Balboa Island Seawalls Replacement Design Services
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Newport Beach is seeking professional engineering and environmental services for the Balboa Island Seawalls, Boardwalk, and Ferry Landing Replacement project. The scope of work encompasses the design and permitting phases, including detailed topographic surveys, concept-level drawings, and the preparation of final construction documents at 30%, 60%, 90%, and 100% completion. The awarded consultant will be responsible for obtaining environmental approvals through agencies such as the California Coastal Commission and preparing CEQA and NEPA documentation. The contract term begins July 1, 2026, and expires June 30, 2028, with a total compensation limit of $100,000.00 unless prior written authorization is granted. The City utilizes a Qualifications Based Selection process, prioritizing the proposal that best meets its needs over the lowest fee. Key evaluation factors include the consultant's understanding of the project scope, the expertise of the project team specifically regarding seawall design, and overall proposal conformance. Proposals must be submitted via the PlanetBids portal by January 6, 2027, and must be limited to 20 pages. There is no set-aside status for this solicitation. Consultants are required to adhere to community professional standards, provide indemnification to the City, and comply with the California Political Reform Act of 1974 and the Government Claims Act.
General Info
Place of Performance
Set-Aside
Documents
4Read all 4 documents
Due in 49 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownEverything you need to bid on this one
Open the full contract in your free workspace.
- 4 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
- Buyer contactEmail and phone
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Submission deadline
Response Deadline
Organization & Contact Information
Full Description
Notes: The City is not responsible for and accepts no liability in the event a response is late due to any network, internet, or any other technical problem or interruption. It is the responsibility of the Proposer to ensure that their Proposal is received before the stated deadline. Staff may be contacted at +1 (•••) •••-••••Sign up to see this detail to verify receipt of proposals. In the event Proposers cannot submit Proposals electronically, Proposers must contact the RFP Administrator and staff to make arrangements for hard copy delivery PRIOR to the RFP deadline.
Bid Bond: 0.00%
Similar Contracts
Same NAICS industry code
More opportunities from California → Public Works Department of City of Newport Beach
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
