Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of Transportation was posted on March 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Barbed Wire Security Upgrade

Closed
Federal
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Federal
IOOF Main Dorm Flat Roof Replacement Project
Solicitation # ioof-main-dorm-flat-roof-replacement-project
This is a subcontracting opportunity with Flint Hills Job Corps Center and Serrato Corporation for the IOOF Main Dorm Flat Roof Replacement Project in Manhattan, Kansas. The scope of work involves replacing failed rolled asphalt roofing on four dormitory wings, totaling approximately 6,800 square feet. The contractor is required to remove existing roofing down to the deck, conduct asbestos testing prior to demolition, and install a new 60 mil, fully adhered EPDM white membrane system with poly isocyanate tapered insulation. The project includes the installation of three new scuppers, commercial grade downspouts, and walk pads for mechanical equipment, with a requirement for a 20-year NDL warranty. All work must be completed within 30 consecutive business days and comply with NRCA, SMACNA, EPA, and OSHA regulations. The project is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Award will be granted to the responsible contractor whose proposal is most advantageous to Serrato Corporation, with price being the primary evaluation factor. Proposals must include a detailed pricing schedule breaking down labor, materials, and other costs, along with a W-9, DUNS number, applicable licenses, and a Certificate of Liability Insurance. The project is subject to the Davis-Bacon Act, requiring adherence to prevailing wage rates for Riley County, Kansas. Proposals are due by December 10, 2026.
Flint Hills Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 14 days
NAICS: 238160
New
SLED
Moonlight Amphitheatre Roof Replacement Project
Solicitation # 20261124035
The Moonlight Amphitheatre Roof Replacement Project is a solicitation issued by the City of Vista, California, for the installation of a complete, warrantable, and watertight roofing system. The scope of work includes the removal and disposal of the existing roofing system down to the insulation, repairing or replacing damaged insulation, installing coverboard, and applying torch-applied base and cap sheets. Additional requirements include flashing installation, perimeter and coping work, drainage improvements, and ductwork coating. All work must be completed within 60 working days after the Notice to Proceed and must adhere to the 2024 Standard Specifications for Public Works Construction and specific design standards. The contract will be awarded to the lowest responsible bidder based on the total amount of the Base Bid Items. Bidders must possess the required licensing, provide project references of comparable magnitude, and be registered with the California Department of Industrial Relations. A preference is available for Local Business Entities that meet specific licensing and employment criteria, allowing them to match the lowest bid if they are within five percent of it. Submissions must be made electronically via the OpenGov Procurement portal by December 15, 2026. The project requires compliance with California prevailing wage laws and the provision of performance and payment bonds.
CITY OF VISTA

POSTED

1 day ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Barbed Wire Security Upgrade is a subcontract managed by 6973GH Franchise Acquisition Svcs under the Department of Transportation. The project involves the installation of three strands of outward-angled barbed wire on top of an existing 12-foot fence to reach a total height of 13 feet, ensuring compliance with FAA anti-climb standards. The work is located in Fremont, California, and falls under NAICS code 238160. The solicitation was posted on March 15, 2026, with a response deadline of March 20, 2026. There is no specified set-aside status for this procurement.

General Info

NAICS

238160 - Roofing Contractors

Place of Performance

Fremont, CA, 94536, USA

Set-Aside

NONE

Documents

This scope was carved out of 6973GH-26-R-00021.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ZOA ARTCC Replace Security Fence

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • IOOF Main Dorm Flat Roof Replacement ProjectOpen now, due in 14 days
  • Cavity Wall RemediationOpen now, due in 40 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6973GH Franchise Acquisition Svcs
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install three strands of outward-angled barbed wire on top of 12-foot fence to achieve 13-foot total height meeting FAA anti-climb standards.

More opportunities from Department Of Transportation → 6973GH Franchise Acquisition Svcs

Same awarding agency

NAICS: 237110
New
Federal
Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades
Solicitation # 6973GH-27-R-00005
The Federal Aviation Administration (FAA) is seeking proposals for the Industrial Wastewater Treatment Plant (IWTP) and Collection System Upgrades at the Mike Monroney Aeronautical Center (MMAC) in Oklahoma City, Oklahoma. This project is a Total Small Business Set-Aside with an estimated price range between $10,000,000 and $20,000,000. The scope of work includes the construction of a new IWTP building and processing equipment, as well as the supply, installation, and integration of all necessary instrumentation. Additional optional bids are available for the demolition of the existing IWTP and lift stations. Award will be based on the Lowest Price, Technically Acceptable (LPTA) method. To be considered acceptable, offerors must demonstrate relevant experience, including at least two multi-discipline construction projects valued at $5 million or more and one wastewater treatment project valued at $2 million or more, all completed or underway within the last seven years. The contract requires a performance bond equal to 100 percent of the contract price, a payment bond, and a bid bond. Compliance with the Davis-Bacon Act, Buy American Act, and ADA standards is mandatory. All proposals must be submitted electronically to Andre Casiano, with a final submission deadline of December 4, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

about 20 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
Federal
Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.
Solicitation # 6973GH-26-R-00082
Solicitation 6973GH-26-R-00082 is a negotiated bid for the mechanical and electrical upgrades of the Headquarters Building at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. The project scope includes comprehensive system upgrades, with a base bid and six optional items covering HVAC ductwork, lighting controls, fire alarm systems, and an Emergency Responder Radio Coverage System. The estimated contract value ranges from $18 million to $25 million, with a performance period of 887 calendar days following the notice to proceed. This is a non-set-aside procurement. The award will be based on a trade-off between price and past performance, with past performance being the most critical factor. Technical proposals are evaluated on a pass/fail basis, and key personnel, including the Construction Project Manager and Construction Superintendent, must have at least seven years of experience and two similar multi-discipline projects. Bidders must provide a performance bond for 100 percent of the contract price and a payment bond. Compliance with the Mike Monroney Aeronautical Center Environmental Management and Occupational Safety and Health Management Systems is mandatory, and all work must adhere to City of Oklahoma City and Oklahoma County regulations.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS