Mike Monroney Aeronautical Center (MMAC) Industrial Waste Water Treatment Plant Upgrades

Active
6973GH-27-R-00005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Federal Aviation Administration is seeking proposals for the Industrial Wastewater Treatment Plant (IWTP) and Collection System Upgrade at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma. This negotiated procurement is a total small business set-aside with an estimated price range between $10,000,000 and $20,000,000. The primary scope of work involves the construction of a new IWTP building and processing equipment, including earthwork, utility trenching, foundation construction, and the installation of sanitary sewerage piping. Optional bids may be requested for the demolition of existing lift stations and the current IWTP. Award will be determined using the Lowest Price, Technically Acceptable (LPTA) process. To be considered acceptable, offerors must demonstrate significant experience, including at least two multi-discipline construction projects valued at $5 million or more and one wastewater treatment project valued at $2 million or more, all completed within the last seven years. Key personnel requirements include a Project Manager and Superintendent, each with at least seven years of experience and a history of managing projects valued at $5 million or more. Additionally, proposed site infrastructure subcontractors must provide evidence of at least two wastewater-related projects valued at $250,000 or more. Prospective bidders must attend a mandatory pre-proposal conference and site visit on November 2, 2026; failure to attend will result in disqualification. Proposals are due by November 19, 2026, and must be submitted electronically in separate sections for technical and price evaluations. The contract requires a 100 percent performance bond, a payment bond, and a bid bond. Compliance with the Davis-Bacon Act for prevailing wages, the FAA Buy American Preference for steel and manufactured goods, and strict MMAC construction safety and environmental standards is mandatory.

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Oklahoma City, OK, 73169, USA

Set-Aside

SBA

Documents

16

Amendment 0001 to Solicitation 6973GH-27-R-00005

PDF, High priority: read this firstamendment
High

Davis-Bacon Act Wage Determination OK20260049

PDF, High priority: read this first8 pages · wage-determination
High

FAA MMAC IWTP Specifications Volume III - Common Work Results for Fire Suppression

PDF, High priority: read this first983 pages · specifications
High

FAA MMAC IWTP Specifications Volume II - Section 02 41 16 Structure Demolition

PDF, High priority: read this first384 pages · specifications
High

MMAC IWTP and Collection System Upgrade - 95% Submission Drawings

PDF, High priority: read this firstspecifications
High

MMAC IWTP and Collection System Upgrade Specifications Volume I

PDF, High priority: read this first139 pages · specifications
High

Solicitation 6973GH-27-R-00005: MMAC IWTP and Collection System Upgrade

PDF, High priority: read this first75 pages · rfp
High

AMP400-ENV-OC-2.4.3-CC Operational Control Document

PDF, Low priority14 pages · other
Low

Attachment 8 Contractor Release

PDF, Low priority1 page · other
Low

Client Authorization Letter - FAA SIR/RFO 6973GH-27-R-00005

DOCX, Low priority1 page · past-performance
Low

MMAC Chapter 33 Construction Safety Program

PDF, Low priority9 pages · other
Low

Past Performance Experience Information Form

DOCX, Low priority2 pages · past-performance
Low

Past Performance Survey - Industrial Wastewater Treatment Plant Upgrades

DOCX, Low priority4 pages · past-performance
Low

Standard Form 24 - Bid Bond

PDF, Low priority2 pages · bid-bond
Low

Standard Form 25A Payment Bond

PDF, Low priority2 pages · payment-bond
Low

Standard Form 25 - Performance Bond

PDF, Low priority2 pages · performance-bond
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6973GH Franchise Acquisition Svcs
Contacts1 person available
OfficeOKLAHOMA CITY, OK, 73125, USA
Office AddressOKLAHOMA CITY, OK, 73125, USA

Full Description

Show more

The Federal Aviation Administration (FAA), Mike Monroney Aeronautical Center (MMAC) is seeking proposals from sources capable of completing CONSTRUCTION PROJECT: Industrial Wastewater Treatment Plant Upgrades at the Mike Monroney Aeronautical Center 


This procurement is a total small business set-aside


The Estimate Price Range: $10,000,000 and $20,000,000


Please read the attached Solicitation in it's entirety and all other Attachments. Follow the instructions outlined in Sections L & M for submitting a responsive proposal. Please include the solicitation number 6973GH-27-R-00005 in the subject line of all email correspondence as indicated in Section L of the SIR


***ATTENTION: REVIEW SECTION L.1 OF THE SIR FOR THE MANDATORY SITE VISIT INSTRUCTIONS***


Prospective offerors are REQUIRED to attend a MANDATORY pre-proposal conference/site visit to be held at 10:00 a.m. Central Time, Monday, November 2, 2026 at the Mike Monroney Aeronautical Center. The conference will be held for the purpose of site investigation and permit general discussions regarding this Screening Information Request.

IMPORTANT NOTICE: Proposals from offerors who did not attend the pre-proposal conference WILL NOT be considered for award

Offerors are allowed to send a maximum of three (3) individuals to represent their proposal (to include proposal teams, if applicable). Please advise the Contracting Officer, Andre Casiano, at andre.casiano@faa.gov in writing of your intent to attend by 12:00 p.m. Central Time, Friday, October 30th, 2026. Telephone requests will NOT count as notification of attendance. The Contracting Officer will send out information regarding visitor/vehicle passes and initial meetup location, no later than 2:00 p.m. Central Time, Friday, October 30th, 2026 to ONLY those that have provided the required response information. Your request must include the following information:


(1) Name of company represented
(2) Name and title of representative
(3) Phone number of representative
(4) Email address of representative
 


-------UPDATE October 21, 2026-------
Amendment 0001 is hereby posted, Please see attached “Amend 0001 6973GH-27-R-00005"


This amendment incorporates the below clauses and provision to the SIR
a) AMS Clause 3.6.4-3 BUY AMERICAN ACT - CONSTRUCTION MATERIALS (JAN 2024)

b) AMS Clause 3.6.4-4 BUY AMERICAN ACT AND FAA BUY AMERICAN PREFERENCE – CONSTRUCTION MATERIALS UNDER UNITED STATES-MEXICO-CANADA AGREEMENT (JAN 2024)

c) AMS Clause 3.6.4-8 BUY AMERICAN ACT AND FAA BUY AMERICAN PREFERENCE - USMCA IMPLEMENTATION ACT - BALANCE OF PAYMENTS PROGRAM (JAN 2024)

d) AMS Provision 3.6.4-18 CERTIFICATION REGARDING STEEL AND MANUFACTURED GOODS (APR 2022)

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Department Of Transportation → 6973GH Franchise Acquisition Svcs

Same awarding agency

NAICS: 611519
New
Federal
INVESTIGATIVE INTERVIEWING TRAINING COURSE
Solicitation # 6973GH-26-R-00229
Solicitation 6973GH-26-R-00229 is a firm fixed-price recompete effort issued by the Department of Transportation for the Federal Aviation Administration to provide Investigative Interviewing training. The objective is to equip FAA Airworthiness Inspectors and Engineers with ethical, outcome-based interviewing tools using the P.E.A.C.E. Model (Plan and Preparation, Engage and Explain, Account – Clarification and Challenge, Closure and Evaluation). This training supports various critical functions, including Safety Hotline, Whistleblower, and Suspected Unapproved Parts investigations, as well as quality system audits and enforcement investigations. The contract structure consists of a base year running from November 1, 2026, to October 31, 2027, with four subsequent option years extending through October 31, 2031. The FAA estimates a requirement for five classes annually, with each class limited to 20 students and providing approximately 40 hours of instructor-led training at a U.S.-based brick-and-mortar facility. Award will be made to a single offeror based on the Lowest Priced Technically Acceptable (LPTA) approach. Technical acceptability requires a detailed training syllabus, a description of facilities, and instructors possessing at least five years of professional investigative interviewing experience, including three years specifically with the P.E.A.C.E. model and three years of teaching experience. Contractors must adhere to strict quality and legal standards, ensuring training does not induce high psychological stress or contain content associated with religious or new age belief systems. Key deliverables include the provision of all course materials on the first day of training and the issuance of PDF certificates of completion for each attendee. Administrative requirements include electronic submission of payment requests and strict adherence to security protocols regarding the handling of Controlled Unclassified Information. Proposals must be submitted in separate technical and price volumes via email to the designated point of contact.
Other Technical and Trade Schools

POSTED

about 8 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS