Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Bakersfield Yard Overhead Fencing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves installing a 12-foot-high wrought iron security fence along the embankment beneath the Bakersfield Yard Overhead on State Route 99 at Post Mile 24.8 in Bakersfield, Kern County. The fence will include one 4-foot-wide pedestrian gate and one 10-foot-wide swing gate, both accompanied by a 2-foot-wide concrete security edge to enhance perimeter control and public safety. All construction activities will be conducted strictly within the designated rights-of-way belonging to Caltrans and the railroad, ensuring compliance with existing land use and access regulations. The work is designed to improve security along this corridor by preventing unauthorized access to the area under the bridge deck. The project is forecasted by Caltrans District 6 – Fresno/Bakersfield with a posted date of June 16, 2026, and no solicitation number has been assigned yet. Primary contact for inquiries is Judith Lopez, Senior Environmental Scientist Supervisor, reachable via phone or email. The place of performance is clearly identified as Bakersfield, California, and all work will remain within state and railroad corridors. There is no set-aside information or NAICS code provided, and the project is currently in a forecast phase, indicating it is in the planning or pre-solicitation stage ahead of formal procurement.

General Info

Install 12-foot wrought iron fence with two gates and concrete edge along SR-99 in Bakersfield for security.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Bakersfield, CA

Set-Aside

NONE

Documents

(2)

06-1J920 CEQA NEPA Categorical Exclusion Determination Form

PDFcategorical-exclusion-form

NOE-06-1J920 Bakersfield Yard Overhead Fencing Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A
Contacts
Judith LopezSenior Environmental Scientist- Supervisor

Full Description

Show more
The proposed project is located on State Route 99 at Post Mile 24.8 in Bakersfield in Kern County. The purpose of the project is to install a security fence on the embankment beneath the Bakersfield Yard Overhead along State Route 99. The scope of work for this project is to place 12' high wrought iron fence with one 4' wide pedestrian gate and one 10' wide swing gate with a 2' concrete security edge on the embankment underneath the bridge deck. All permanent work will be performed within Caltrans right-of-way and Railroad right-of-way.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS