Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Georgia was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Base Course Installation (Aggregate Base)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. Managed by Ranger Pipelines Incorporated, the work involves the rehabilitation of covered and open concrete structures, relining and replacement of small and large diameter steel and ductile iron pipes, and the installation of valves and piping appurtenances. The scope further includes the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to electrical and instrumentation systems, replacement of motor control center components, and modifications to sluice and slide gates. Additional tasks include installing platforms for access, rerouting sump pump discharge lines, excavation, trench work, and surveying. The project has an estimated contract value between $18.5 million and $19.5 million, with a bid opening date of December 2, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The solicitation specifically seeks certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and electrical work, requiring all participants to comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 3 hours ago

DEADLINE

in 10 days
NAICS: 238990
New
International
Security Enhancement Works: Motorized Sliding Compound Main Gates and Safe Room Security Reinforcement – UNICEF Jigjiga Field Office NA NA - [email hidden]
Solicitation # LRFP-2026-9207436
UNICEF has issued solicitation LRFP-2026-9207436 for security enhancement works at the Jigjiga Field Office in Ethiopia. The project is a non-LTA for construction works divided into two primary components: the supply and installation of three heavy-duty motorized sliding steel gates (5m x 3m) with pedestrian gates and reinforced-concrete foundations, and the security reinforcement of a safe room involving external security grills and double-steel-plated protection for windows and doors. The contractor is responsible for full fabrication, installation, testing, commissioning, and providing training for UNICEF security staff, as well as delivering as-built drawings and maintenance documentation. The contract requires a performance security of 10% of the total price, a 5% retention, and a 12-month equipment warranty and defects liability period. Work must commence by December 31, 2026, with a seven-day mobilization period and a total implementation timeframe of two and a half calendar months. Award evaluation is based on a 70% technical and 30% financial weighting, with a minimum technical pass threshold of 49/70. Technical criteria include the provision of specific equipment such as concrete mixers, generators, and transport vehicles, as well as financial standing and capacity. All works must comply with Ethiopian national laws and international standards including ASTM, ACI, IEC, ISO, and NFPA. There is no set-aside status specified for this solicitation.
UNICEF

POSTED

about 23 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The Bleckley County Board of Commissioners in Georgia is seeking a subcontractor for the Base Course Installation project. This contract focuses on the placement and compaction of aggregate base material as a critical component of the GDBP process across two project segments. The work falls under NAICS code 238990, covering all other miscellaneous building construction activities. The solicitation was posted on August 13, 2026, with a response deadline set for September 4, 2026, at 6:00 PM. Interested parties can find further details and submission guidelines through the Georgia Department of Administrative Services portal.

General Info

Bleckley County seeks a subcontractor for aggregate base course installation by September 4, 2026.

Documents

This scope was carved out of PE-61200-NONST-2026-000000008.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bleckley Co. TIA Brodhead Road Phase I, II, & III

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 11 days
  • EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Bleckley County Board of Commissioners
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Placement and compaction of aggregate base material as part of the GDBP process on both project segments.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS