regarding the solicitation should be directed to Marisa Thibodeaux.

General Info

Fresno Unified seeks Class B bids for Baird Middle School alterations by October 29.

Documents

2
PDF, High priority: read this firstitb
High
PDF, Low priority9 pages · bidders-list
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

6 mandatory

12 requirements in 6 areas

  • Submission6 · 4 must
    001

    Bid Submission Process

  • Eligibility1 · 1 must
    007

    Contractor Licensing Requirements

  • Management1 · 1 must
    011

    Project Completion Timeline

  • 9 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 12 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 19 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno Unified School District
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Return to Bid List Bid NUMBER 27-12 TITLE Baird Middle School Administration Building Alterations PROCESS One Step Unsealing BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 13 days: 6 hours: 37 minutes: 18 seconds DESCRIPTION BID DOCUMENTS BIDDERS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER 27-12 TITLE Baird Middle School Administration Building Alterations AVAILABLE DATE 10/12/2026 10:00 AM CLARIFICATION DEADLINE 10/20/2026 5:00 PM DUE DATE 10/29/2026 4:00 PM CONTACT INFORMATION Please use the Clarification tab to submit Bid questions. Otherwise please call Sign up to see this detail for Technical Support. BID TYPE Formal Bid BILL TO Facilities, 4600 N. Brawley Ave., Fresno, CA 93722 US SHIP TO Facilities, 4600 N. Brawley Ave., Fresno, CA 93722 US DESCRIPTION
ONLINE BID OPENING: PRELIMINARY BID RESULTS ARE AVAILABLE ON THE RESULTS TAB
As soon as the buyer un-seals all bids, preliminary results are available.
After comprehensive review, the final bid results will be sent out to all bidders.
Optionally, you may attend on Teams using the information provided below.
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
Microsoft Teams meeting 
Join: https://teams.microsoft.com/meet/226822835009054?p=sgYW6VYYawSmVQAyGb
Meeting ID: 226 822 835 009 054 
Passcode: bF2W8HG7 
Need help? | System reference
Dial in by phone 
Sign up to see this detail,,63720457# United States, Fresno 
Find a local number
Phone conference ID: 637 204 57# 
For organizers: Meeting options | Reset dial-in PIN
________________________________________________________________________________
__________________________________________________________
FRESNO UNIFIED SCHOOL DISTRICT 00 11 00 NOTICE TO BIDDERS
NOTICE INVITING BIDS PURSUANT TO PUBLIC CONTRACT CODE 22000, ET SEQ. (THE UNIFORM PUBLIC CONSTRUCTION COST ACCOUNTING ACT)
Notice is hereby given that the Fresno Unified School DISTRICT (“DISTRICT”) will receive sealed bids for Bid No. 27-12, Baird Middle School Administration Building Alterations, to alter existing Administration building and site modifications.
Prime Contractor must have a valid Class “B” Contractor’s License.
The time allowed for completion for the project shall be 120 Calendar days.
The Architect/Engineers’ estimate for this project is around $273,064 (estimate as of September 2026)
A MANDATORY pre-bid conference has been scheduled at 11:00 AM, October 16, 2026 in front of the Administration Office at Baird Middle School, 5500 N. Maroa Avenue, Fresno CA 93704 .  Contractors bidding as a Prime Contractor for the project must attend in order for their bid to be “responsive”.  Immediately following the pre-bid conference will be a mandatory job-walk of the site(s). All visitors must check-in at the school office using our visitor management system which requires ID verification via government-issued identification card or driver’s license to receive a badge and enter the campus. Bidders may arrive earlier than the scheduled time to obtain their badge.
Sealed Bids must be received prior to 4:00 P.M. on October 29, 2026  on Procureware, the DISTRICT’s online bidding portal, after which time the bids will be opened and bid results posted.
Bids shall be accompanied by a certified check, cashier’s check, or a bidder’s bond in an amount not less than ten percent (10%) of total bids made payable to Fresno Unified. 
Bid documents may be downloaded at no charge from the district’s bidding portal, Procureware, at: https://fresnousdpurchasing.procureware.com/home.  All bids must be submitted through the portal. Refer questions to Marisa Thibodeaux Sign up to see this detail.
The District reserves the right to accept or reject any or all bids, or any combination of bids and to waive any irregularities or informalities which may be legally waived.
Published: October 12, 2026 

BID EVENTS (1 record) TITLE ATTENDANCE REQUIRED TO BID DESCRIPTION LOCATION REGISTRATION CUTOFF DATE EVENT START DATE EVENT END DATE CANCELLED ATTACHED FILE FILE DESCRIPTION MANDATORY pre-bid conference Yes Contractors bidding as a Prime Contractor for the project must attend in order for their bid to be “responsive”. Immediately following the pre-bid conference will be a mandatory job-walk of the site. in front of the Administration Office at Baird Middle School, 5500 N. Maroa Avenue, Fresno CA 93704 10/16/2026 11:00 AM 10/16/2026 12:00 PM No BID CATEGORIES CODE TITLE FULL NAME

More opportunities from California → Fresno Unified School District

Same awarding agency

NAICS: 236220
SLED
Norseman Elementary School ModernizationThe Fresno Unified School District is implementing the Norseman Elementary School Modernization Project at 4636 East Weldon Avenue, Fresno, California. Funded by Measure H bonds, the project involves the modernization of a 12.4 to 15.2-acre campus through the demolition of approximately 27,850 square feet of aging facilities and the construction of roughly 28,500 square feet of new classroom, early learning, and administration buildings. The total campus space will reach approximately 64,100 square feet. The scope also includes upgrading outdoor learning and recreation areas, improving parking and student drop-off circulation, and performing limited off-site traffic safety improvements within public rights-of-way. Construction is scheduled to take place between June 2028 and August 2029 and will be phased to ensure the school remains operational. The project is designed to comply with Division of the State Architect standards as well as state building, accessibility, energy efficiency, and safety requirements. Environmental oversight is a primary focus, with a Mitigated Negative Declaration and a Phase I Environmental Site Assessment already conducted to address potential soil contamination, hazardous materials, and air quality impacts. Key mitigation measures include pre-construction nesting bird surveys, the implementation of noise and vibration controls, and protocols to halt work if cultural or paleontological resources are discovered. The project will prioritize electric infrastructure and mechanical equipment to enhance sustainability and will not increase student enrollment or campus capacity.
Commercial and Institutional Building Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS